Proposal:H.014225.6
Parish:Bossier
Routes:LA 528
Description:LA 528: CLARKE BAYOU BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,221,214.25
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $2,619,358.05 |
| 2 | 01516 | Elevate Heavy Civil Construction, LLC | $2,895,500.01 |
| 3 | 55505 | MERRICK, LLC | $2,930,826.85 |
| 4 | 49239 | WL Bass Construction Inc. | $2,969,838.09 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $3,654,551.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - Elevate Heavy Civil Construction, LLC | - 3 - MERRICK, LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.6 | LUMP | 30,000.00 | 30,000.00 | 150,000.00 | 150,000.00 | 25,000.00 | 25,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 4,200.00 | 4,200.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 124 | SQYD | 15.50 | 1,922.00 | 22.00 | 2,728.00 | 43.00 | 5,332.00 | 4.00 | 496.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 2,964.8 | SQYD | 6.00 | 17,788.80 | 16.00 | 47,436.80 | 7.00 | 20,753.60 | 10.00 | 29,648.00 | | 0005 | 202-02-04501 | Removal of Bridge STR NO. 04080107012281 (STA. 108+07.36; 28' x 95' COPCSS) | 2,660 | LUMP | 140,000.00 | 140,000.00 | 50,000.00 | 50,000.00 | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 616 | LNFT | 18.00 | 11,088.00 | 8.00 | 4,928.00 | 10.50 | 6,468.00 | 12.00 | 7,392.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) Site 1 | 109 | LNFT | 25.00 | 2,725.00 | 18.00 | 1,962.00 | 18.00 | 1,962.00 | 15.00 | 1,635.00 | | 0008 | 203-02-00100 | Drainage Excavation | 706 | CUYD | 25.00 | 17,650.00 | 26.00 | 18,356.00 | 32.00 | 22,592.00 | 12.00 | 8,472.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 85,000.00 | 85,000.00 | 54,000.00 | 54,000.00 | 95,000.00 | 95,000.00 | 70,000.00 | 70,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 250.00 | 500.00 | 150.00 | 300.00 | 180.00 | 360.00 | 250.00 | 500.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,798 | LNFT | 4.00 | 7,192.00 | 3.00 | 5,394.00 | 3.00 | 5,394.00 | 5.00 | 8,990.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 3,358.4 | SQYD | 41.00 | 137,694.40 | 52.00 | 174,636.80 | 48.00 | 161,203.20 | 50.00 | 167,920.00 | | 0013 | 302-03-00100 | Base Drain Outlet | 7 | EACH | 650.00 | 4,550.00 | 1,200.00 | 8,400.00 | 780.00 | 5,460.00 | 3,000.00 | 21,000.00 | | 0014 | 304-01-00100 | Lime | 47.61 | TON | 400.00 | 19,044.00 | 1.00 | 47.61 | 450.00 | 21,424.50 | 450.00 | 21,424.50 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 3,358 | SQYD | 4.65 | 15,614.70 | 1.00 | 3,358.00 | 4.00 | 13,432.00 | 8.48 | 28,475.84 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 22.4 | CUYD | 165.00 | 3,696.00 | 160.00 | 3,584.00 | 190.00 | 4,256.00 | 150.00 | 3,360.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 150.00 | 6,000.00 | 114.00 | 4,560.00 | 205.00 | 8,200.00 | 150.00 | 6,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 495.1 | TON | 185.00 | 91,593.50 | 284.00 | 140,608.40 | 300.00 | 148,530.00 | 265.00 | 131,201.50 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 79.3 | TON | 210.00 | 16,653.00 | 310.00 | 24,583.00 | 350.00 | 27,755.00 | 310.00 | 24,583.00 | | 0020 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 82 | SQYD | 210.00 | 17,220.00 | 260.00 | 21,320.00 | 300.00 | 24,600.00 | 280.00 | 22,960.00 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 214 | LNFT | 120.00 | 25,680.00 | 120.00 | 25,680.00 | 145.00 | 31,030.00 | 135.00 | 28,890.00 | | 0022 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 306.3 | LNFT | 38.00 | 11,639.40 | 28.00 | 8,576.40 | 40.00 | 12,252.00 | 27.50 | 8,423.25 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 123.00 | 12,300.00 | 160.00 | 16,000.00 | 123.00 | 12,300.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,900.00 | 15,600.00 | 3,700.00 | 14,800.00 | 4,750.00 | 19,000.00 | 3,625.00 | 14,500.00 | | 0026 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 650.00 | 5,850.00 | 650.00 | 5,850.00 | 750.00 | 6,750.00 | 300.00 | 2,700.00 | | 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 250.00 | 2,250.00 | 250.00 | 2,250.00 | 300.00 | 2,700.00 | 300.00 | 2,700.00 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 342 | SQYD | 125.00 | 42,750.00 | 125.00 | 42,750.00 | 130.00 | 44,460.00 | 112.00 | 38,304.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 342 | SQYD | 3.00 | 1,026.00 | 4.00 | 1,368.00 | 3.90 | 1,333.80 | 6.25 | 2,137.50 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 34,000.00 | 34,000.00 | 60,000.00 | 60,000.00 | 138,000.00 | 138,000.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 2,000.00 | 4,000.00 | 2,500.00 | 5,000.00 | 1,750.00 | 3,500.00 | 2,000.00 | 4,000.00 | | 0032 | 717-01-00100 | Seeding | 39 | LB | 25.00 | 975.00 | 25.00 | 975.00 | 45.00 | 1,755.00 | 25.00 | 975.00 | | 0033 | 718-01-00100 | Fertilizer | 1,318 | LB | 1.25 | 1,647.50 | 2.00 | 2,636.00 | 1.50 | 1,977.00 | 1.25 | 1,647.50 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 23,000.00 | 23,000.00 | 4,000.00 | 4,000.00 | 11,200.00 | 11,200.00 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.43 | MILE | 1,200.00 | 516.00 | 400.00 | 172.00 | 1,400.00 | 602.00 | 500.00 | 215.00 | | 0036 | 726-01-00100 | Bedding Material | 22.2 | CUYD | 170.00 | 3,774.00 | 240.00 | 5,328.00 | 245.00 | 5,439.00 | 200.00 | 4,440.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 284,845.00 | 284,845.00 | 290,000.00 | 290,000.00 | 296,000.00 | 296,000.00 | | 0038 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 6.3 | SQFT | 100.00 | 630.00 | 100.00 | 630.00 | 120.00 | 756.00 | 35.00 | 220.50 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 85.00 | 340.00 | 165.00 | 660.00 | 85.00 | 340.00 | | 0040 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 500.00 | 500.00 | 150.00 | 150.00 | 950.00 | 950.00 | 150.00 | 150.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 57 | EACH | 40.00 | 2,280.00 | 40.00 | 2,280.00 | 55.00 | 3,135.00 | 40.00 | 2,280.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.86 | MILE | 10,000.00 | 8,600.00 | 10,000.00 | 8,600.00 | 22,500.00 | 19,350.00 | 10,000.00 | 8,600.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 11,000.00 | 11,000.00 | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 | | 0044 | 804-01-00400 | Precast Concrete Piles (18") | 3,240 | LNFT | 160.00 | 518,400.00 | 180.00 | 583,200.00 | 160.00 | 518,400.00 | 200.00 | 648,000.00 | | 0045 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 7,800.00 | 7,800.00 | 7,800.00 | 7,800.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | 0046 | 804-18-00100 | Vibration Monitoring | 20 | DAY | 900.00 | 18,000.00 | 875.00 | 17,500.00 | 1,200.00 | 24,000.00 | 370.00 | 7,400.00 | | 0047 | 805-01-00100 | Class A1 Concrete (Slab Span) | 276.64 | CUYD | 1,400.00 | 387,296.00 | 1,300.00 | 359,632.00 | 1,800.00 | 497,952.00 | 350.00 | 96,824.00 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 74.66 | CUYD | 2,100.00 | 156,786.00 | 3,300.00 | 246,378.00 | 3,000.00 | 223,980.00 | 350.00 | 26,131.00 | | 0049 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | 2.00 | 3,764.00 | 2.50 | 4,705.00 | 1.00 | 1,882.00 | | 0050 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | 3.00 | 5,646.00 | 3.25 | 6,116.50 | 1.00 | 1,882.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 61,769 | LB | 1.75 | 108,095.75 | 2.00 | 123,538.00 | 1.25 | 77,211.25 | 3.50 | 216,191.50 | | 0052 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 240.00 | 67,200.00 | 220.00 | 61,600.00 | 210.00 | 58,800.00 | 280.00 | 78,400.00 | | 0053 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 150.00 | 192,000.00 | 181.00 | 231,680.00 | 125.00 | 160,000.00 | 151.00 | 193,280.00 | | 0054 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 203 | SFIN | 140.00 | 28,420.00 | 88.00 | 17,864.00 | 190.00 | 38,570.00 | 210.00 | 42,630.00 | | 0055 | 815-03-00300 | Joint Seal (Poured) | 296 | LNFT | 30.00 | 8,880.00 | 24.00 | 7,104.00 | 5.00 | 1,480.00 | 35.00 | 10,360.00 | | 0056 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 222 | LNFT | 6.00 | 1,332.00 | 26.00 | 5,772.00 | 6.00 | 1,332.00 | 25.00 | 5,550.00 | | 0057 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 370 | LNFT | 5.00 | 1,850.00 | 7.00 | 2,590.00 | 4.00 | 1,480.00 | 1.00 | 370.00 | | 0058 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 357 | INLF | 1.00 | 357.00 | 7.00 | 2,499.00 | 4.00 | 1,428.00 | 1.00 | 357.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,619,358.05 | | 2,895,500.01 | | 2,930,826.85 | | 2,969,838.09 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.6 | LUMP | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 38,000.00 | 38,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 124 | SQYD | 40.00 | 4,960.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 2,964.8 | SQYD | 19.00 | 56,331.20 | | 0005 | 202-02-04501 | Removal of Bridge STR NO. 04080107012281 (STA. 108+07.36; 28' x 95' COPCSS) | 2,660 | LUMP | 250,000.00 | 250,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 616 | LNFT | 10.00 | 6,160.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) Site 1 | 109 | LNFT | 48.00 | 5,232.00 | | 0008 | 203-02-00100 | Drainage Excavation | 706 | CUYD | 37.00 | 26,122.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 150.00 | 300.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,798 | LNFT | 6.00 | 10,788.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 3,358.4 | SQYD | 45.00 | 151,128.00 | | 0013 | 302-03-00100 | Base Drain Outlet | 7 | EACH | 1,600.00 | 11,200.00 | | 0014 | 304-01-00100 | Lime | 47.61 | TON | 250.00 | 11,902.50 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 3,358 | SQYD | 6.00 | 20,148.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 22.4 | CUYD | 300.00 | 6,720.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 300.00 | 12,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 495.1 | TON | 260.00 | 128,726.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 79.3 | TON | 310.00 | 24,583.00 | | 0020 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 82 | SQYD | 220.00 | 18,040.00 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 214 | LNFT | 200.00 | 42,800.00 | | 0022 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 12,000.00 | 12,000.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 306.3 | LNFT | 27.50 | 8,423.25 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 123.00 | 12,300.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,625.00 | 14,500.00 | | 0026 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 650.00 | 5,850.00 | | 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 250.00 | 2,250.00 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 342 | SQYD | 150.00 | 51,300.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 342 | SQYD | 3.00 | 1,026.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 2,500.00 | 5,000.00 | | 0032 | 717-01-00100 | Seeding | 39 | LB | 25.00 | 975.00 | | 0033 | 718-01-00100 | Fertilizer | 1,318 | LB | 1.50 | 1,977.00 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.43 | MILE | 400.00 | 172.00 | | 0036 | 726-01-00100 | Bedding Material | 22.2 | CUYD | 300.00 | 6,660.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | | 0038 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 6.3 | SQFT | 45.00 | 283.50 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | | 0040 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 150.00 | 150.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 57 | EACH | 40.00 | 2,280.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.86 | MILE | 10,000.00 | 8,600.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 120,000.00 | 120,000.00 | | 0044 | 804-01-00400 | Precast Concrete Piles (18") | 3,240 | LNFT | 203.00 | 657,720.00 | | 0045 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 7,800.00 | 7,800.00 | | 0046 | 804-18-00100 | Vibration Monitoring | 20 | DAY | 875.00 | 17,500.00 | | 0047 | 805-01-00100 | Class A1 Concrete (Slab Span) | 276.64 | CUYD | 1,100.00 | 304,304.00 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 74.66 | CUYD | 3,000.00 | 223,980.00 | | 0049 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,882 | SQFT | 3.00 | 5,646.00 | | 0050 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,882 | SQFT | 5.00 | 9,410.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 61,769 | LB | 2.00 | 123,538.00 | | 0052 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 170.00 | 47,600.00 | | 0053 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 170.00 | 217,600.00 | | 0054 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 203 | SFIN | 200.00 | 40,600.00 | | 0055 | 815-03-00300 | Joint Seal (Poured) | 296 | LNFT | 30.00 | 8,880.00 | | 0056 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 222 | LNFT | 25.90 | 5,749.80 | | 0057 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 370 | LNFT | 6.75 | 2,497.50 | | 0058 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 357 | INLF | 7.00 | 2,499.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,654,551.75 |
|