Proposal:H.015273.6
Parish:Iberia
Routes:US 90
Description:US 90: LA 88 - LA 14
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH, AND RELATED WORK.
Estimated Construction Cost:$17,814,000.00
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $17,999,665.37 |
| 2 | 34356 | Prairie Contractors LLC | $18,049,483.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 3,323.1 | SQYD | 5.41 | 17,977.97 | 42.00 | 139,570.20 | | 0002 | 202-02-04560 | Removal of Bridge Joint Poured | 756 | LNFT | 11.62 | 8,784.72 | 12.00 | 9,072.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Preformed Neoprene | 1,368 | LNFT | 29.04 | 39,726.72 | 30.00 | 41,040.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 4,158.1 | LNFT | 7.55 | 31,393.66 | 15.00 | 62,371.50 | | 0005 | 203-01-00100 | General Excavation | 992 | CUYD | 39.48 | 39,164.16 | 80.00 | 79,360.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 10,268 | CUYD | 50.25 | 515,967.00 | 45.00 | 462,060.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 107 | EACH | 174.23 | 18,642.61 | 150.00 | 16,050.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 87,084 | LNFT | 2.03 | 176,780.52 | 1.85 | 161,105.40 | | 0009 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,798.2 | SQYD | 69.94 | 125,766.11 | 125.00 | 224,775.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 162 | EACH | 606.61 | 98,270.82 | 2,300.00 | 372,600.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 200 | CUYD | 140.82 | 28,164.00 | 250.00 | 50,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 70,063.8 | TON | 132.10 | 9,255,427.98 | 122.00 | 8,547,783.60 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 566.4 | TON | 173.74 | 98,406.34 | 300.00 | 169,920.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 11,627 | SQYD | 8.61 | 100,108.47 | 30.00 | 348,810.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -237 | CUYD | 0.01 | -2.37 | 0.01 | -2.37 | | 0016 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 1,798 | SQYD | 154.06 | 276,999.88 | 260.00 | 467,480.00 | | 0017 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 11,627 | SQYD | 167.08 | 1,942,639.16 | 161.00 | 1,871,947.00 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 61,275 | LNFT | 3.12 | 191,178.00 | 3.25 | 199,143.75 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 175,009 | LNFT | 3.25 | 568,779.25 | 0.50 | 87,504.50 | | 0020 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching 10" THICK | 1,800 | SQYD | 342.64 | 616,752.00 | 350.00 | 630,000.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 800 | LNFT | 77.47 | 61,976.00 | 105.00 | 84,000.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,281.3 | LNFT | 40.05 | 91,366.07 | 42.00 | 95,814.60 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 350 | LNFT | 152.31 | 53,308.50 | 160.00 | 56,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 14 | EACH | 4,070.30 | 56,984.20 | 4,500.00 | 63,000.00 | | 0025 | 707-01-00100 | Concrete Curb | 54 | LNFT | 124.74 | 6,735.96 | 200.00 | 10,800.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 580,750.00 | 580,750.00 | 300,000.00 | 300,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24.441 | MILE | 919.10 | 22,463.72 | 650.00 | 15,886.65 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 24.447 | MILE | 813.05 | 19,876.63 | 1.00 | 24.45 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 73.335 | MILE | 1,161.50 | 85,178.60 | 1.00 | 73.34 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 16.391 | MILE | 1,161.50 | 19,038.15 | 1,200.00 | 19,669.20 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 450,359.00 | 450,359.00 | 1,495,000.00 | 1,495,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 293 | EACH | 81.31 | 23,823.83 | 90.00 | 26,370.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 26 | EACH | 104.54 | 2,718.04 | 135.00 | 3,510.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 6,216 | EACH | 5.81 | 36,114.96 | 5.00 | 31,080.00 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,418 | LNFT | 16.26 | 39,316.68 | 16.00 | 38,688.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 39.796 | MILE | 4,820.23 | 191,825.87 | 5,000.00 | 198,980.00 | | 0037 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.654 | MILE | 15,099.50 | 24,974.57 | 14,000.00 | 23,156.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 13.156 | MILE | 2,439.15 | 32,089.46 | 1,500.00 | 19,734.00 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.675 | MILE | 13,357.25 | 9,016.14 | 10,000.00 | 6,750.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 13.204 | MILE | 4,065.25 | 53,677.56 | 500.00 | 6,602.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 13.98 | ACRE | 3,194.13 | 44,653.94 | 3,750.00 | 52,425.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 313,807.00 | 313,807.00 | 20,000.00 | 20,000.00 | | 0043 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,368 | LNFT | 202.94 | 277,621.92 | 225.00 | 307,800.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 756 | LNFT | 33.59 | 25,394.04 | 42.00 | 31,752.00 | | 0045 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 132,915 | SQYD | 8.99 | 1,194,905.85 | 8.50 | 1,129,777.50 | | 0046 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 2 | EACH | 65,380.84 | 130,761.68 | 36,000.00 | 72,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,999,665.37 | | 18,049,483.32 |
|