Proposal:H.015120.6
Parish:Jefferson
Description:ROOSEVELT BLVD: W NAPOLEON - W METAIRIE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT (WWF REINFORCED, HIGH EARLY), AND RELATED WORK.
Estimated Construction Cost:$8,354,083.00
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $6,325,244.15 |
| 2 | 06276 | Barriere Construction Co., LLC | $6,440,788.58 |
| 3 | 24901 | Hard Rock Construction LLC | $6,529,995.35 |
| 4 | 12198 | Byron E. Talbot Contractor, Inc. | $6,675,816.30 |
| 5 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $6,871,746.00 |
| 6 | 46747 | Triumph Construction, LLC | $7,268,734.14 |
| 7 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $7,361,788.98 |
| 8 | 34263 | LA Contracting Enterprise, L.L.C. | $7,530,000.00 |
| 9 | 36961 | Cycle Construction Co. L.L.C. | $7,537,246.10 |
| 10 | 02179 | Boh Bros. Construction Co., LLC. | $7,588,585.00 |
| 11 | 12702 | J. CALDARERA & COMPANY, INC. | $9,795,946.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - Barriere Construction Co., LLC | - 3 - Hard Rock Construction LLC | - 4 - Byron E. Talbot Contractor, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.85 | LUMP | 250,000.00 | 250,000.00 | 50,000.00 | 50,000.00 | 71,000.00 | 71,000.00 | 110,000.00 | 110,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 17,382.5 | SQYD | 25.00 | 434,562.50 | 10.00 | 173,825.00 | 26.00 | 451,945.00 | 17.00 | 295,502.50 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 11 | EACH | 500.00 | 5,500.00 | 850.00 | 9,350.00 | 800.00 | 8,800.00 | 1,000.00 | 11,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,613 | SQYD | 25.00 | 65,325.00 | 22.00 | 57,486.00 | 20.00 | 52,260.00 | 27.50 | 71,857.50 | | 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) (12" RCP) | 376 | LNFT | 25.00 | 9,400.00 | 1.00 | 376.00 | 35.00 | 13,160.00 | 25.00 | 9,400.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15" RCP) | 111 | LNFT | 25.00 | 2,775.00 | 1.00 | 111.00 | 52.00 | 5,772.00 | 25.50 | 2,830.50 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) (18" RCP) | 230 | LNFT | 25.00 | 5,750.00 | 1.00 | 230.00 | 54.00 | 12,420.00 | 26.00 | 5,980.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (24" RCP) | 173 | LNFT | 25.00 | 4,325.00 | 1.00 | 173.00 | 52.00 | 8,996.00 | 32.00 | 5,536.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (27" RCP) | 102 | LNFT | 50.00 | 5,100.00 | 1.00 | 102.00 | 59.00 | 6,018.00 | 32.50 | 3,315.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) (30" RCP) | 240 | LNFT | 50.00 | 12,000.00 | 1.00 | 240.00 | 70.00 | 16,800.00 | 37.00 | 8,880.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 225,000.00 | 225,000.00 | 240,000.00 | 240,000.00 | 62,000.00 | 62,000.00 | 130,000.00 | 130,000.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 2,443 | SQYD | 5.00 | 12,215.00 | 2.00 | 4,886.00 | 2.00 | 4,886.00 | 3.00 | 7,329.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 296 | EACH | 1.00 | 296.00 | 35.00 | 10,360.00 | 25.00 | 7,400.00 | 60.00 | 17,760.00 | | 0015 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 18,600.2 | SQYD | 45.00 | 837,009.00 | 53.00 | 985,810.60 | 50.00 | 930,010.00 | 53.50 | 995,110.70 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 754.5 | CUYD | 1.00 | 754.50 | 1.00 | 754.50 | 10.00 | 7,545.00 | 142.00 | 107,139.00 | | 0017 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) ( 6" AVG. THICK) | 864 | SQYD | 1.00 | 864.00 | 25.00 | 21,600.00 | 105.00 | 90,720.00 | 85.00 | 73,440.00 | | 0018 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) (6" Thick) | 542 | SQYD | 1.00 | 542.00 | 25.00 | 13,550.00 | 132.00 | 71,544.00 | 75.00 | 40,650.00 | | 0019 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 218 | LNFT | 150.00 | 32,700.00 | 150.00 | 32,700.00 | 270.00 | 58,860.00 | 140.00 | 30,520.00 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 892 | LNFT | 250.00 | 223,000.00 | 155.00 | 138,260.00 | 306.00 | 272,952.00 | 195.00 | 173,940.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 445 | LNFT | 350.00 | 155,750.00 | 160.00 | 71,200.00 | 380.00 | 169,100.00 | 225.00 | 100,125.00 | | 0022 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 639 | LNFT | 450.00 | 287,550.00 | 165.00 | 105,435.00 | 325.00 | 207,675.00 | 230.00 | 146,970.00 | | 0023 | 701-15-00100 | Concrete Collar | 72 | EACH | 2,000.00 | 144,000.00 | 1,500.00 | 108,000.00 | 1,400.00 | 100,800.00 | 1,300.00 | 93,600.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,194 | LNFT | 1.00 | 2,194.00 | 1.00 | 2,194.00 | 5.00 | 10,970.00 | 15.00 | 32,910.00 | | 0025 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 10,000.00 | 90,000.00 | 12,000.00 | 108,000.00 | 9,100.00 | 81,900.00 | 6,000.00 | 54,000.00 | | 0026 | 702-03-00700 | Catch Basins (CB-08) | 15 | EACH | 15,000.00 | 225,000.00 | 15,500.00 | 232,500.00 | 17,000.00 | 255,000.00 | 12,000.00 | 180,000.00 | | 0027 | 702-04-00100 | Adjusting Manholes | 14 | EACH | 2,000.00 | 28,000.00 | 2,500.00 | 35,000.00 | 1,500.00 | 21,000.00 | 1,800.00 | 25,200.00 | | 0028 | 702-04-00200 | Adjusting Catch Basins | 16 | EACH | 2,250.00 | 36,000.00 | 2,500.00 | 40,000.00 | 2,200.00 | 35,200.00 | 2,000.00 | 32,000.00 | | 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 77 | SQYD | 75.00 | 5,775.00 | 100.00 | 7,700.00 | 120.00 | 9,240.00 | 86.00 | 6,622.00 | | 0030 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 20.3 | SQYD | 125.00 | 2,537.50 | 150.00 | 3,045.00 | 120.00 | 2,436.00 | 115.00 | 2,334.50 | | 0031 | 706-04-00110 | Curb Ramps (Type 3) | 242.9 | SQYD | 300.00 | 72,870.00 | 250.00 | 60,725.00 | 250.00 | 60,725.00 | 375.00 | 91,087.50 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | 130,000.00 | 130,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 142 | LNFT | 0.50 | 71.00 | 1.00 | 142.00 | 0.25 | 35.50 | 0.40 | 56.80 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 610 | LNFT | 3.00 | 1,830.00 | 1.00 | 610.00 | 0.50 | 305.00 | 1.10 | 671.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.071 | MILE | 1,000.00 | 71.00 | 325.00 | 23.08 | 100.00 | 7.10 | 10,000.00 | 710.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.112 | MILE | 2,000.00 | 2,224.00 | 725.00 | 806.20 | 100.00 | 111.20 | 1,350.00 | 1,501.20 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 6,867 | SQYD | 10.00 | 68,670.00 | 10.00 | 68,670.00 | 15.00 | 103,005.00 | 10.00 | 68,670.00 | | 0038 | 721-01-00100 | Mowing | 20 | CYCL | 250.00 | 5,000.00 | 500.00 | 10,000.00 | 800.00 | 16,000.00 | 850.00 | 17,000.00 | | 0039 | 726-01-00100 | Bedding Material | 981.4 | CUYD | 50.00 | 49,070.00 | 130.00 | 127,582.00 | 110.00 | 107,954.00 | 130.00 | 127,582.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 620,000.00 | 620,000.00 | 320,000.00 | 320,000.00 | 205,000.00 | 205,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 68.8 | SQFT | 25.00 | 1,720.00 | 22.00 | 1,513.60 | 38.00 | 2,614.40 | 40.00 | 2,752.00 | | 0042 | 729-02-00100 | Sign (Type B) | 94.8 | SQFT | 25.00 | 2,370.00 | 22.00 | 2,085.60 | 49.00 | 4,645.20 | 55.00 | 5,214.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 150.00 | 450.00 | 135.00 | 405.00 | 137.00 | 411.00 | 140.00 | 420.00 | | 0044 | 729-21-00100 | U-Channel Post | 31 | EACH | 150.00 | 4,650.00 | 165.00 | 5,115.00 | 300.00 | 9,300.00 | 300.00 | 9,300.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 35 | EACH | 20.00 | 700.00 | 5.00 | 175.00 | 4.50 | 157.50 | 16.50 | 577.50 | | 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,731 | LNFT | 2.00 | 23,462.00 | 2.00 | 23,462.00 | 2.00 | 23,462.00 | 2.20 | 25,808.20 | | 0047 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 142 | LNFT | 3.00 | 426.00 | 5.00 | 710.00 | 4.50 | 639.00 | 4.50 | 639.00 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,065 | LNFT | 15.00 | 15,975.00 | 17.00 | 18,105.00 | 16.50 | 17,572.50 | 14.00 | 14,910.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 2,250.00 | 159.75 | 2,000.00 | 142.00 | 2,000.00 | 142.00 | 2,200.00 | 156.20 | | 0050 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 6,000.00 | 162.00 | 6,500.00 | 175.50 | 6,600.00 | 178.20 | 5,500.00 | 148.50 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 750.00 | 1,500.00 | 300.00 | 600.00 | 300.00 | 600.00 | 330.00 | 660.00 | | 0052 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 750.00 | 1,500.00 | 325.00 | 650.00 | 328.00 | 656.00 | 350.00 | 700.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0054 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | 65,000.00 | 65,000.00 | 250,000.00 | 250,000.00 | | 0055 | 804-18-00100 | Vibration Monitoring | 150 | DAY | 500.00 | 75,000.00 | 500.00 | 75,000.00 | 500.00 | 75,000.00 | 600.00 | 90,000.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 981 | INLF | 0.01 | 9.81 | 1.00 | 981.00 | 1.00 | 981.00 | 1.15 | 1,128.15 | | 0057 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,168 | INLF | 0.01 | 11.68 | 1.00 | 1,168.00 | 1.00 | 1,168.00 | 1.45 | 1,693.60 | | 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,491 | INLF | 0.01 | 124.91 | 1.00 | 12,491.00 | 0.25 | 3,122.75 | 1.45 | 18,111.95 | | 0059 | NS-719-00002 | Tree Trimming | 1 | LUMP | 25,000.00 | 25,000.00 | 4,500.00 | 4,500.00 | 7,000.00 | 7,000.00 | 6,500.00 | 6,500.00 | | 0060 | NS-719-00003 | Root Pruning | 1 | LUMP | 1,000.00 | 1,000.00 | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0061 | NS-MSC-00008 | Construction Photographs And Video | 1 | LUMP | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0062 | TS-601-00100 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) | 16,280 | SQYD | 80.00 | 1,302,400.00 | 115.00 | 1,872,200.00 | 100.00 | 1,628,000.00 | 115.00 | 1,872,200.00 | | 0063 | TS-601-00500 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) (CROSSOVERS & TURNOUTS) | 670.4 | SQYD | 100.00 | 67,040.00 | 150.00 | 100,560.00 | 105.00 | 70,392.00 | 140.00 | 93,856.00 | | 0064 | TS-706-70100 | Concrete Walk (4-IN) (MESH REINFORCED, HIGH-EARLY) | 581.9 | SQYD | 125.00 | 72,737.50 | 90.00 | 52,371.00 | 155.00 | 90,194.50 | 130.00 | 75,647.00 | | 0065 | TS-706-70200 | Concrete Drive (6-IN) (WWF REINFORCED, HIGH-EARLY) | 1,827.6 | SQYD | 125.00 | 228,450.00 | 100.00 | 182,760.00 | 130.00 | 237,588.00 | 150.00 | 274,140.00 | | 0066 | TS-707-00100 | Concrete Curb (HIGH-EARLY) | 11,416.5 | LNFT | 10.00 | 114,165.00 | 25.00 | 285,412.50 | 23.00 | 262,579.50 | 16.00 | 182,664.00 | | 0067 | TS-741-10019 | Service Connections (WATER) (<1") (DIRECTIONAL DRILL) | 51 | EACH | 100.00 | 5,100.00 | 2,500.00 | 127,500.00 | 1,700.00 | 86,700.00 | 3,500.00 | 178,500.00 | | 0068 | TS-742-01031 | Pipe Cleaning and Video Inspection | 2,580 | LF | 30.00 | 77,400.00 | 22.00 | 56,760.00 | 23.00 | 59,340.00 | 17.00 | 43,860.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,325,244.15 | | 6,440,788.58 | | 6,529,995.35 | | 6,675,816.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - KORT's CONSTRUCTION SERVICES, INC. | - 6 - Triumph Construction, LLC | - 7 - BEVERLY CONSTRUCTION CO. LLC | - 8 - LA Contracting Enterprise, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.85 | LUMP | 115,000.00 | 115,000.00 | 207,300.00 | 207,300.00 | 146,000.00 | 146,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 55,510.00 | 55,510.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 17,382.5 | SQYD | 24.00 | 417,180.00 | 12.00 | 208,590.00 | 20.00 | 347,650.00 | 22.00 | 382,415.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 11 | EACH | 950.00 | 10,450.00 | 948.00 | 10,428.00 | 1,300.00 | 14,300.00 | 1,300.00 | 14,300.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,613 | SQYD | 15.00 | 39,195.00 | 31.00 | 81,003.00 | 19.00 | 49,647.00 | 30.00 | 78,390.00 | | 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) (12" RCP) | 376 | LNFT | 15.00 | 5,640.00 | 26.00 | 9,776.00 | 35.00 | 13,160.00 | 35.00 | 13,160.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15" RCP) | 111 | LNFT | 15.00 | 1,665.00 | 55.00 | 6,105.00 | 35.00 | 3,885.00 | 35.00 | 3,885.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) (18" RCP) | 230 | LNFT | 15.00 | 3,450.00 | 35.00 | 8,050.00 | 35.00 | 8,050.00 | 35.00 | 8,050.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (24" RCP) | 173 | LNFT | 15.00 | 2,595.00 | 46.00 | 7,958.00 | 35.00 | 6,055.00 | 35.00 | 6,055.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (27" RCP) | 102 | LNFT | 15.00 | 1,530.00 | 60.00 | 6,120.00 | 35.00 | 3,570.00 | 35.00 | 3,570.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) (30" RCP) | 240 | LNFT | 15.00 | 3,600.00 | 33.00 | 7,920.00 | 35.00 | 8,400.00 | 35.00 | 8,400.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 170,000.00 | 170,000.00 | 141,560.00 | 141,560.00 | 230,000.00 | 230,000.00 | 350,000.00 | 350,000.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 2,443 | SQYD | 2.00 | 4,886.00 | 1.00 | 2,443.00 | 1.50 | 3,664.50 | 2.00 | 4,886.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 296 | EACH | 45.00 | 13,320.00 | 37.00 | 10,952.00 | 32.00 | 9,472.00 | 28.00 | 8,288.00 | | 0015 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 18,600.2 | SQYD | 50.00 | 930,010.00 | 38.00 | 706,807.60 | 57.00 | 1,060,211.40 | 58.00 | 1,078,811.60 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 754.5 | CUYD | 90.00 | 67,905.00 | 114.00 | 86,013.00 | 85.00 | 64,132.50 | 121.00 | 91,294.50 | | 0017 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) ( 6" AVG. THICK) | 864 | SQYD | 65.00 | 56,160.00 | 16.00 | 13,824.00 | 80.00 | 69,120.00 | 104.00 | 89,856.00 | | 0018 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) (6" Thick) | 542 | SQYD | 65.00 | 35,230.00 | 16.00 | 8,672.00 | 80.00 | 43,360.00 | 104.00 | 56,368.00 | | 0019 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 218 | LNFT | 135.00 | 29,430.00 | 64.00 | 13,952.00 | 270.00 | 58,860.00 | 167.00 | 36,406.00 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 892 | LNFT | 140.00 | 124,880.00 | 69.00 | 61,548.00 | 280.00 | 249,760.00 | 371.00 | 330,932.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 445 | LNFT | 170.00 | 75,650.00 | 95.00 | 42,275.00 | 290.00 | 129,050.00 | 415.00 | 184,675.00 | | 0022 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 639 | LNFT | 215.00 | 137,385.00 | 125.00 | 79,875.00 | 295.00 | 188,505.00 | 420.00 | 268,380.00 | | 0023 | 701-15-00100 | Concrete Collar | 72 | EACH | 1,750.00 | 126,000.00 | 398.00 | 28,656.00 | 2,400.00 | 172,800.00 | 2,000.00 | 144,000.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,194 | LNFT | 5.00 | 10,970.00 | 13.00 | 28,522.00 | 7.00 | 15,358.00 | 5.00 | 10,970.00 | | 0025 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 5,800.00 | 52,200.00 | 5,977.00 | 53,793.00 | 6,600.00 | 59,400.00 | 7,100.00 | 63,900.00 | | 0026 | 702-03-00700 | Catch Basins (CB-08) | 15 | EACH | 17,500.00 | 262,500.00 | 10,454.00 | 156,810.00 | 11,400.00 | 171,000.00 | 16,000.00 | 240,000.00 | | 0027 | 702-04-00100 | Adjusting Manholes | 14 | EACH | 1,700.00 | 23,800.00 | 1,769.00 | 24,766.00 | 900.00 | 12,600.00 | 1,500.00 | 21,000.00 | | 0028 | 702-04-00200 | Adjusting Catch Basins | 16 | EACH | 2,300.00 | 36,800.00 | 1,793.00 | 28,688.00 | 900.00 | 14,400.00 | 2,800.00 | 44,800.00 | | 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 77 | SQYD | 93.00 | 7,161.00 | 197.00 | 15,169.00 | 90.00 | 6,930.00 | 109.00 | 8,393.00 | | 0030 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 20.3 | SQYD | 120.00 | 2,436.00 | 606.00 | 12,301.80 | 100.00 | 2,030.00 | 124.00 | 2,517.20 | | 0031 | 706-04-00110 | Curb Ramps (Type 3) | 242.9 | SQYD | 400.00 | 97,160.00 | 90.00 | 21,861.00 | 275.00 | 66,797.50 | 405.00 | 98,374.50 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 110,900.00 | 110,900.00 | 117,000.00 | 117,000.00 | 72,000.00 | 72,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 142 | LNFT | 1.00 | 142.00 | 5.00 | 710.00 | 0.35 | 49.70 | 0.35 | 49.70 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 610 | LNFT | 1.50 | 915.00 | 1.00 | 610.00 | 1.05 | 640.50 | 1.00 | 610.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.071 | MILE | 2,500.00 | 177.50 | 422.00 | 29.96 | 925.00 | 65.68 | 9,700.00 | 688.70 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.112 | MILE | 1,500.00 | 1,668.00 | 836.00 | 929.63 | 1,250.00 | 1,390.00 | 1,500.00 | 1,668.00 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 6,867 | SQYD | 13.00 | 89,271.00 | 8.00 | 54,936.00 | 10.00 | 68,670.00 | 8.50 | 58,369.50 | | 0038 | 721-01-00100 | Mowing | 20 | CYCL | 2,800.00 | 56,000.00 | 1,421.00 | 28,420.00 | 1,500.00 | 30,000.00 | 1,200.00 | 24,000.00 | | 0039 | 726-01-00100 | Bedding Material | 981.4 | CUYD | 155.00 | 152,117.00 | 183.00 | 179,596.20 | 100.00 | 98,140.00 | 146.00 | 143,284.40 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 952,650.00 | 952,650.00 | 557,000.00 | 557,000.00 | 321,626.40 | 321,626.40 | | 0041 | 729-01-00100 | Sign (Type A) | 68.8 | SQFT | 25.00 | 1,720.00 | 19.00 | 1,307.20 | 21.00 | 1,444.80 | 24.00 | 1,651.20 | | 0042 | 729-02-00100 | Sign (Type B) | 94.8 | SQFT | 25.00 | 2,370.00 | 14.00 | 1,327.20 | 21.00 | 1,990.80 | 24.00 | 2,275.20 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 160.00 | 480.00 | 243.00 | 729.00 | 130.00 | 390.00 | 150.00 | 450.00 | | 0044 | 729-21-00100 | U-Channel Post | 31 | EACH | 180.00 | 5,580.00 | 189.00 | 5,859.00 | 150.00 | 4,650.00 | 174.00 | 5,394.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 35 | EACH | 20.00 | 700.00 | 23.00 | 805.00 | 15.50 | 542.50 | 18.00 | 630.00 | | 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,731 | LNFT | 2.50 | 29,327.50 | 1.00 | 11,731.00 | 2.00 | 23,462.00 | 2.50 | 29,327.50 | | 0047 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 142 | LNFT | 4.00 | 568.00 | 9.00 | 1,278.00 | 3.15 | 447.30 | 3.50 | 497.00 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,065 | LNFT | 15.00 | 15,975.00 | 18.00 | 19,170.00 | 12.50 | 13,312.50 | 13.00 | 13,845.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 2,500.00 | 177.50 | 2,253.00 | 159.96 | 2,100.00 | 149.10 | 2,100.00 | 149.10 | | 0050 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 4,500.00 | 121.50 | 7,407.00 | 199.99 | 5,200.00 | 140.40 | 5,200.00 | 140.40 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 375.00 | 750.00 | 655.00 | 1,310.00 | 310.00 | 620.00 | 310.00 | 620.00 | | 0052 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 375.00 | 750.00 | 685.00 | 1,370.00 | 310.00 | 620.00 | 310.00 | 620.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 2,370.00 | 2,370.00 | 75,000.00 | 75,000.00 | 54,000.00 | 54,000.00 | | 0054 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 65,000.00 | 65,000.00 | 2,370.00 | 2,370.00 | 225,000.00 | 225,000.00 | 23,000.00 | 23,000.00 | | 0055 | 804-18-00100 | Vibration Monitoring | 150 | DAY | 545.00 | 81,750.00 | 1,698.00 | 254,700.00 | 800.00 | 120,000.00 | 450.00 | 67,500.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 981 | INLF | 1.25 | 1,226.25 | 2.00 | 1,962.00 | 0.75 | 735.75 | 1.20 | 1,177.20 | | 0057 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,168 | INLF | 1.25 | 1,460.00 | 2.00 | 2,336.00 | 0.85 | 992.80 | 1.35 | 1,576.80 | | 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,491 | INLF | 1.25 | 15,613.75 | 1.00 | 12,491.00 | 0.85 | 10,617.35 | 3.00 | 37,473.00 | | 0059 | NS-719-00002 | Tree Trimming | 1 | LUMP | 6,500.00 | 6,500.00 | 6,220.00 | 6,220.00 | 4,500.00 | 4,500.00 | 3,500.00 | 3,500.00 | | 0060 | NS-719-00003 | Root Pruning | 1 | LUMP | 6,500.00 | 6,500.00 | 34,120.00 | 34,120.00 | 4,500.00 | 4,500.00 | 3,000.00 | 3,000.00 | | 0061 | NS-MSC-00008 | Construction Photographs And Video | 1 | LUMP | 57,000.00 | 57,000.00 | 5,600.00 | 5,600.00 | 40,000.00 | 40,000.00 | 7,000.00 | 7,000.00 | | 0062 | TS-601-00100 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) | 16,280 | SQYD | 130.00 | 2,116,400.00 | 111.00 | 1,807,080.00 | 120.00 | 1,953,600.00 | 118.00 | 1,921,040.00 | | 0063 | TS-601-00500 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) (CROSSOVERS & TURNOUTS) | 670.4 | SQYD | 140.00 | 93,856.00 | 133.00 | 89,163.20 | 120.00 | 80,448.00 | 180.00 | 120,672.00 | | 0064 | TS-706-70100 | Concrete Walk (4-IN) (MESH REINFORCED, HIGH-EARLY) | 581.9 | SQYD | 80.00 | 46,552.00 | 93.00 | 54,116.70 | 96.00 | 55,862.40 | 128.00 | 74,483.20 | | 0065 | TS-706-70200 | Concrete Drive (6-IN) (WWF REINFORCED, HIGH-EARLY) | 1,827.6 | SQYD | 100.00 | 182,760.00 | 92.00 | 168,139.20 | 100.00 | 182,760.00 | 144.00 | 263,174.40 | | 0066 | TS-707-00100 | Concrete Curb (HIGH-EARLY) | 11,416.5 | LNFT | 20.00 | 228,330.00 | 19.00 | 216,913.50 | 23.00 | 262,579.50 | 17.00 | 194,080.50 | | 0067 | TS-741-10019 | Service Connections (WATER) (<1") (DIRECTIONAL DRILL) | 51 | EACH | 6,300.00 | 321,300.00 | 6,396.00 | 326,196.00 | 2,600.00 | 132,600.00 | 4,250.00 | 216,750.00 | | 0068 | TS-742-01031 | Pipe Cleaning and Video Inspection | 2,580 | LF | 25.00 | 64,500.00 | 296.00 | 763,680.00 | 15.00 | 38,700.00 | 20.00 | 51,600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,871,746.00 | | 7,268,734.14 | | 7,361,788.98 | | 7,530,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Cycle Construction Co. L.L.C. | - 10 - Boh Bros. Construction Co., LLC. | - 11 - J. CALDARERA & COMPANY, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.85 | LUMP | 150,000.00 | 150,000.00 | 140,000.00 | 140,000.00 | 156,000.00 | 156,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | 42,000.00 | 42,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 17,382.5 | SQYD | 14.00 | 243,355.00 | 12.00 | 208,590.00 | 25.00 | 434,562.50 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 11 | EACH | 1,550.00 | 17,050.00 | 1,400.00 | 15,400.00 | 1,255.00 | 13,805.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,613 | SQYD | 21.00 | 54,873.00 | 27.00 | 70,551.00 | 5.50 | 14,371.50 | | 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) (12" RCP) | 376 | LNFT | 40.00 | 15,040.00 | 32.00 | 12,032.00 | 50.00 | 18,800.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15" RCP) | 111 | LNFT | 42.00 | 4,662.00 | 35.00 | 3,885.00 | 115.00 | 12,765.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) (18" RCP) | 230 | LNFT | 44.00 | 10,120.00 | 40.00 | 9,200.00 | 115.00 | 26,450.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (24" RCP) | 173 | LNFT | 46.00 | 7,958.00 | 50.00 | 8,650.00 | 130.00 | 22,490.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (27" RCP) | 102 | LNFT | 50.00 | 5,100.00 | 55.00 | 5,610.00 | 130.00 | 13,260.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) (30" RCP) | 240 | LNFT | 60.00 | 14,400.00 | 60.00 | 14,400.00 | 145.00 | 34,800.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 410,000.00 | 410,000.00 | 223,500.00 | 223,500.00 | 169,000.00 | 169,000.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 2,443 | SQYD | 3.00 | 7,329.00 | 3.00 | 7,329.00 | 14.00 | 34,202.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 296 | EACH | 45.00 | 13,320.00 | 35.00 | 10,360.00 | 70.00 | 20,720.00 | | 0015 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 18,600.2 | SQYD | 48.00 | 892,809.60 | 60.00 | 1,116,012.00 | 69.00 | 1,283,413.80 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 754.5 | CUYD | 120.00 | 90,540.00 | 175.00 | 132,037.50 | 134.00 | 101,103.00 | | 0017 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) ( 6" AVG. THICK) | 864 | SQYD | 80.00 | 69,120.00 | 40.00 | 34,560.00 | 190.00 | 164,160.00 | | 0018 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) (6" Thick) | 542 | SQYD | 80.00 | 43,360.00 | 40.00 | 21,680.00 | 225.00 | 121,950.00 | | 0019 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 218 | LNFT | 174.00 | 37,932.00 | 210.00 | 45,780.00 | 150.00 | 32,700.00 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 892 | LNFT | 182.00 | 162,344.00 | 220.00 | 196,240.00 | 154.00 | 137,368.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 445 | LNFT | 210.00 | 93,450.00 | 260.00 | 115,700.00 | 201.00 | 89,445.00 | | 0022 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 639 | LNFT | 340.00 | 217,260.00 | 350.00 | 223,650.00 | 245.00 | 156,555.00 | | 0023 | 701-15-00100 | Concrete Collar | 72 | EACH | 1,250.00 | 90,000.00 | 2,200.00 | 158,400.00 | 1,300.00 | 93,600.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,194 | LNFT | 12.00 | 26,328.00 | 11.00 | 24,134.00 | 38.00 | 83,372.00 | | 0025 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 7,000.00 | 63,000.00 | 13,900.00 | 125,100.00 | 7,200.00 | 64,800.00 | | 0026 | 702-03-00700 | Catch Basins (CB-08) | 15 | EACH | 14,000.00 | 210,000.00 | 18,200.00 | 273,000.00 | 11,800.00 | 177,000.00 | | 0027 | 702-04-00100 | Adjusting Manholes | 14 | EACH | 2,600.00 | 36,400.00 | 1,800.00 | 25,200.00 | 1,200.00 | 16,800.00 | | 0028 | 702-04-00200 | Adjusting Catch Basins | 16 | EACH | 1,700.00 | 27,200.00 | 2,300.00 | 36,800.00 | 2,900.00 | 46,400.00 | | 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 77 | SQYD | 100.00 | 7,700.00 | 134.00 | 10,318.00 | 243.00 | 18,711.00 | | 0030 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 20.3 | SQYD | 120.00 | 2,436.00 | 270.00 | 5,481.00 | 212.00 | 4,303.60 | | 0031 | 706-04-00110 | Curb Ramps (Type 3) | 242.9 | SQYD | 250.00 | 60,725.00 | 320.00 | 77,728.00 | 125.00 | 30,362.50 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 100,000.00 | 100,000.00 | 76,000.00 | 76,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 142 | LNFT | 0.50 | 71.00 | 0.50 | 71.00 | 3.00 | 426.00 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 610 | LNFT | 0.85 | 518.50 | 0.90 | 549.00 | 5.00 | 3,050.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.071 | MILE | 332.00 | 23.57 | 400.00 | 28.40 | 63,000.00 | 4,473.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.112 | MILE | 792.00 | 880.70 | 800.00 | 889.60 | 6,250.00 | 6,950.00 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 6,867 | SQYD | 13.00 | 89,271.00 | 10.00 | 68,670.00 | 7.75 | 53,219.25 | | 0038 | 721-01-00100 | Mowing | 20 | CYCL | 815.00 | 16,300.00 | 400.00 | 8,000.00 | 4,000.00 | 80,000.00 | | 0039 | 726-01-00100 | Bedding Material | 981.4 | CUYD | 86.00 | 84,400.40 | 170.00 | 166,838.00 | 160.00 | 157,024.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 610,000.00 | 610,000.00 | 105,000.00 | 105,000.00 | 509,000.00 | 509,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 68.8 | SQFT | 22.00 | 1,513.60 | 25.00 | 1,720.00 | 43.00 | 2,958.40 | | 0042 | 729-02-00100 | Sign (Type B) | 94.8 | SQFT | 22.00 | 2,085.60 | 25.00 | 2,370.00 | 55.00 | 5,214.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 140.00 | 420.00 | 145.00 | 435.00 | 315.00 | 945.00 | | 0044 | 729-21-00100 | U-Channel Post | 31 | EACH | 160.00 | 4,960.00 | 165.00 | 5,115.00 | 125.00 | 3,875.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 35 | EACH | 5.00 | 175.00 | 5.00 | 175.00 | 55.00 | 1,925.00 | | 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,731 | LNFT | 1.75 | 20,529.25 | 2.00 | 23,462.00 | 4.00 | 46,924.00 | | 0047 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 142 | LNFT | 4.50 | 639.00 | 5.00 | 710.00 | 19.00 | 2,698.00 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,065 | LNFT | 17.00 | 18,105.00 | 17.00 | 18,105.00 | 35.00 | 37,275.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 2,280.00 | 161.88 | 2,000.00 | 142.00 | 25,000.00 | 1,775.00 | | 0050 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 7,400.00 | 199.80 | 8,000.00 | 216.00 | 50,000.00 | 1,350.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 320.00 | 640.00 | 1,250.00 | 2,500.00 | | 0052 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 310.00 | 620.00 | 350.00 | 700.00 | 1,250.00 | 2,500.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 180,000.00 | 180,000.00 | 78,000.00 | 78,000.00 | | 0054 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 70,000.00 | 70,000.00 | 245,000.00 | 245,000.00 | 220,000.00 | 220,000.00 | | 0055 | 804-18-00100 | Vibration Monitoring | 150 | DAY | 780.00 | 117,000.00 | 710.00 | 106,500.00 | 750.00 | 112,500.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 981 | INLF | 1.00 | 981.00 | 1.00 | 981.00 | 4.75 | 4,659.75 | | 0057 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,168 | INLF | 1.00 | 1,168.00 | 1.00 | 1,168.00 | 9.00 | 10,512.00 | | 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,491 | INLF | 1.50 | 18,736.50 | 1.00 | 12,491.00 | 8.00 | 99,928.00 | | 0059 | NS-719-00002 | Tree Trimming | 1 | LUMP | 7,000.00 | 7,000.00 | 5,700.00 | 5,700.00 | 63,000.00 | 63,000.00 | | 0060 | NS-719-00003 | Root Pruning | 1 | LUMP | 12,000.00 | 12,000.00 | 5,700.00 | 5,700.00 | 48,000.00 | 48,000.00 | | 0061 | NS-MSC-00008 | Construction Photographs And Video | 1 | LUMP | 50,000.00 | 50,000.00 | 78,000.00 | 78,000.00 | 103,000.00 | 103,000.00 | | 0062 | TS-601-00100 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) | 16,280 | SQYD | 130.00 | 2,116,400.00 | 135.00 | 2,197,800.00 | 175.00 | 2,849,000.00 | | 0063 | TS-601-00500 | Portland Cement Concrete Pavement (9" THICK) (WWF REINFORCED, HIGH-EARLY) (CROSSOVERS & TURNOUTS) | 670.4 | SQYD | 160.00 | 107,264.00 | 145.00 | 97,208.00 | 255.00 | 170,952.00 | | 0064 | TS-706-70100 | Concrete Walk (4-IN) (MESH REINFORCED, HIGH-EARLY) | 581.9 | SQYD | 81.00 | 47,133.90 | 110.00 | 64,009.00 | 230.00 | 133,837.00 | | 0065 | TS-706-70200 | Concrete Drive (6-IN) (WWF REINFORCED, HIGH-EARLY) | 1,827.6 | SQYD | 98.00 | 179,104.80 | 120.00 | 219,312.00 | 230.00 | 420,348.00 | | 0066 | TS-707-00100 | Concrete Curb (HIGH-EARLY) | 11,416.5 | LNFT | 28.00 | 319,662.00 | 25.00 | 285,412.50 | 52.00 | 593,658.00 | | 0067 | TS-741-10019 | Service Connections (WATER) (<1") (DIRECTIONAL DRILL) | 51 | EACH | 2,550.00 | 130,050.00 | 2,700.00 | 137,700.00 | 3,700.00 | 188,700.00 | | 0068 | TS-742-01031 | Pipe Cleaning and Video Inspection | 2,580 | LF | 37.00 | 95,460.00 | 18.00 | 46,440.00 | 25.00 | 64,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,537,246.10 | | 7,588,585.00 | | 9,795,946.30 |
|