Proposal:H.014086.6
Parish:St. James
Routes:US 61
Description:US 61: ST. JOHN PL - ASCENSION PL
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, CABLE BARRIER SYSTEM, CONCRETE STRIP, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$13,113,608.87
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $13,040,027.99 |
| 2 | 06276 | Barriere Construction Co., LLC | $13,095,111.00 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $13,322,840.35 |
| 4 | 73475 | Madden Gulf Coast, LLC | $14,274,106.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,756 | SQYD | 12.69 | 34,973.64 | 14.00 | 38,584.00 | 13.00 | 35,828.00 | 14.00 | 38,584.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 3,000 | LNFT | 7.76 | 23,280.00 | 10.00 | 30,000.00 | 7.00 | 21,000.00 | 6.75 | 20,250.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 27,106.19 | 27,106.19 | 30,000.00 | 30,000.00 | 55,000.00 | 55,000.00 | 25,000.00 | 25,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 102 | CUYD | 95.53 | 9,744.06 | 60.00 | 6,120.00 | 80.00 | 8,160.00 | 151.00 | 15,402.00 | | 0005 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 3,250 | SQYD | 35.91 | 116,707.50 | 38.00 | 123,500.00 | 44.00 | 143,000.00 | 40.00 | 130,000.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 50,247.9 | TON | 110.62 | 5,558,422.70 | 116.00 | 5,828,756.40 | 118.00 | 5,929,252.20 | 118.00 | 5,929,252.20 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 719.2 | TON | 144.72 | 104,082.62 | 50.00 | 35,960.00 | 220.00 | 158,224.00 | 155.00 | 111,476.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 400,905 | SQYD | 2.47 | 990,235.35 | 2.85 | 1,142,579.25 | 3.00 | 1,202,715.00 | 2.60 | 1,042,353.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -18,378 | CUYD | 0.01 | -183.78 | 0.01 | -183.78 | 0.00 | 0.00 | 0.01 | -183.78 | | 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 11,205 | SQYD | 183.32 | 2,054,100.60 | 117.00 | 1,310,985.00 | 145.00 | 1,624,725.00 | 152.00 | 1,703,160.00 | | 0011 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 2,662.25 | 10,649.00 | 4,800.00 | 19,200.00 | 4,500.00 | 18,000.00 | 3,000.00 | 12,000.00 | | 0012 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 3,611.00 | 3,611.00 | 5,500.00 | 5,500.00 | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | | 0013 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,200 | LNFT | 52.61 | 63,132.00 | 41.00 | 49,200.00 | 48.00 | 57,600.00 | 45.75 | 54,900.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,662.5 | LNFT | 30.19 | 80,380.88 | 26.00 | 69,225.00 | 28.00 | 74,550.00 | 26.25 | 69,890.63 | | 0015 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 63.25 | 6,325.00 | 51.00 | 5,100.00 | 58.00 | 5,800.00 | 75.00 | 7,500.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 133.98 | 53,592.00 | 102.00 | 40,800.00 | 122.00 | 48,800.00 | 116.50 | 46,600.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 16 | EACH | 3,910.00 | 62,560.00 | 3,502.00 | 56,032.00 | 3,600.00 | 57,600.00 | 3,400.00 | 54,400.00 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 63.2 | SQYD | 132.83 | 8,394.86 | 95.00 | 6,004.00 | 180.00 | 11,376.00 | 110.00 | 6,952.00 | | 0019 | 707-01-00100 | Concrete Curb | 1,138 | LNFT | 14.11 | 16,057.18 | 33.00 | 37,554.00 | 50.00 | 56,900.00 | 29.00 | 33,002.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 416,300.00 | 416,300.00 | 805,000.00 | 805,000.00 | 350,000.00 | 350,000.00 | 700,000.00 | 700,000.00 | | 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 948 | LNFT | 0.58 | 549.84 | 0.50 | 474.00 | 0.50 | 474.00 | 0.50 | 474.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.09 | MILE | 189.75 | 5,140.33 | 64.00 | 1,733.76 | 325.00 | 8,804.25 | 350.00 | 9,481.50 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 54.18 | MILE | 747.50 | 40,499.55 | 650.00 | 35,217.00 | 650.00 | 35,217.00 | 650.00 | 35,217.00 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 108.36 | MILE | 1,035.00 | 112,152.60 | 900.00 | 97,524.00 | 900.00 | 97,524.00 | 900.00 | 97,524.00 | | 0025 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 63 | EACH | 28.75 | 1,811.25 | 25.00 | 1,575.00 | 25.00 | 1,575.00 | 25.00 | 1,575.00 | | 0026 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 24 | EACH | 28.75 | 690.00 | 25.00 | 600.00 | 25.00 | 600.00 | 25.00 | 600.00 | | 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 57 | EACH | 28.75 | 1,638.75 | 25.00 | 1,425.00 | 25.00 | 1,425.00 | 25.00 | 1,425.00 | | 0028 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 57.50 | 345.00 | 50.00 | 300.00 | 50.00 | 300.00 | 50.00 | 300.00 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 35.332 | MILE | 316.23 | 11,173.04 | 865.00 | 30,562.18 | 300.00 | 10,599.60 | 1,000.00 | 35,332.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 339,117.75 | 339,117.75 | 450,000.00 | 450,000.00 | 650,000.00 | 650,000.00 | 1,400,000.00 | 1,400,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 30 | SQFT | 131.08 | 3,932.40 | 35.00 | 1,050.00 | 110.00 | 3,300.00 | 113.98 | 3,419.40 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 97.75 | 1,564.00 | 95.00 | 1,520.00 | 90.00 | 1,440.00 | 85.00 | 1,360.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 97.75 | 3,128.00 | 254.00 | 8,128.00 | 105.00 | 3,360.00 | 85.00 | 2,720.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,889 | EACH | 8.05 | 15,206.45 | 7.00 | 13,223.00 | 7.50 | 14,167.50 | 7.00 | 13,223.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,854 | LNFT | 3.45 | 13,296.30 | 3.00 | 11,562.00 | 3.20 | 12,332.80 | 3.00 | 11,562.00 | | 0036 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 576 | LNFT | 6.90 | 3,974.40 | 6.00 | 3,456.00 | 6.30 | 3,628.80 | 6.00 | 3,456.00 | | 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 323 | LNFT | 13.80 | 4,457.40 | 12.00 | 3,876.00 | 12.60 | 4,069.80 | 12.00 | 3,876.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 316 | LNFT | 16.10 | 5,087.60 | 14.00 | 4,424.00 | 14.70 | 4,645.20 | 14.00 | 4,424.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 36.12 | MILE | 4,600.00 | 166,152.00 | 4,000.00 | 144,480.00 | 4,200.00 | 151,704.00 | 4,000.00 | 144,480.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 18.06 | MILE | 1,437.50 | 25,961.25 | 1,250.00 | 22,575.00 | 1,300.00 | 23,478.00 | 1,250.00 | 22,575.00 | | 0041 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.377 | MILE | 6,954.91 | 2,622.00 | 6,000.00 | 2,262.00 | 6,200.00 | 2,337.40 | 6,000.00 | 2,262.00 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 21 | EACH | 345.00 | 7,245.00 | 300.00 | 6,300.00 | 315.00 | 6,615.00 | 300.00 | 6,300.00 | | 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 345.00 | 2,760.00 | 300.00 | 2,400.00 | 315.00 | 2,520.00 | 300.00 | 2,400.00 | | 0044 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 19 | EACH | 345.00 | 6,555.00 | 300.00 | 5,700.00 | 315.00 | 5,985.00 | 300.00 | 5,700.00 | | 0045 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 575.00 | 1,150.00 | 500.00 | 1,000.00 | 315.00 | 630.00 | 500.00 | 1,000.00 | | 0046 | 736-01-00100 | Trenching and Backfilling | 340 | LNFT | 14.29 | 4,858.60 | 11.00 | 3,740.00 | 13.00 | 4,420.00 | 10.98 | 3,733.20 | | 0047 | 736-03-00100 | Jacking or Boring | 1,430 | LNFT | 24.74 | 35,378.20 | 29.00 | 41,470.00 | 22.00 | 31,460.00 | 28.94 | 41,384.20 | | 0048 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 3 | EACH | 24,650.97 | 73,952.91 | 26,000.00 | 78,000.00 | 22,000.00 | 66,000.00 | 25,119.23 | 75,357.69 | | 0049 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 28,600.50 | 28,600.50 | 29,000.00 | 29,000.00 | 26,000.00 | 26,000.00 | 28,965.23 | 28,965.23 | | 0050 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 4 | EACH | 1,823.90 | 7,295.60 | 1,500.00 | 6,000.00 | 1,670.00 | 6,680.00 | 1,424.62 | 5,698.48 | | 0051 | 736-09-00100 | Loop Detector | 2,790 | LNFT | 35.93 | 100,244.70 | 35.00 | 97,650.00 | 32.00 | 89,280.00 | 34.37 | 95,892.30 | | 0052 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 1,205.50 | 7,233.00 | 1,500.00 | 9,000.00 | 1,100.00 | 6,600.00 | 1,507.35 | 9,044.10 | | 0053 | 736-10-00300 | Underground Junction Box (Type F) | 4 | EACH | 1,366.20 | 5,464.80 | 1,700.00 | 6,800.00 | 1,250.00 | 5,000.00 | 1,719.52 | 6,878.08 | | 0054 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 200 | LNFT | 12.54 | 2,508.00 | 6.50 | 1,300.00 | 12.00 | 2,400.00 | 6.40 | 1,280.00 | | 0055 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,670 | LNFT | 9.63 | 16,082.10 | 9.50 | 15,865.00 | 9.00 | 15,030.00 | 9.42 | 15,731.40 | | 0056 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,920 | LNFT | 4.14 | 20,368.80 | 4.00 | 19,680.00 | 4.00 | 19,680.00 | 4.09 | 20,122.80 | | 0057 | 736-12-10014 | Conductor (10c, #14 awg) | 1,130 | LNFT | 7.72 | 8,723.60 | 5.00 | 5,650.00 | 7.00 | 7,910.00 | 4.86 | 5,491.80 | | 0058 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 8,156.95 | 32,627.80 | 12,000.00 | 48,000.00 | 7,450.00 | 29,800.00 | 11,647.91 | 46,591.64 | | 0059 | 737-05-00002 | Painted Curbs | 1,138 | LNFT | 2.30 | 2,617.40 | 2.00 | 2,276.00 | 2.10 | 2,389.80 | 2.00 | 2,276.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,791.05 | 25,791.05 | 27,717.19 | 27,717.19 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | | 0062 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,912 | INLF | 1.15 | 2,198.80 | 35.00 | 66,920.00 | 1.00 | 1,912.00 | 2.00 | 3,824.00 | | 0063 | NS-704-00001 | High Tension Cable Barrier | 30,524 | LNFT | 25.30 | 772,257.20 | 24.00 | 732,576.00 | 19.00 | 579,956.00 | 23.00 | 702,052.00 | | 0064 | NS-704-00002 | Cable Barrier Gated End Terminal | 30 | EACH | 12,427.67 | 372,830.10 | 8,000.00 | 240,000.00 | 11,000.00 | 330,000.00 | 7,900.00 | 237,000.00 | | 0065 | NS-704-00003 | Concrete Strip | 17,124 | SQYD | 62.13 | 1,063,914.12 | 66.00 | 1,130,184.00 | 65.00 | 1,113,060.00 | 65.00 | 1,113,060.00 | | 0066 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 20,700.00 | 41,400.00 | 21,000.00 | 42,000.00 | 12,000.00 | 24,000.00 | 15,000.00 | 30,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,040,027.99 | | 13,095,111.00 | | 13,322,840.35 | | 14,274,106.87 |
|