Proposal:H.014064.6
Parish:Orleans
Routes:I-10
Description:I-10: FRANKLIN AVE - I-510
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$12,958,526.70
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $16,756,512.85 |
| 2 | 06276 | Barriere Construction Co., LLC | $19,997,085.56 |
| 3 | 73475 | Madden Gulf Coast, LLC | $21,148,285.03 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | - 3 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions Signal Pole Foundation | 1 | LUMP | 25,000.00 | 25,000.00 | 4,600.00 | 4,600.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-00020 | Removal of Asphalt/Aggregate Shoulder | 378.7 | SQYD | 25.00 | 9,467.50 | 90.00 | 34,083.00 | 40.00 | 15,148.00 | | 0003 | 202-02-00030 | Removal of Concrete Median Barrier and Footing | 125 | LNFT | 105.00 | 13,125.00 | 300.00 | 37,500.00 | 285.00 | 35,625.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement Existing Guardrail Pads | 5,982 | SQYD | 30.00 | 179,460.00 | 50.00 | 299,100.00 | 40.00 | 239,280.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 16 | LNFT | 20.00 | 320.00 | 51.00 | 816.00 | 50.00 | 800.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 102 | SQYD | 45.00 | 4,590.00 | 130.00 | 13,260.00 | 50.00 | 5,100.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 1,095 | LNFT | 17.00 | 18,615.00 | 41.00 | 44,895.00 | 20.00 | 21,900.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 8,972 | LNFT | 10.00 | 89,720.00 | 9.00 | 80,748.00 | 8.00 | 71,776.00 | | 0009 | 203-01-00100 | General Excavation | 21 | CUYD | 200.00 | 4,200.00 | 85.00 | 1,785.00 | 200.00 | 4,200.00 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 546 | CUYD | 100.00 | 54,600.00 | 175.00 | 95,550.00 | 175.00 | 95,550.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,792 | CUYD | 30.00 | 83,760.00 | 0.31 | 865.52 | 93.00 | 259,656.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 20,521.4 | TON | 150.00 | 3,078,210.00 | 160.00 | 3,283,424.00 | 170.00 | 3,488,638.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,646.9 | TON | 200.00 | 329,380.00 | 343.00 | 564,886.70 | 350.00 | 576,415.00 | | 0014 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 25,648.9 | TON | 165.00 | 4,232,068.50 | 202.00 | 5,181,077.80 | 215.00 | 5,514,513.50 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 390,779 | SQYD | 3.00 | 1,172,337.00 | 5.00 | 1,953,895.00 | 5.50 | 2,149,284.50 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -21,715 | CUYD | 0.15 | -3,257.25 | 0.01 | -217.15 | 0.01 | -217.15 | | 0017 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 458 | SQYD | 200.00 | 91,600.00 | 160.00 | 73,280.00 | 187.00 | 85,646.00 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 17,059 | LNFT | 3.50 | 59,706.50 | 3.00 | 51,177.00 | 2.68 | 45,718.12 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 17,888 | LNFT | 4.00 | 71,552.00 | 3.00 | 53,664.00 | 2.70 | 48,297.60 | | 0020 | 602-03-00100 | Cleaning and Sealing Random Cracks | 300 | LNFT | 4.75 | 1,425.00 | 6.00 | 1,800.00 | 5.65 | 1,695.00 | | 0021 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 26 | SQYD | 995.00 | 25,870.00 | 400.00 | 10,400.00 | 700.00 | 18,200.00 | | 0022 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 73.3 | SQYD | 760.00 | 55,708.00 | 400.00 | 29,320.00 | 650.00 | 47,645.00 | | 0023 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 472 | SQYD | 420.00 | 198,240.00 | 400.00 | 188,800.00 | 500.00 | 236,000.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 350.5 | LNFT | 90.00 | 31,545.00 | 52.00 | 18,226.00 | 44.50 | 15,597.25 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 7,238.2 | LNFT | 25.00 | 180,955.00 | 38.00 | 275,051.60 | 32.25 | 233,431.95 | | 0026 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 207.9 | LNFT | 140.00 | 29,106.00 | 224.00 | 46,569.60 | 190.00 | 39,501.00 | | 0027 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 47.5 | LNFT | 175.00 | 8,312.50 | 81.00 | 3,847.50 | 69.00 | 3,277.50 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 775 | LNFT | 120.00 | 93,000.00 | 146.00 | 113,150.00 | 124.00 | 96,100.00 | | 0029 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 14 | EACH | 5,000.00 | 70,000.00 | 4,300.00 | 60,200.00 | 3,650.00 | 51,100.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 37 | EACH | 5,000.00 | 185,000.00 | 3,800.00 | 140,600.00 | 3,250.00 | 120,250.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 188.6 | SQYD | 125.00 | 23,575.00 | 86.00 | 16,219.60 | 150.00 | 28,290.00 | | 0032 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 120.3 | SQYD | 130.00 | 15,639.00 | 140.00 | 16,842.00 | 200.00 | 24,060.00 | | 0033 | 706-04-00110 | Curb Ramps TYPE 2 | 20.8 | SQYD | 320.00 | 6,656.00 | 280.00 | 5,824.00 | 350.00 | 7,280.00 | | 0034 | 706-04-00110 | Curb Ramps TYPE 3 | 129.6 | SQYD | 395.00 | 51,192.00 | 280.00 | 36,288.00 | 350.00 | 45,360.00 | | 0035 | 706-04-00110 | Curb Ramps TYPE 7 | 13.3 | SQYD | 260.00 | 3,458.00 | 280.00 | 3,724.00 | 350.00 | 4,655.00 | | 0036 | 706-04-00110 | Curb Ramps TYPE 8 | 15.5 | SQYD | 270.00 | 4,185.00 | 280.00 | 4,340.00 | 350.00 | 5,425.00 | | 0037 | 707-01-00100 | Concrete Curb | 1,318.5 | LNFT | 60.00 | 79,110.00 | 41.00 | 54,058.50 | 135.00 | 177,997.50 | | 0038 | 707-03-00100 | Combination Concrete Curb and Gutter | 28 | LNFT | 70.00 | 1,960.00 | 110.00 | 3,080.00 | 155.00 | 4,340.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,750,000.00 | 1,750,000.00 | 1,900,000.00 | 1,900,000.00 | 2,770,000.00 | 2,770,000.00 | | 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 67,033 | LNFT | 0.40 | 26,813.20 | 1.25 | 83,791.25 | 0.35 | 23,461.55 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 6,920 | LNFT | 1.25 | 8,650.00 | 1.75 | 12,110.00 | 1.00 | 6,920.00 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 66.777 | MILE | 200.00 | 13,355.40 | 1,605.00 | 107,177.09 | 350.00 | 23,371.95 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 66.777 | MILE | 1,000.00 | 66,777.00 | 600.00 | 40,066.20 | 1,000.00 | 66,777.00 | | 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 92.367 | MILE | 1,500.00 | 138,550.50 | 800.00 | 73,893.60 | 1,500.00 | 138,550.50 | | 0045 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 14 | EACH | 50.00 | 700.00 | 30.00 | 420.00 | 50.00 | 700.00 | | 0046 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 50.00 | 700.00 | 30.00 | 420.00 | 50.00 | 700.00 | | 0047 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 50.00 | 400.00 | 30.00 | 240.00 | 50.00 | 400.00 | | 0048 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 18 | EACH | 50.00 | 900.00 | 40.00 | 720.00 | 50.00 | 900.00 | | 0049 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 10,000.00 | 40,000.00 | 40,000.00 | 160,000.00 | 22,000.00 | 88,000.00 | | 0050 | 716-01-00100 | Mulch (Vegetative) | 15.8 | TON | 750.00 | 11,850.00 | 700.00 | 11,060.00 | 698.50 | 11,036.30 | | 0051 | 717-01-00100 | Seeding | 477 | LB | 15.00 | 7,155.00 | 13.00 | 6,201.00 | 12.85 | 6,129.45 | | 0052 | 718-01-00100 | Fertilizer | 7,986 | LB | 1.00 | 7,986.00 | 1.00 | 7,986.00 | 0.92 | 7,347.12 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 19.063 | MILE | 500.00 | 9,531.50 | 275.00 | 5,242.33 | 1,150.00 | 21,922.45 | | 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 1,600,000.00 | 1,600,000.00 | 1,900,000.00 | 1,900,000.00 | 2,000,000.00 | 2,000,000.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 77 | EACH | 140.00 | 10,780.00 | 85.00 | 6,545.00 | 85.00 | 6,545.00 | | 0056 | 731-02-00100 | Reflectorized Raised Pavement Markers | 31,095 | EACH | 9.00 | 279,855.00 | 4.00 | 124,380.00 | 8.00 | 248,760.00 | | 0057 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 26,566 | LNFT | 3.25 | 86,339.50 | 3.25 | 86,339.50 | 3.00 | 79,698.00 | | 0058 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 3,234 | LNFT | 13.00 | 42,042.00 | 16.00 | 51,744.00 | 12.00 | 38,808.00 | | 0059 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 899 | LNFT | 4.00 | 3,596.00 | 4.00 | 3,596.00 | 3.50 | 3,146.50 | | 0060 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 226 | LNFT | 25.00 | 5,650.00 | 15.00 | 3,390.00 | 20.00 | 4,520.00 | | 0061 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 46.184 | MILE | 6,500.00 | 300,196.00 | 430.00 | 19,859.12 | 5,750.00 | 265,558.00 | | 0062 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 33.388 | MILE | 2,000.00 | 66,776.00 | 2,100.00 | 70,114.80 | 1,750.00 | 58,429.00 | | 0063 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.231 | MILE | 6,500.00 | 8,001.50 | 8,000.00 | 9,848.00 | 6,000.00 | 7,386.00 | | 0064 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 5.463 | MILE | 12,000.00 | 65,556.00 | 11,000.00 | 60,093.00 | 10,000.00 | 54,630.00 | | 0065 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 13 | EACH | 400.00 | 5,200.00 | 300.00 | 3,900.00 | 350.00 | 4,550.00 | | 0066 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 400.00 | 5,200.00 | 300.00 | 3,900.00 | 350.00 | 4,550.00 | | 0067 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 400.00 | 2,800.00 | 300.00 | 2,100.00 | 350.00 | 2,450.00 | | 0068 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 400.00 | 7,200.00 | 350.00 | 6,300.00 | 350.00 | 6,300.00 | | 0069 | 732-05-00100 | Removal of Existing Markings | 3.639 | MILE | 8,500.00 | 30,931.50 | 4,000.00 | 14,556.00 | 7,500.00 | 27,292.50 | | 0070 | 736-01-00100 | Trenching and Backfilling | 70 | LNFT | 25.00 | 1,750.00 | 14.00 | 980.00 | 12.57 | 879.90 | | 0071 | 736-09-00100 | Loop Detector | 2,560 | LNFT | 45.00 | 115,200.00 | 41.00 | 104,960.00 | 39.70 | 101,632.00 | | 0072 | 736-10-00200 | Underground Junction Box (Type E) | 14 | EACH | 1,500.00 | 21,000.00 | 1,500.00 | 21,000.00 | 1,404.63 | 19,664.82 | | 0073 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 70 | LNFT | 25.00 | 1,750.00 | 5.00 | 350.00 | 4.77 | 333.90 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | 1,020,000.00 | 1,020,000.00 | 72,000.00 | 72,000.00 | | 0075 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 297,308 | LNFT | 2.00 | 594,616.00 | 2.00 | 594,616.00 | 1.85 | 550,019.80 | | 0076 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 101,832 | LNFT | 2.00 | 203,664.00 | 2.00 | 203,664.00 | 2.01 | 204,682.32 | | 0077 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 399,140 | LNFT | 1.00 | 399,140.00 | 0.80 | 319,312.00 | 0.78 | 311,329.20 | | 0078 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,608 | INLF | 1.25 | 2,010.00 | 2.50 | 4,020.00 | 2.00 | 3,216.00 | | 0079 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) | 1 | EACH | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | 30,652.00 | 30,652.00 | | 0080 | NS-830-00500 | Roadway Barrier Repair and Rehabilitation | 56 | LNFT | 500.00 | 28,000.00 | 1,900.00 | 106,400.00 | 800.00 | 44,800.00 | | 0081 | 202-02-06102 | Removal of Incidental Concrete Paving | 60 | SQYD | 25.00 | 1,500.00 | 51.00 | 3,060.00 | 45.00 | 2,700.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 16,756,512.85 | | 19,997,085.56 | | 21,148,285.03 |
|