Proposal:H.016011.6
Parish:Vermilion
Routes:LA 699
Description:LA 699: LA 35 - LA 343
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT STABILIZED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, CULVERT REHAB, AND RELATED WORK.
Estimated Construction Cost:$7,360,870.62
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $6,928,379.70 |
| 2 | 34356 | Prairie Contractors LLC | $7,267,831.49 |
| 3 | 51821 | Elliott Construction, LLC | $8,330,783.59 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.05 | LUMP | 9,749.03 | 9,749.03 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,999.99 | 4,999.99 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,996 | SQYD | 6.62 | 13,213.52 | 32.00 | 63,872.00 | 25.00 | 49,900.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 217.7 | SQYD | 12.41 | 2,701.66 | 40.00 | 8,708.00 | 50.00 | 10,885.00 | | 0005 | 203-02-00100 | Drainage Excavation | 33 | CUYD | 21.00 | 693.00 | 70.00 | 2,310.00 | 75.00 | 2,475.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,500 | CUYD | 27.00 | 40,500.00 | 65.00 | 97,500.00 | 50.00 | 75,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 36 | EACH | 174.23 | 6,272.28 | 200.00 | 7,200.00 | 200.00 | 7,200.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 30,000 | LNFT | 2.32 | 69,600.00 | 2.00 | 60,000.00 | 2.00 | 60,000.00 | | 0009 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 85,095 | SQYD | 10.02 | 852,651.90 | 12.50 | 1,063,687.50 | 15.00 | 1,276,425.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 26.60 | 2,660.00 | 40.00 | 4,000.00 | 50.00 | 5,000.00 | | 0011 | 304-01-00100 | Lime | 248.93 | TON | 296.00 | 73,683.28 | 415.00 | 103,305.95 | 400.00 | 99,572.00 | | 0012 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 21,073 | SQYD | 6.15 | 129,598.95 | 7.00 | 147,511.00 | 6.00 | 126,438.00 | | 0013 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 85,095 | SQYD | 9.41 | 800,743.95 | 8.25 | 702,033.75 | 12.00 | 1,021,140.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4,664 | CUYD | 61.68 | 287,675.52 | 68.00 | 317,152.00 | 60.00 | 279,840.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 116.58 | 23,316.00 | 120.00 | 24,000.00 | 100.00 | 20,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 21,924.2 | TON | 145.63 | 3,192,821.25 | 118.00 | 2,587,055.60 | 150.00 | 3,288,630.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 939.8 | TON | 143.00 | 134,391.40 | 100.25 | 94,214.95 | 200.00 | 187,960.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 67,608 | SQYD | 2.10 | 141,976.80 | 4.60 | 310,996.80 | 4.25 | 287,334.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,978 | CUYD | 0.01 | -59.78 | 0.01 | -59.78 | 0.01 | -59.78 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 213 | SQYD | 151.50 | 32,269.50 | 165.00 | 35,145.00 | 200.00 | 42,600.00 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 93 | LNFT | 381.00 | 35,433.00 | 500.00 | 46,500.00 | 400.00 | 37,200.00 | | 0022 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 110 | LNFT | 456.00 | 50,160.00 | 550.00 | 60,500.00 | 475.00 | 52,250.00 | | 0023 | 701-05-02064 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW) | 170 | LNFT | 107.01 | 18,191.70 | 350.00 | 59,500.00 | 150.00 | 25,500.00 | | 0024 | 701-14-00100 | Cleaning Existing Pipes | 200 | LNFT | 71.44 | 14,288.00 | 75.00 | 15,000.00 | 75.00 | 15,000.00 | | 0025 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,045.25 | 2,045.25 | 2,750.00 | 2,750.00 | 3,500.00 | 3,500.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 217.7 | SQYD | 100.68 | 21,918.04 | 210.00 | 45,717.00 | 130.00 | 28,301.00 | | 0027 | 712-02-00100 | Sacked Concrete Revetment | 64 | SQYD | 511.31 | 32,723.84 | 700.00 | 44,800.00 | 350.00 | 22,400.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 214,877.50 | 214,877.50 | 300,000.00 | 300,000.00 | 150,000.00 | 150,000.00 | | 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 60 | LNFT | 0.29 | 17.40 | 0.01 | 0.60 | 1.00 | 60.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.006 | MILE | 681.75 | 7,503.34 | 1.00 | 11.01 | 895.00 | 9,850.37 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.006 | MILE | 580.75 | 6,391.73 | 1.00 | 11.01 | 550.00 | 6,053.30 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.23 | MILE | 871.13 | 20,236.35 | 900.00 | 20,907.00 | 825.00 | 19,164.75 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,115.38 | 30,115.38 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 5.148 | MILE | 1,161.50 | 5,979.40 | 1,200.00 | 6,177.60 | 1,150.00 | 5,920.20 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.295 | MILE | 1,161.50 | 11,957.64 | 1,200.00 | 12,354.00 | 1,150.00 | 11,839.25 | | 0036 | 726-01-00100 | Bedding Material | 54.1 | CUYD | 105.00 | 5,680.50 | 210.00 | 11,361.00 | 200.00 | 10,820.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 257,019.75 | 257,019.75 | 620,000.00 | 620,000.00 | 750,000.00 | 750,000.00 | | 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 174.23 | 3,136.14 | 100.00 | 1,800.00 | 85.00 | 1,530.00 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 98.73 | 394.92 | 135.00 | 540.00 | 95.00 | 380.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 794 | EACH | 5.81 | 4,613.14 | 5.00 | 3,970.00 | 6.00 | 4,764.00 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 60 | LNFT | 11.62 | 697.20 | 18.00 | 1,080.00 | 11.00 | 660.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.615 | MILE | 4,820.23 | 55,986.97 | 5,000.00 | 58,075.00 | 4,600.00 | 53,429.00 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.503 | MILE | 2,497.23 | 13,742.26 | 1,500.00 | 8,254.50 | 2,500.00 | 13,757.50 | | 0044 | 735-01-00100 | Mailboxes | 78 | EACH | 23.23 | 1,811.94 | 10.00 | 780.00 | 25.00 | 1,950.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 78 | EACH | 261.34 | 20,384.52 | 325.00 | 25,350.00 | 275.00 | 21,450.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 5.39 | ACRE | 3,194.13 | 17,216.36 | 4,000.00 | 21,560.00 | 3,500.00 | 18,865.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 34,087.50 | 34,087.50 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 | | 0048 | NS-701-00020 | Culvert Rehabilitation by Geopolymer Lining | 116 | LNFT | 1,916.48 | 222,311.68 | 1,950.00 | 226,200.00 | 1,300.00 | 150,800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,928,379.70 | | 7,267,831.49 | | 8,330,783.59 |
|