Proposal:H.011993.6
Parish:St. Landry
Routes:LA 10
Description:LA 10: BAYOU CARRON BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE DECK GIRDER BRIDGE, GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PRECAST CONCRETE PILES, GAS LINE INSTALLATION, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$5,441,791.60
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $4,597,086.74 |
| 2 | 55505 | MERRICK, LLC | $4,896,296.91 |
| 3 | 01516 | Elevate Heavy Civil Construction, LLC | $4,898,780.39 |
| 4 | 49239 | WL Bass Construction Inc. | $4,904,410.00 |
| 5 | 00009 | Coastal Contractors, LLC | $5,586,182.50 |
| 6 | 44187 | RNGD Infrastructure LLC | $6,417,417.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - MERRICK, LLC | - 3 - Elevate Heavy Civil Construction, LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.5 | LUMP | 250,000.00 | 250,000.00 | 75,000.00 | 75,000.00 | 500,000.00 | 500,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | 11,000.00 | 11,000.00 | 8,000.00 | 8,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 3,538.5 | SQYD | 8.00 | 28,308.00 | 8.00 | 28,308.00 | 9.00 | 31,846.50 | 15.00 | 53,077.50 | | 0004 | 202-02-04501 | Removal of Bridge (Sta. 111+99; 182' x 35.5' (Concrete Deck Girder Bridge)) | 6,461 | LUMP | 150,000.00 | 150,000.00 | 420,000.00 | 420,000.00 | 250,000.00 | 250,000.00 | 246,600.00 | 246,600.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 277 | LNFT | 15.00 | 4,155.00 | 16.00 | 4,432.00 | 10.00 | 2,770.00 | 11.00 | 3,047.00 | | 0006 | 203-02-00100 | Drainage Excavation | 3,900 | CUYD | 20.00 | 78,000.00 | 15.00 | 58,500.00 | 20.00 | 78,000.00 | 22.00 | 85,800.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 175,000.00 | 175,000.00 | 125,000.00 | 125,000.00 | 140,000.00 | 140,000.00 | 182,600.00 | 182,600.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 40.00 | 320.00 | 25.00 | 200.00 | 35.00 | 280.00 | 35.00 | 280.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,700 | LNFT | 2.50 | 4,250.00 | 3.00 | 5,100.00 | 2.50 | 4,250.00 | 5.00 | 8,500.00 | | 0010 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 3,107.1 | SQYD | 54.00 | 167,783.40 | 50.00 | 155,355.00 | 35.00 | 108,748.50 | 65.00 | 201,961.50 | | 0011 | 304-01-00100 | Lime | 43 | TON | 300.00 | 12,900.00 | 285.00 | 12,255.00 | 400.00 | 17,200.00 | 450.00 | 19,350.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2,973.5 | SQYD | 10.00 | 29,735.00 | 2.90 | 8,623.15 | 6.00 | 17,841.00 | 8.00 | 23,788.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 120.00 | 6,000.00 | 170.00 | 8,500.00 | 135.00 | 6,750.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 808.2 | TON | 250.00 | 202,050.00 | 295.00 | 238,419.00 | 250.00 | 202,050.00 | 255.00 | 206,091.00 | | 0015 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 104 | SQYD | 160.00 | 16,640.00 | 295.00 | 30,680.00 | 250.00 | 26,000.00 | 300.00 | 31,200.00 | | 0016 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 50 | LNFT | 30.00 | 1,500.00 | 40.00 | 2,000.00 | 48.00 | 2,400.00 | 25.00 | 1,250.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 135.00 | 13,500.00 | 118.00 | 11,800.00 | 95.00 | 9,500.00 | | 0018 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,000.00 | 12,000.00 | 4,000.00 | 16,000.00 | 3,500.00 | 14,000.00 | 3,150.00 | 12,600.00 | | 0019 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 600.00 | 7,200.00 | 650.00 | 7,800.00 | 600.00 | 7,200.00 | 250.00 | 3,000.00 | | 0020 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 200.00 | 2,400.00 | 250.00 | 3,000.00 | 200.00 | 2,400.00 | 250.00 | 3,000.00 | | 0021 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,100 | SQYD | 90.00 | 189,000.00 | 85.00 | 178,500.00 | 94.00 | 197,400.00 | 110.00 | 231,000.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 2,100 | SQYD | 4.00 | 8,400.00 | 4.00 | 8,400.00 | 3.00 | 6,300.00 | 5.00 | 10,500.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0024 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 120 | EACH | 6.00 | 720.00 | 7.74 | 928.80 | 15.00 | 1,800.00 | 6.00 | 720.00 | | 0025 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | 12,000.00 | 12,000.00 | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 480,000.00 | 480,000.00 | 480,000.00 | 480,000.00 | 490,000.00 | 490,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 50.00 | 200.00 | 70.00 | 280.00 | 100.00 | 400.00 | 150.00 | 600.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 64 | EACH | 6.00 | 384.00 | 7.74 | 495.36 | 6.00 | 384.00 | 6.00 | 384.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.72 | MILE | 10,000.00 | 7,200.00 | 11,000.00 | 7,920.00 | 8,000.00 | 5,760.00 | 10,000.00 | 7,200.00 | | 0030 | 739-01-00100 | Hydro-Seeding | 4.5 | ACRE | 2,500.00 | 11,250.00 | 3,400.00 | 15,300.00 | 2,800.00 | 12,600.00 | 2,750.00 | 12,375.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 70,000.00 | 70,000.00 | | 0032 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 190.00 | 19,000.00 | 200.00 | 20,000.00 | 370.00 | 37,000.00 | 410.00 | 41,000.00 | | 0033 | 804-01-00600 | Precast Concrete Piles (24") | 1,420 | LNFT | 220.00 | 312,400.00 | 300.00 | 426,000.00 | 210.00 | 298,200.00 | 280.00 | 397,600.00 | | 0034 | 804-01-00700 | Precast Concrete Piles (30") | 850 | LNFT | 300.00 | 255,000.00 | 410.00 | 348,500.00 | 340.00 | 289,000.00 | 450.00 | 382,500.00 | | 0035 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 108,000.00 | 108,000.00 | 225,000.00 | 225,000.00 | 100,000.00 | 100,000.00 | 160,000.00 | 160,000.00 | | 0036 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 7,500.00 | 52,500.00 | 3,200.00 | 22,400.00 | 4,500.00 | 31,500.00 | 1,400.00 | 9,800.00 | | 0037 | 805-01-00200 | Class A1 Concrete (Deck) | 299.18 | CUYD | 1,200.00 | 359,016.00 | 1,400.00 | 418,852.00 | 1,340.00 | 400,901.20 | 350.00 | 104,713.00 | | 0038 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 142.94 | CUYD | 2,200.00 | 314,468.00 | 2,000.00 | 285,880.00 | 2,000.00 | 285,880.00 | 350.00 | 50,029.00 | | 0039 | 805-08-01200 | Precast-Prestressed Concrete Girders (Type LG-36) | 1,193 | LNFT | 300.00 | 357,900.00 | 285.00 | 340,005.00 | 290.00 | 345,970.00 | 500.00 | 596,500.00 | | 0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,682 | SQFT | 3.00 | 11,046.00 | 3.00 | 11,046.00 | 2.77 | 10,199.14 | 1.00 | 3,682.00 | | 0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,682 | SQFT | 2.99 | 11,009.18 | 4.00 | 14,728.00 | 3.32 | 12,224.24 | 1.00 | 3,682.00 | | 0042 | 806-01-00100 | Deformed Reinforcing Steel | 95,772 | LB | 1.28 | 122,588.16 | 1.80 | 172,389.60 | 1.48 | 141,742.56 | 2.50 | 239,430.00 | | 0043 | 807-01-00100 | Structural Metalwork (Grade 36) | 129 | LUMP | 1,100.00 | 1,100.00 | 6,500.00 | 6,500.00 | 5,869.98 | 5,869.98 | 15,000.00 | 15,000.00 | | 0044 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 42 | LUMP | 9,000.00 | 9,000.00 | 10,000.00 | 10,000.00 | 5,119.65 | 5,119.65 | 50,000.00 | 50,000.00 | | 0045 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 552 | LNFT | 160.00 | 88,320.00 | 145.00 | 80,040.00 | 162.46 | 89,677.92 | 150.00 | 82,800.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 130.00 | 416,000.00 | 90.00 | 288,000.00 | 124.86 | 399,552.00 | 90.00 | 288,000.00 | | 0047 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 240 | SFIN | 150.00 | 36,000.00 | 200.00 | 48,000.00 | 113.58 | 27,259.20 | 200.00 | 48,000.00 | | 0048 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 80 | LNFT | 375.00 | 30,000.00 | 500.00 | 40,000.00 | 351.81 | 28,144.80 | 440.00 | 35,200.00 | | 0049 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,700 | INLF | 3.00 | 8,100.00 | 2.00 | 5,400.00 | 2.21 | 5,967.00 | 1.00 | 2,700.00 | | 0050 | TS-728-37004 | Installing Pipe, Directional Bore (3" IPS Polyethylene Gas Line) | 760 | LNFT | 35.00 | 26,600.00 | 40.00 | 30,400.00 | 55.36 | 42,073.60 | 90.00 | 68,400.00 | | 0051 | TS-MSC-00350 | Gas Main Gate Valve with Cast Iron Valve Box | 2 | EACH | 2,900.00 | 5,800.00 | 3,200.00 | 6,400.00 | 1,992.82 | 3,985.64 | 7,000.00 | 14,000.00 | | 0052 | TS-MSC-00360 | Connect to Existing Gas Main | 2 | EACH | 8,500.00 | 17,000.00 | 10,000.00 | 20,000.00 | 2,214.25 | 4,428.50 | 8,500.00 | 17,000.00 | | 0053 | TS-MSC-00403 | Gas Line (3") | 760 | LF | 22.00 | 16,720.00 | 25.00 | 19,000.00 | 22.14 | 16,826.40 | 70.00 | 53,200.00 | | 0054 | TS-MSC-00450 | Gas Pipeline Marker | 4 | EACH | 31.00 | 124.00 | 190.00 | 760.00 | 332.14 | 1,328.56 | 500.00 | 2,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,597,086.74 | | 4,896,296.91 | | 4,898,780.39 | | 4,904,410.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Coastal Contractors, LLC | - 6 - RNGD Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.5 | LUMP | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 34,000.00 | 34,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 3,538.5 | SQYD | 28.00 | 99,078.00 | 12.00 | 42,462.00 | | 0004 | 202-02-04501 | Removal of Bridge (Sta. 111+99; 182' x 35.5' (Concrete Deck Girder Bridge)) | 6,461 | LUMP | 195,000.00 | 195,000.00 | 800,000.00 | 800,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 277 | LNFT | 22.00 | 6,094.00 | 12.00 | 3,324.00 | | 0006 | 203-02-00100 | Drainage Excavation | 3,900 | CUYD | 47.00 | 183,300.00 | 25.00 | 97,500.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 274,000.00 | 274,000.00 | 150,000.00 | 150,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 48.00 | 384.00 | 49.00 | 392.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,700 | LNFT | 3.00 | 5,100.00 | 3.00 | 5,100.00 | | 0010 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 3,107.1 | SQYD | 79.00 | 245,460.90 | 45.00 | 139,819.50 | | 0011 | 304-01-00100 | Lime | 43 | TON | 899.00 | 38,657.00 | 200.00 | 8,600.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2,973.5 | SQYD | 20.00 | 59,470.00 | 5.00 | 14,867.50 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 250.00 | 12,500.00 | 100.00 | 5,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 808.2 | TON | 275.00 | 222,255.00 | 250.00 | 202,050.00 | | 0015 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 104 | SQYD | 275.00 | 28,600.00 | 100.00 | 10,400.00 | | 0016 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 50 | LNFT | 35.00 | 1,750.00 | 30.00 | 1,500.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | 100.00 | 10,000.00 | | 0018 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,200.00 | 12,800.00 | 3,000.00 | 12,000.00 | | 0019 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 600.00 | 7,200.00 | 600.00 | 7,200.00 | | 0020 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 200.00 | 2,400.00 | 200.00 | 2,400.00 | | 0021 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,100 | SQYD | 130.02 | 273,042.00 | 110.00 | 231,000.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 2,100 | SQYD | 6.50 | 13,650.00 | 1.00 | 2,100.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0024 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 120 | EACH | 3.00 | 360.00 | 7.50 | 900.00 | | 0025 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 55,000.00 | 55,000.00 | 25,000.00 | 25,000.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 520,000.00 | 520,000.00 | 636,000.00 | 636,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 55.00 | 220.00 | 60.00 | 240.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 64 | EACH | 6.00 | 384.00 | 7.50 | 480.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.72 | MILE | 8,000.00 | 5,760.00 | 12,500.00 | 9,000.00 | | 0030 | 739-01-00100 | Hydro-Seeding | 4.5 | ACRE | 2,500.00 | 11,250.00 | 2,000.00 | 9,000.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 59,000.00 | 59,000.00 | | 0032 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 223.00 | 22,300.00 | 275.00 | 27,500.00 | | 0033 | 804-01-00600 | Precast Concrete Piles (24") | 1,420 | LNFT | 263.00 | 373,460.00 | 350.00 | 497,000.00 | | 0034 | 804-01-00700 | Precast Concrete Piles (30") | 850 | LNFT | 354.00 | 300,900.00 | 550.00 | 467,500.00 | | 0035 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 95,000.00 | 95,000.00 | 50,000.00 | 50,000.00 | | 0036 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 4,500.00 | 31,500.00 | 3,200.00 | 22,400.00 | | 0037 | 805-01-00200 | Class A1 Concrete (Deck) | 299.18 | CUYD | 2,100.00 | 628,278.00 | 2,500.00 | 747,950.00 | | 0038 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 142.94 | CUYD | 3,000.00 | 428,820.00 | 3,500.00 | 500,290.00 | | 0039 | 805-08-01200 | Precast-Prestressed Concrete Girders (Type LG-36) | 1,193 | LNFT | 326.00 | 388,918.00 | 550.00 | 656,150.00 | | 0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,682 | SQFT | 3.00 | 11,046.00 | 5.00 | 18,410.00 | | 0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,682 | SQFT | 3.50 | 12,887.00 | 7.00 | 25,774.00 | | 0042 | 806-01-00100 | Deformed Reinforcing Steel | 95,772 | LB | 1.30 | 124,503.60 | 1.50 | 143,658.00 | | 0043 | 807-01-00100 | Structural Metalwork (Grade 36) | 129 | LUMP | 9,000.00 | 9,000.00 | 1,500.00 | 1,500.00 | | 0044 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 42 | LUMP | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0045 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 552 | LNFT | 200.00 | 110,400.00 | 275.00 | 151,800.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 105.00 | 336,000.00 | 95.00 | 304,000.00 | | 0047 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 240 | SFIN | 155.00 | 37,200.00 | 125.00 | 30,000.00 | | 0048 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 80 | LNFT | 310.00 | 24,800.00 | 450.00 | 36,000.00 | | 0049 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,700 | INLF | 3.15 | 8,505.00 | 2.50 | 6,750.00 | | 0050 | TS-728-37004 | Installing Pipe, Directional Bore (3" IPS Polyethylene Gas Line) | 760 | LNFT | 62.00 | 47,120.00 | 50.00 | 38,000.00 | | 0051 | TS-MSC-00350 | Gas Main Gate Valve with Cast Iron Valve Box | 2 | EACH | 2,215.00 | 4,430.00 | 2,500.00 | 5,000.00 | | 0052 | TS-MSC-00360 | Connect to Existing Gas Main | 2 | EACH | 2,460.00 | 4,920.00 | 30,000.00 | 60,000.00 | | 0053 | TS-MSC-00403 | Gas Line (3") | 760 | LF | 25.00 | 19,000.00 | 40.00 | 30,400.00 | | 0054 | TS-MSC-00450 | Gas Pipeline Marker | 4 | EACH | 370.00 | 1,480.00 | 500.00 | 2,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,586,182.50 | | 6,417,417.00 |
|