Proposal:H.015999.6
Parish:Lafayette
Routes:LA 724
Description:LA 724: W BROUSSARD - LA 342
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CULVERT REHABILITATION, AND RELATED WORK.
Estimated Construction Cost:$2,378,725.90
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $2,323,424.84 |
| 2 | 33663 | Glenn Lege Construction LLC | $2,507,552.65 |
| 3 | 51821 | Elliott Construction, LLC | $2,721,714.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.10 | 5,000.10 | 5,000.00 | 5,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 858.3 | SQYD | 40.00 | 34,332.00 | 14.00 | 12,016.20 | 30.00 | 25,749.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Poured | 1,477 | LNFT | 12.00 | 17,724.00 | 11.62 | 17,162.74 | 15.00 | 22,155.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 154.4 | LNFT | 17.00 | 2,624.80 | 23.18 | 3,578.99 | 40.00 | 6,176.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 200 | CUYD | 130.00 | 26,000.00 | 28.72 | 5,744.00 | 70.00 | 14,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 200.00 | 5,200.00 | 174.23 | 4,529.98 | 150.00 | 3,900.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 470 | LNFT | 13.00 | 6,110.00 | 3.48 | 1,635.60 | 3.50 | 1,645.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,253 | CUYD | 30.00 | 37,590.00 | 77.91 | 97,621.23 | 80.00 | 100,240.00 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 125.00 | 12,500.00 | 103.00 | 10,300.00 | 100.00 | 10,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 7,141.9 | TON | 120.00 | 857,028.00 | 137.69 | 983,368.21 | 155.00 | 1,106,994.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 599.4 | TON | 190.00 | 113,886.00 | 165.01 | 98,906.99 | 225.00 | 134,865.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 32,735 | SQYD | 2.85 | 93,294.75 | 3.51 | 114,899.85 | 3.50 | 114,572.50 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,388 | CUYD | 0.01 | -13.88 | 0.01 | -13.88 | 0.01 | -13.88 | | 0014 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 416 | SQYD | 200.00 | 83,200.00 | 183.50 | 76,336.00 | 250.00 | 104,000.00 | | 0015 | 701-05-01069 | Side Drain Pipe (24" RCP/RPVCP) | 20 | LNFT | 375.00 | 7,500.00 | 193.19 | 3,863.80 | 265.00 | 5,300.00 | | 0016 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 9,000.00 | 18,000.00 | 6,812.05 | 13,624.10 | 6,350.00 | 12,700.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 12.5 | LNFT | 50.00 | 625.00 | 36.01 | 450.13 | 34.00 | 425.00 | | 0018 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 110.00 | 2,750.00 | 61.27 | 1,531.75 | 58.00 | 1,450.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 160.00 | 8,000.00 | 139.38 | 6,969.00 | 132.00 | 6,600.00 | | 0020 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,950.00 | 5,950.00 | 5,354.52 | 5,354.52 | 5,075.00 | 5,075.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 4,700.00 | 4,700.00 | 3,949.10 | 3,949.10 | 3,750.00 | 3,750.00 | | 0022 | 707-04-00100 | Asphalt Curb | 27 | LNFT | 300.00 | 8,100.00 | 50.00 | 1,350.00 | 325.00 | 8,775.00 | | 0023 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 669 | SQYD | 220.00 | 147,180.00 | 116.01 | 77,610.69 | 185.00 | 123,765.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 669 | SQYD | 7.00 | 4,683.00 | 2.66 | 1,779.54 | 8.00 | 5,352.00 | | 0025 | 712-02-00100 | Sacked Concrete Revetment | 20 | SQYD | 750.00 | 15,000.00 | 507.57 | 10,151.40 | 325.00 | 6,500.00 | | 0026 | 712-04-00100 | Flexible Revetment | 54 | SQYD | 250.00 | 13,500.00 | 115.00 | 6,210.00 | 150.00 | 8,100.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 138,000.00 | 138,000.00 | 135,568.19 | 135,568.19 | 150,000.00 | 150,000.00 | | 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,506 | LNFT | 0.01 | 15.06 | 0.29 | 436.74 | 0.50 | 753.00 | | 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 66 | LNFT | 0.01 | 0.66 | 0.59 | 38.94 | 1.00 | 66.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.302 | MILE | 650.00 | 4,746.30 | 650.00 | 4,746.30 | 825.00 | 6,024.15 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.305 | MILE | 1.00 | 7.31 | 696.90 | 5,090.85 | 660.00 | 4,821.30 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.085 | MILE | 1.00 | 16.09 | 1,045.35 | 16,814.45 | 990.00 | 15,924.15 | | 0033 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 1.00 | 6.00 | 58.08 | 348.48 | 55.00 | 330.00 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.87 | MILE | 1,200.00 | 5,844.00 | 1,161.50 | 5,656.51 | 1,100.00 | 5,357.00 | | 0035 | 726-01-00100 | Bedding Material | 2 | CUYD | 400.00 | 800.00 | 200.00 | 400.00 | 250.00 | 500.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 325,194.75 | 325,194.75 | 250,000.00 | 250,000.00 | | 0037 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 100.00 | 200.00 | 87.11 | 174.22 | 85.00 | 170.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 135.00 | 1,620.00 | 104.54 | 1,254.48 | 100.00 | 1,200.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 395 | EACH | 6.00 | 2,370.00 | 5.81 | 2,294.95 | 6.00 | 2,370.00 | | 0040 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 129 | LNFT | 5.00 | 645.00 | 2.91 | 375.39 | 3.00 | 387.00 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 25.00 | 550.00 | 12.78 | 281.16 | 12.00 | 264.00 | | 0042 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 373 | LNFT | 5.00 | 1,865.00 | 2.91 | 1,085.43 | 3.00 | 1,119.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.362 | MILE | 5,000.00 | 26,810.00 | 5,226.75 | 28,025.83 | 4,950.00 | 26,541.90 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.435 | MILE | 1,500.00 | 3,652.50 | 2,903.75 | 7,070.63 | 2,750.00 | 6,696.25 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 500.00 | 1,000.00 | 464.60 | 929.20 | 440.00 | 880.00 | | 0046 | 735-01-00100 | Mailboxes | 55 | EACH | 10.00 | 550.00 | 25.55 | 1,405.25 | 22.00 | 1,210.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 49 | EACH | 300.00 | 14,700.00 | 261.34 | 12,805.66 | 275.00 | 13,475.00 | | 0048 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 350.00 | 1,050.00 | 348.45 | 1,045.35 | 385.00 | 1,155.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 1.17 | ACRE | 6,000.00 | 7,020.00 | 4,065.25 | 4,756.34 | 3,500.00 | 4,095.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 9,950.00 | 9,950.00 | 10,000.00 | 10,000.00 | | 0051 | 815-03-00300 | Joint Seal (Poured) | 1,477 | LNFT | 40.00 | 59,080.00 | 40.65 | 60,040.05 | 45.00 | 66,465.00 | | 0052 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,197 | LNFT | 5.25 | 6,284.25 | 5.23 | 6,260.31 | 6.00 | 7,182.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 336 | LNFT | 5.25 | 1,764.00 | 5.23 | 1,757.28 | 6.00 | 2,016.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,533 | LNFT | 5.00 | 7,665.00 | 4.65 | 7,128.45 | 6.00 | 9,198.00 | | 0055 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) | 2 | EACH | 36,000.00 | 72,000.00 | 35,832.28 | 71,664.56 | 35,000.00 | 70,000.00 | | 0056 | NS-701-00020 | Culvert Rehabilitation by Geopolymer Lining | 102 | LNFT | 2,300.00 | 234,600.00 | 2,264.93 | 231,022.86 | 2,220.00 | 226,440.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,323,424.84 | | 2,507,552.65 | | 2,721,714.87 |
|