Proposal:H.015929.6
Parish:St. Landry
Routes:LA 343
Description:LA 343: LA 98 - LA 356
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATMENT SUBGRADE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,156,042.75
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $6,974,417.00 |
| 2 | 51821 | Elliott Construction, LLC | $7,357,422.77 |
| 3 | 33663 | Glenn Lege Construction LLC | $7,751,743.76 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Elliott Construction, LLC | - 3 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.01 | LUMP | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 21,315.13 | 21,315.13 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 35,000.00 | 35,000.00 | 25,512.57 | 25,512.57 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 516 | SQYD | 27.00 | 13,932.00 | 30.00 | 15,480.00 | 20.66 | 10,660.56 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 481 | SQYD | 35.00 | 16,835.00 | 78.00 | 37,518.00 | 39.83 | 19,158.23 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,279 | CUYD | 80.00 | 102,320.00 | 45.00 | 57,555.00 | 177.08 | 226,485.32 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 175.00 | 9,800.00 | 150.00 | 8,400.00 | 196.76 | 11,018.56 | | 0007 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 79,881 | SQYD | 16.00 | 1,278,096.00 | 13.50 | 1,078,393.50 | 12.90 | 1,030,464.90 | | 0008 | 304-01-00100 | Lime | 235.9 | TON | 415.00 | 97,898.50 | 400.00 | 94,360.00 | 330.15 | 77,882.39 | | 0009 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 19,970 | SQYD | 6.25 | 124,812.50 | 6.00 | 119,820.00 | 8.12 | 162,156.40 | | 0010 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 79,881 | SQYD | 12.00 | 958,572.00 | 11.00 | 878,691.00 | 11.82 | 944,193.42 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 845 | CUYD | 184.00 | 155,480.00 | 85.00 | 71,825.00 | 76.05 | 64,262.25 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 95.00 | 19,000.00 | 100.00 | 20,000.00 | 91.82 | 18,364.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 20,567.1 | TON | 117.00 | 2,406,350.70 | 140.00 | 2,879,394.00 | 173.23 | 3,562,838.73 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 775.4 | TON | 181.00 | 140,347.40 | 215.00 | 166,711.00 | 203.44 | 157,747.38 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 62,879 | SQYD | 3.05 | 191,780.95 | 3.25 | 204,356.75 | 2.63 | 165,371.77 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,930 | CUYD | 0.01 | -39.30 | 0.01 | -39.30 | 0.01 | -39.30 | | 0017 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 475 | SQYD | 160.00 | 76,000.00 | 220.00 | 104,500.00 | 190.10 | 90,297.50 | | 0018 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 104 | LNFT | 550.00 | 57,200.00 | 430.00 | 44,720.00 | 297.66 | 30,956.64 | | 0019 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 143 | LNFT | 475.00 | 67,925.00 | 475.00 | 67,925.00 | 228.06 | 32,612.58 | | 0020 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 46 | LNFT | 450.00 | 20,700.00 | 480.00 | 22,080.00 | 339.10 | 15,598.60 | | 0021 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 10 | LNFT | 450.00 | 4,500.00 | 510.00 | 5,100.00 | 516.05 | 5,160.50 | | 0022 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 500.00 | 26,000.00 | 330.00 | 17,160.00 | 355.96 | 18,509.92 | | 0023 | 701-14-00100 | Cleaning Existing Pipes | 225 | LNFT | 80.00 | 18,000.00 | 95.00 | 21,375.00 | 61.42 | 13,819.50 | | 0024 | 701-15-00100 | Concrete Collar | 15 | EACH | 2,750.00 | 41,250.00 | 1,775.00 | 26,625.00 | 1,574.04 | 23,610.60 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 372 | SQYD | 225.00 | 83,700.00 | 220.00 | 81,840.00 | 88.94 | 33,085.68 | | 0026 | 712-02-00100 | Sacked Concrete Revetment | 115 | SQYD | 525.00 | 60,375.00 | 400.00 | 46,000.00 | 195.44 | 22,475.60 | | 0027 | 712-04-00100 | Flexible Revetment | 18 | SQYD | 200.00 | 3,600.00 | 330.00 | 5,940.00 | 354.16 | 6,374.88 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 105,000.00 | 105,000.00 | 125,000.00 | 125,000.00 | 205,936.90 | 205,936.90 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.498 | MILE | 1.00 | 15.50 | 800.00 | 12,398.40 | 655.85 | 10,164.36 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.532 | MILE | 1.00 | 14.53 | 550.00 | 7,992.60 | 655.85 | 9,530.81 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.616 | MILE | 1.00 | 35.62 | 880.00 | 31,342.08 | 1,049.36 | 37,374.01 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 12,000.00 | 1,200.00 | 2,750.00 | 275.00 | 19,675.50 | 1,967.55 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 19,806.67 | 19,806.67 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.368 | MILE | 1,200.00 | 12,441.60 | 1,100.00 | 11,404.80 | 1,311.70 | 13,599.71 | | 0035 | 726-01-00100 | Bedding Material (12" Thick) | 49.2 | CUYD | 210.00 | 10,332.00 | 200.00 | 9,840.00 | 178.39 | 8,776.79 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 445,000.00 | 445,000.00 | 600,000.00 | 600,000.00 | 270,866.05 | 270,866.05 | | 0037 | 729-16-00200 | Object Marker Assembly (Type 2) | 23 | EACH | 80.00 | 1,840.00 | 85.00 | 1,955.00 | 196.76 | 4,525.48 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 135.00 | 1,620.00 | 95.00 | 1,140.00 | 111.49 | 1,337.88 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 730 | EACH | 6.00 | 4,380.00 | 5.50 | 4,015.00 | 6.56 | 4,788.80 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.872 | MILE | 5,000.00 | 59,360.00 | 4,620.00 | 54,848.64 | 5,509.14 | 65,404.51 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.844 | MILE | 3,000.00 | 14,532.00 | 2,750.00 | 13,321.00 | 3,279.25 | 15,884.69 | | 0042 | 735-01-00100 | Mailboxes | 134 | EACH | 10.00 | 1,340.00 | 22.00 | 2,948.00 | 26.23 | 3,514.82 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 134 | EACH | 300.00 | 40,200.00 | 275.00 | 36,850.00 | 295.13 | 39,547.42 | | 0044 | 739-01-00100 | Hydro-Seeding | 2.26 | ACRE | 4,500.00 | 10,170.00 | 3,355.00 | 7,582.30 | 3,607.18 | 8,152.23 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 | 49,188.75 | 49,188.75 | | 0046 | 805-16-01200 | Reinforced Concrete Box Culverts (Extension) (6' x 6') | 18 | LNFT | 3,500.00 | 63,000.00 | 6,710.00 | 120,780.00 | 4,210.56 | 75,790.08 | | 0047 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Quantity of Steel = 1,854 lbs
Quantity of Concrete = 24.57 cuyds | 2 | EACH | 80,000.00 | 160,000.00 | 75,000.00 | 150,000.00 | 57,845.97 | 115,691.94 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,974,417.00 | | 7,357,422.77 | | 7,751,743.76 |
|