Proposal:H.010365.6
Parish:Natchitoches
Routes:LA 117
Description:LA 117: 0.5 MI S OF BELLWOOD TO LA 120
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$9,204,601.88
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $8,459,366.15 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $8,882,397.60 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $10,126,633.11 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Gilchrist Construction Company, LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of (4' X 2' X 2' CONCRETE BRIDGE END BLOCK) | 32 | EACH | 625.00 | 20,000.00 | 2,900.00 | 92,800.00 | 700.00 | 22,400.00 | | 0002 | 202-02-04560 | Removal of Bridge Joint Poured Joint Seal | 1,176 | LNFT | 14.00 | 16,464.00 | 60.00 | 70,560.00 | 21.00 | 24,696.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 6,766 | LNFT | 11.00 | 74,426.00 | 6.50 | 43,979.00 | 12.00 | 81,192.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,231 | CUYD | 40.00 | 49,240.00 | 90.00 | 110,790.00 | 18.00 | 22,158.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,796 | CUYD | 50.00 | 139,800.00 | 50.00 | 139,800.00 | 110.00 | 307,560.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 29,659.4 | TON | 130.00 | 3,855,722.00 | 129.00 | 3,826,062.60 | 155.00 | 4,597,207.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,053.5 | TON | 90.00 | 184,815.00 | 129.00 | 264,901.50 | 235.00 | 482,572.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 128,313 | SQYD | 4.50 | 577,408.50 | 2.75 | 352,860.75 | 2.75 | 352,860.75 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,624 | CUYD | 0.01 | -46.24 | 1.00 | -4,624.00 | 1.00 | -4,624.00 | | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 11,065 | SQYD | 130.00 | 1,438,450.00 | 155.00 | 1,715,075.00 | 190.00 | 2,102,350.00 | | 0011 | 510-02-00100 | Pavement Widening (16" MINIMUM THICKNESS) | 2,583.3 | SQYD | 160.00 | 413,328.00 | 180.00 | 464,994.00 | 160.00 | 413,328.00 | | 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,640 | LNFT | 57.00 | 93,480.00 | 44.00 | 72,160.00 | 60.00 | 98,400.00 | | 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,709.9 | LNFT | 33.00 | 89,426.70 | 28.00 | 75,877.20 | 34.00 | 92,136.60 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 800 | LNFT | 130.00 | 104,000.00 | 123.00 | 98,400.00 | 135.00 | 108,000.00 | | 0015 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,700.00 | 3,700.00 | 2,950.00 | 2,950.00 | 3,750.00 | 3,750.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 15 | EACH | 4,000.00 | 60,000.00 | 3,600.00 | 54,000.00 | 4,100.00 | 61,500.00 | | 0017 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,700.00 | 37,000.00 | 3,300.00 | 33,000.00 | 3,750.00 | 37,500.00 | | 0018 | 707-04-00100 | Asphalt Curb | 432 | LNFT | 50.00 | 21,600.00 | 70.00 | 30,240.00 | 83.00 | 35,856.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 460,000.00 | 460,000.00 | 125,000.00 | 125,000.00 | 120,000.00 | 120,000.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 28.803 | MILE | 300.00 | 8,640.90 | 250.00 | 7,200.75 | 154.00 | 4,435.66 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 19.313 | MILE | 1.00 | 19.31 | 800.00 | 15,450.40 | 800.00 | 15,450.40 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 92.781 | MILE | 1.00 | 92.78 | 1,200.00 | 111,337.20 | 1,200.00 | 111,337.20 | | 0023 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 19.202 | MILE | 1,000.00 | 19,202.00 | 1,000.00 | 19,202.00 | 1,000.00 | 19,202.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 460,000.00 | 460,000.00 | 700,000.00 | 700,000.00 | 700,000.00 | 700,000.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 130.00 | 4,160.00 | 85.00 | 2,720.00 | 135.00 | 4,320.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,685 | EACH | 7.00 | 11,795.00 | 7.00 | 11,795.00 | 8.00 | 13,480.00 | | 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 15.00 | 360.00 | 15.00 | 360.00 | 16.00 | 384.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 30.927 | MILE | 5,200.00 | 160,820.40 | 5,200.00 | 160,820.40 | 5,200.00 | 160,820.40 | | 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.438 | MILE | 2,100.00 | 13,519.80 | 2,100.00 | 13,519.80 | 2,200.00 | 14,163.60 | | 0030 | 735-01-00100 | Mailboxes | 37 | EACH | 20.00 | 740.00 | 20.00 | 740.00 | 1.00 | 37.00 | | 0031 | 735-02-00100 | Mailbox Supports (Single) | 31 | EACH | 300.00 | 9,300.00 | 210.00 | 6,510.00 | 290.00 | 8,990.00 | | 0032 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 400.00 | 1,200.00 | 220.00 | 660.00 | 350.00 | 1,050.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 6.88 | ACRE | 3,750.00 | 25,800.00 | 2,700.00 | 18,576.00 | 2,750.00 | 18,920.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 41,000.00 | 41,000.00 | | 0035 | 815-03-00300 | Joint Seal (Poured) | 1,176 | LNFT | 32.00 | 37,632.00 | 75.00 | 88,200.00 | 20.00 | 23,520.00 | | 0036 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,176 | LNFT | 5.00 | 5,880.00 | 40.00 | 47,040.00 | 3.00 | 3,528.00 | | 0037 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,176 | LNFT | 1.25 | 1,470.00 | 40.00 | 47,040.00 | 2.00 | 2,352.00 | | 0038 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 248,000 | INLF | 0.04 | 9,920.00 | 0.05 | 12,400.00 | 0.10 | 24,800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,459,366.15 | | 8,882,397.60 | | 10,126,633.11 |
|