Proposal:H.016119.6
Parish:St. Landry
Routes:LA 178
Description:LA 178: W. JCT. LA 182 - E. JCT. LA 182
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,896,906.13
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $3,818,716.16 |
| 2 | 33663 | Glenn Lege Construction LLC | $4,733,621.76 |
| 3 | 34356 | Prairie Contractors LLC | $4,800,604.68 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Glenn Lege Construction LLC | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) (0.938 Acres) | 0.938 | LUMP | 30,000.00 | 30,000.00 | 29,350.00 | 29,350.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 52,764.90 | 52,764.90 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 35.6 | SQYD | 60.00 | 2,136.00 | 18.00 | 640.80 | 100.00 | 3,560.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 334 | SQYD | 35.00 | 11,690.00 | 18.00 | 6,012.00 | 65.00 | 21,710.00 | | 0005 | 202-02-04560 | Removal of Bridge Joint Removal of Bridge Joint (Poured Joint Seals) | 1,015 | LNFT | 11.00 | 11,165.00 | 11.62 | 11,794.30 | 12.00 | 12,180.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 759.5 | SQYD | 78.00 | 59,241.00 | 27.81 | 21,121.70 | 35.00 | 26,582.50 | | 0007 | 202-02-14500 | Removal of Guard Rail | 472.2 | LNFT | 16.00 | 7,555.20 | 10.45 | 4,934.49 | 16.00 | 7,555.20 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,307 | CUYD | 45.00 | 58,815.00 | 54.00 | 70,578.00 | 60.00 | 78,420.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 150.00 | 3,900.00 | 174.23 | 4,529.98 | 175.00 | 4,550.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,234 | LNFT | 2.25 | 2,776.50 | 2.49 | 3,072.66 | 7.00 | 8,638.00 | | 0011 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 35,884 | SQYD | 13.50 | 484,434.00 | 14.38 | 516,011.92 | 16.00 | 574,144.00 | | 0012 | 304-01-00100 | Lime | 169 | TON | 350.00 | 59,150.00 | 300.00 | 50,700.00 | 415.00 | 70,135.00 | | 0013 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 17,875 | SQYD | 6.00 | 107,250.00 | 6.20 | 110,825.00 | 5.00 | 89,375.00 | | 0014 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 35,884 | SQYD | 12.50 | 448,550.00 | 14.14 | 507,399.76 | 15.25 | 547,231.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,269 | CUYD | 85.00 | 107,865.00 | 184.12 | 233,648.28 | 85.00 | 107,865.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 100.00 | 20,000.00 | 117.60 | 23,520.00 | 100.00 | 20,000.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 7,706.8 | TON | 135.00 | 1,040,418.00 | 159.18 | 1,226,768.42 | 124.00 | 955,643.20 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,058.2 | TON | 175.00 | 185,185.00 | 198.45 | 209,999.79 | 200.00 | 211,640.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 29,563 | SQYD | 2.50 | 73,907.50 | 1.95 | 57,647.85 | 3.30 | 97,557.90 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,080 | CUYD | 0.01 | -10.80 | 0.01 | -10.80 | 0.01 | -10.80 | | 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 138 | SQYD | 200.00 | 27,600.00 | 168.60 | 23,266.80 | 250.00 | 34,500.00 | | 0022 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 8 | LNFT | 385.00 | 3,080.00 | 290.58 | 2,324.64 | 500.00 | 4,000.00 | | 0023 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 8 | LNFT | 825.00 | 6,600.00 | 690.62 | 5,524.96 | 1,000.00 | 8,000.00 | | 0024 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 36 | LNFT | 465.00 | 16,740.00 | 541.50 | 19,494.00 | 500.00 | 18,000.00 | | 0025 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 515.00 | 24,720.00 | 457.50 | 21,960.00 | 525.00 | 25,200.00 | | 0026 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 37 | LNFT | 710.00 | 26,270.00 | 581.00 | 21,497.00 | 550.00 | 20,350.00 | | 0027 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 80 | LNFT | 120.00 | 9,600.00 | 120.64 | 9,651.20 | 295.00 | 23,600.00 | | 0028 | 701-15-00100 | Concrete Collar | 4 | EACH | 1,400.00 | 5,600.00 | 1,299.92 | 5,199.68 | 2,750.00 | 11,000.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 137 | LNFT | 88.00 | 12,056.00 | 171.17 | 23,450.29 | 8.00 | 1,096.00 | | 0030 | 702-02-00909 | Manholes (MH-14X9) | 1 | EACH | 29,150.00 | 29,150.00 | 30,000.00 | 30,000.00 | 17,000.00 | 17,000.00 | | 0031 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 328 | LNFT | 172.00 | 56,416.00 | 181.49 | 59,528.72 | 175.00 | 57,400.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 156.3 | LNFT | 35.00 | 5,470.50 | 36.59 | 5,719.02 | 42.00 | 6,564.60 | | 0033 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,850.00 | 15,400.00 | 4,042.02 | 16,168.08 | 5,000.00 | 20,000.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 689.5 | SQYD | 220.00 | 151,690.00 | 98.86 | 68,163.97 | 225.00 | 155,137.50 | | 0035 | 712-02-00100 | Sacked Concrete Revetment | 7 | SQYD | 625.00 | 4,375.00 | 561.76 | 3,932.32 | 750.00 | 5,250.00 | | 0036 | 712-04-00100 | Flexible Revetment | 18 | SQYD | 255.00 | 4,590.00 | 125.01 | 2,250.18 | 225.00 | 4,050.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 236,844.95 | 236,844.95 | 400,000.00 | 400,000.00 | | 0038 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.00 | 24.00 | 0.29 | 6.96 | 0.01 | 0.24 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.32 | MILE | 800.00 | 5,856.00 | 681.75 | 4,990.41 | 650.00 | 4,758.00 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.556 | MILE | 550.00 | 3,055.80 | 580.75 | 3,226.65 | 1.00 | 5.56 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.132 | MILE | 880.00 | 18,596.16 | 929.20 | 19,635.85 | 1.00 | 21.13 | | 0042 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 6,275.00 | 12,550.00 | 3,310.28 | 6,620.56 | 20,000.00 | 40,000.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 22,565.00 | 22,565.00 | 20,000.00 | 20,000.00 | | 0044 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.253 | MILE | 1,325.00 | 4,310.23 | 1,393.80 | 4,534.03 | 1,400.00 | 4,554.20 | | 0045 | 726-01-00100 | Bedding Material | 32 | CUYD | 175.00 | 5,600.00 | 132.26 | 4,232.32 | 200.00 | 6,400.00 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 651,071.25 | 651,071.25 | 425,000.00 | 425,000.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 85.00 | 1,190.00 | 87.11 | 1,219.54 | 80.00 | 1,120.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 95.00 | 570.00 | 98.73 | 592.38 | 135.00 | 810.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 406 | EACH | 5.50 | 2,233.00 | 5.81 | 2,358.86 | 6.00 | 2,436.00 | | 0050 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 16.50 | 198.00 | 17.42 | 209.04 | 17.50 | 210.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.044 | MILE | 4,675.00 | 32,930.70 | 4,936.38 | 34,771.86 | 5,000.00 | 35,220.00 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.852 | MILE | 2,585.00 | 4,787.42 | 2,729.53 | 5,055.09 | 2,800.00 | 5,185.60 | | 0053 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.023 | MILE | 5,350.00 | 123.05 | 5,633.28 | 129.57 | 5,750.00 | 132.25 | | 0054 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 1 | EACH | 935.00 | 935.00 | 987.28 | 987.28 | 1,000.00 | 1,000.00 | | 0055 | 732-05-00100 | Removal of Existing Markings | 0.023 | MILE | 1,100.00 | 25.30 | 1,161.50 | 26.71 | 1,200.00 | 27.60 | | 0056 | 735-01-00100 | Mailboxes | 44 | EACH | 22.00 | 968.00 | 29.04 | 1,277.76 | 10.00 | 440.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 44 | EACH | 275.00 | 12,100.00 | 261.34 | 11,498.96 | 310.00 | 13,640.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 1.979 | ACRE | 3,400.00 | 6,728.60 | 3,194.13 | 6,321.18 | 5,000.00 | 9,895.00 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 30,351.51 | 30,351.51 | 225,000.00 | 225,000.00 | | 0060 | 805-16-02100 | Reinforced Concrete Box Culverts (Extension) (8' x 8') | 8 | LNFT | 6,600.00 | 52,800.00 | 7,000.01 | 56,000.08 | 4,500.00 | 36,000.00 | | 0061 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Quantity of Steel = 2,849 pounds, Quantity of Concrete 41.7 cubic yards | 2 | EACH | 49,500.00 | 99,000.00 | 58,300.00 | 116,600.00 | 115,000.00 | 230,000.00 | | 0062 | 815-03-00300 | Joint Seal (Poured) | 1,015 | LNFT | 50.00 | 50,750.00 | 52.27 | 53,054.05 | 55.00 | 55,825.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,818,716.16 | | 4,733,621.76 | | 4,800,604.68 |
|