Proposal:H.015873.6
Parish:Franklin
Routes:LA 562
Description:LA 562: US 425 - JCT RIVER RD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN PLACE CEMENT TREATED BASE COURSE, PAVEMENT WIDENING, ASPHALT SURFACE TREATMENT, GEOGRID, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,533,904.27
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,500,362.30 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,949,371.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of SPECIALTY MAILBOX | 4 | EACH | 3,000.00 | 12,000.00 | 900.00 | 3,600.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 338.5 | LNFT | 16.00 | 5,416.00 | 25.00 | 8,462.50 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP, 24" RCP, 54" EQUIV. CMPA | 164 | LNFT | 16.00 | 2,624.00 | 60.00 | 9,840.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 910 | CUYD | 45.00 | 40,950.00 | 50.00 | 45,500.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 1,244 | LNFT | 2.00 | 2,488.00 | 6.00 | 7,464.00 | | 0006 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 24,542 | SQYD | 15.00 | 368,130.00 | 16.00 | 392,672.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,642 | CUYD | 240.00 | 394,080.00 | 95.00 | 155,990.00 | | 0008 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 223 | CUYD | 55.00 | 12,265.00 | 185.00 | 41,255.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 7,222.2 | TON | 155.00 | 1,119,441.00 | 225.00 | 1,624,995.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 663.6 | TON | 250.00 | 165,900.00 | 225.00 | 149,310.00 | | 0011 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 13,222 | GAL | 4.50 | 59,499.00 | 5.00 | 66,110.00 | | 0012 | 507-02-00300 | Aggregate (S3) | 42,653 | SQYD | 2.50 | 106,632.50 | 3.00 | 127,959.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 25,903 | SQYD | 2.50 | 64,757.50 | 5.00 | 129,515.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,551 | CUYD | 1.00 | -1,551.00 | 1.00 | -1,551.00 | | 0015 | 510-01-00001 | Pavement Patching 19" MINIMUM THICKNESS | 1,183 | SQYD | 260.00 | 307,580.00 | 240.00 | 283,920.00 | | 0016 | 510-02-00100 | Pavement Widening 12" MINIMUM THICKNESS | 1,929.2 | SQYD | 130.00 | 250,796.00 | 180.00 | 347,256.00 | | 0017 | 701-01-01100 | Cross Drain Pipe (54" RCP) | 72 | LNFT | 475.00 | 34,200.00 | 700.00 | 50,400.00 | | 0018 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 88 | LNFT | 310.00 | 27,280.00 | 400.00 | 35,200.00 | | 0019 | 701-08-00100 | Relaying Pipe 36" RCP | 4 | LNFT | 265.00 | 1,060.00 | 400.00 | 1,600.00 | | 0020 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 300.00 | 2,400.00 | 400.00 | 3,200.00 | | 0021 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,300.00 | 4,600.00 | 1,600.00 | 3,200.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 72 | LNFT | 10.00 | 720.00 | 5.00 | 360.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 35.00 | 2,187.50 | 40.00 | 2,500.00 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.00 | 13,500.00 | 140.00 | 14,000.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,800.00 | 15,200.00 | 5,000.00 | 20,000.00 | | 0026 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 125.00 | 6,750.00 | 50.00 | 2,700.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 558 | SQYD | 175.00 | 97,650.00 | 150.00 | 83,700.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 25,100 | SQYD | 1.50 | 37,650.00 | 3.00 | 75,300.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.487 | MILE | 154.00 | 1,461.00 | 300.00 | 2,846.10 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.024 | MILE | 500.00 | 1,512.00 | 800.00 | 2,419.20 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.524 | MILE | 900.00 | 30,171.60 | 1,100.00 | 36,876.40 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 931 | EACH | 2.00 | 1,862.00 | 3.00 | 2,793.00 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 1.6 | TON | 1,500.00 | 2,400.00 | 1,000.00 | 1,600.00 | | 0035 | 717-01-00100 | Seeding | 47 | LB | 25.00 | 1,175.00 | 20.00 | 940.00 | | 0036 | 718-01-00100 | Fertilizer | 790 | LB | 1.00 | 790.00 | 1.00 | 790.00 | | 0037 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0038 | 726-01-00100 | Bedding Material | 88 | CUYD | 180.00 | 15,840.00 | 165.00 | 14,520.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 421,000.00 | 421,000.00 | 350,000.00 | 350,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 15 | EACH | 110.00 | 1,650.00 | 135.00 | 2,025.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 130.00 | 520.00 | 150.00 | 600.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,624 | EACH | 5.00 | 8,120.00 | 8.00 | 12,992.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.848 | MILE | 4,100.00 | 105,976.80 | 6,500.00 | 168,012.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.732 | MILE | 2,200.00 | 6,010.40 | 2,000.00 | 5,464.00 | | 0045 | 735-01-00100 | Mailboxes | 32 | EACH | 25.00 | 800.00 | 40.00 | 1,280.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 250.00 | 7,000.00 | 300.00 | 8,400.00 | | 0047 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 350.00 | 700.00 | 400.00 | 800.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0049 | NS-300-00060 | Geogrid | 24,542 | SQYD | 24.00 | 589,008.00 | 18.00 | 441,756.00 | | 0050 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 160 | INLF | 1.00 | 160.00 | 5.00 | 800.00 | | 0051 | NS-719-00002 | Tree Trimming Approx. 10.038 Acres | 1 | LUMP | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,500,362.30 | | 4,949,371.20 |
|