Proposal:H.015353.6
Parish:Calcasieu
Routes:I-210
Description:I-210: EB RYAN ST. EXIT MODIFICATIONS
Type Construction:ASPHALT CONCRETE OVERLAY, INCIDENTAL CONCRETE PAVING, FOG SEAL, AND RELATED WORK.
Estimated Construction Cost:$366,187.39
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $481,622.72 |
| 2 | 30774 | Progressive Construction Co., LLC | $527,802.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 380 | SQYD | 21.50 | 8,170.00 | 75.00 | 28,500.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 169.2 | SQYD | 80.50 | 13,620.60 | 50.00 | 8,460.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 618 | LNFT | 14.50 | 8,961.00 | 35.00 | 21,630.00 | | 0004 | 202-02-26300 | Removal of Median / Island | 60 | SQYD | 34.00 | 2,040.00 | 65.00 | 3,900.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 44.7 | TON | 431.00 | 19,265.70 | 1,000.00 | 44,700.00 | | 0006 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 60 | SQYD | 135.00 | 8,100.00 | 193.00 | 11,580.00 | | 0007 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (RED BRICK COLOR)(9" THICK) | 19.6 | SQYD | 310.00 | 6,076.00 | 210.00 | 4,116.00 | | 0008 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (RED BRICK COLOR)(9.5" THICK) | 186 | SQYD | 165.00 | 30,690.00 | 210.00 | 39,060.00 | | 0009 | 706-04-00110 | Curb Ramps TYPE 3 | 16.2 | SQYD | 455.00 | 7,371.00 | 450.00 | 7,290.00 | | 0010 | 706-04-00110 | Curb Ramps TYPE 4 | 71.6 | SQYD | 250.00 | 17,900.00 | 450.00 | 32,220.00 | | 0011 | 706-04-00110 | Curb Ramps TYPE 6 | 54.8 | SQYD | 290.00 | 15,892.00 | 450.00 | 24,660.00 | | 0012 | 706-04-00110 | Curb Ramps TYPE 7 | 26.6 | SQYD | 420.00 | 11,172.00 | 450.00 | 11,970.00 | | 0013 | 707-01-00100 | Concrete Curb | 948 | LNFT | 72.00 | 68,256.00 | 40.00 | 37,920.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 | | 0015 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,896 | LNFT | 0.62 | 1,175.52 | 0.65 | 1,232.40 | | 0016 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 454 | LNFT | 0.62 | 281.48 | 0.65 | 295.10 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.775 | MILE | 310.00 | 240.25 | 9,900.00 | 7,672.50 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.775 | MILE | 310.00 | 240.25 | 312.00 | 241.80 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.148 | MILE | 615.00 | 1,321.02 | 625.00 | 1,342.50 | | 0020 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 8 | EACH | 62.00 | 496.00 | 63.00 | 504.00 | | 0021 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 18 | EACH | 62.00 | 1,116.00 | 63.00 | 1,134.00 | | 0022 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 62.00 | 496.00 | 63.00 | 504.00 | | 0023 | 713-11-00100 | Portable Changeable Message Signs | 3 | EACH | 5,200.00 | 15,600.00 | 5,500.00 | 16,500.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 50,000.00 | 50,000.00 | | 0025 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 25.5 | SQFT | 37.00 | 943.50 | 124.00 | 3,162.00 | | 0026 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 8.188 | SQFT | 50.00 | 409.40 | 124.00 | 1,015.31 | | 0027 | 729-21-00100 | U-Channel Post | 4 | EACH | 338.00 | 1,352.00 | 70.00 | 280.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 762 | EACH | 8.00 | 6,096.00 | 8.00 | 6,096.00 | | 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,776 | LNFT | 3.70 | 6,571.20 | 3.75 | 6,660.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 454 | LNFT | 13.50 | 6,129.00 | 13.75 | 6,242.50 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.148 | MILE | 7,150.00 | 15,358.20 | 7,250.00 | 15,573.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.775 | MILE | 3,150.00 | 2,441.25 | 3,200.00 | 2,480.00 | | 0033 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.207 | MILE | 14,775.00 | 3,058.43 | 15,000.00 | 3,105.00 | | 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 8 | EACH | 370.00 | 2,960.00 | 375.00 | 3,000.00 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 370.00 | 6,660.00 | 375.00 | 6,750.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 370.00 | 2,960.00 | 375.00 | 3,000.00 | | 0037 | 732-05-00100 | Removal of Existing Markings | 0.54 | MILE | 10,500.00 | 5,670.00 | 10,625.00 | 5,737.50 | | 0038 | 737-06-00002 | Painted Islands RED BRICK COLOR | 816.62 | SQYD | 30.75 | 25,111.07 | 25.00 | 20,415.50 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,650.00 | 2,650.00 | 12,000.00 | 12,000.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,801 | INLF | 1.85 | 3,331.85 | 3.50 | 6,303.50 | | 0041 | NS-DEV-50701 | Fog Seal | 711 | GAL | 40.00 | 28,440.00 | 50.00 | 35,550.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 481,622.72 | | 527,802.61 |
|