Proposal:H.013130.6
Parish:Ouachita
Description:RED CUT RD & CHARLES RAWLS RD BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE SLAB BRIDGE, REMOVAL OF TIMBER BRIDGE, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$2,791,139.00
| Rank | License | Bidder | Construction Bid |
| 1 | 56994 | Matt L. Guinn Construction, LLC | $2,454,267.05 |
| 2 | 00044 | Guinn Construction, LLC | $2,690,001.75 |
| 3 | 39613 | BAKER PILE DRIVING AND SITE WORK LLC | $2,844,020.68 |
| 4 | 01516 | Elevate Heavy Civil Construction, LLC | $2,925,507.15 |
| 5 | 49239 | WL Bass Construction Inc. | $3,013,134.28 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $3,277,407.50 |
| 7 | 14788 | Louisiana Bridge, Inc. | $3,330,687.00 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $3,399,008.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Matt L. Guinn Construction, LLC | - 2 - Guinn Construction, LLC | - 3 - BAKER PILE DRIVING AND SITE WORK LLC | - 4 - Elevate Heavy Civil Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.248 | LUMP | 105,000.00 | 105,000.00 | 100,000.00 | 100,000.00 | 118,474.34 | 118,474.34 | 150,000.00 | 150,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 726.3 | SQYD | 8.50 | 6,173.55 | 12.50 | 9,078.75 | 33.00 | 23,967.90 | 21.00 | 15,252.30 | | 0003 | 202-02-04501 | Removal of Bridge (Sta. 100+00, 20.0' Wide x 57.0' Long Concrete Slab Bridge with Timber Piles, Asphalt Overlay) | 1,579 | LUMP | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 | 78,904.35 | 78,904.35 | 75,000.00 | 75,000.00 | | 0004 | 202-02-04501 | Removal of Bridge (Sta. 200+00, 19.0' Wide x 76.0' Long Timber Bridge with Asphalt Overlay) | 1,438 | LUMP | 26,000.00 | 26,000.00 | 32,500.00 | 32,500.00 | 69,400.35 | 69,400.35 | 75,000.00 | 75,000.00 | | 0005 | 202-02-12000 | Removal of Fence | 640 | LNFT | 6.00 | 3,840.00 | 5.00 | 3,200.00 | 6.92 | 4,428.80 | 10.00 | 6,400.00 | | 0006 | 203-02-00100 | Drainage Excavation | 1,653 | CUYD | 26.50 | 43,804.50 | 35.00 | 57,855.00 | 32.31 | 53,408.43 | 15.00 | 24,795.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 48,000.00 | 48,000.00 | 60,000.00 | 60,000.00 | 83,543.31 | 83,543.31 | 65,000.00 | 65,000.00 | | 0008 | 204-03-00100 | Temporary Slope Drains | 77 | LNFT | 2.00 | 154.00 | 10.00 | 770.00 | 22.90 | 1,763.30 | 50.00 | 3,850.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 310.00 | 2,170.00 | 500.00 | 3,500.00 | 258.81 | 1,811.67 | 155.00 | 1,085.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,885 | LNFT | 3.50 | 6,597.50 | 4.00 | 7,540.00 | 3.61 | 6,804.85 | 2.15 | 4,052.75 | | 0011 | 302-01-00300 | Class II Base Course (Crushed Stone) | 435.1 | CUYD | 200.00 | 87,020.00 | 250.00 | 108,775.00 | 207.00 | 90,065.70 | 163.00 | 70,921.30 | | 0012 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 1,500.00 | 12,000.00 | 2,000.00 | 16,000.00 | 1,409.40 | 11,275.20 | 550.00 | 4,400.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 200.00 | 3,000.00 | 300.00 | 4,500.00 | 268.92 | 4,033.80 | 178.00 | 2,670.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 297.2 | TON | 290.00 | 86,188.00 | 325.00 | 96,590.00 | 664.00 | 197,340.80 | 317.00 | 94,212.40 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 40.00 | 4,000.00 | 40.00 | 4,000.00 | 35.64 | 3,564.00 | 31.00 | 3,100.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 140.00 | 28,000.00 | 150.00 | 30,000.00 | 108.00 | 21,600.00 | 120.00 | 24,000.00 | | 0017 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 4,250.00 | 34,000.00 | 4,000.00 | 32,000.00 | 3,456.00 | 27,648.00 | 3,700.00 | 29,600.00 | | 0018 | 705-01-00100 | Barbed Wire Fence | 758 | LNFT | 15.00 | 11,370.00 | 25.00 | 18,950.00 | 21.51 | 16,304.58 | 15.00 | 11,370.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,349 | SQYD | 125.00 | 168,625.00 | 150.00 | 202,350.00 | 110.36 | 148,875.64 | 104.00 | 140,296.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 1,349 | SQYD | 5.00 | 6,745.00 | 5.00 | 6,745.00 | 2.91 | 3,925.59 | 2.60 | 3,507.40 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 21,806.45 | 21,806.45 | 34,000.00 | 34,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 1.7 | TON | 2,300.00 | 3,910.00 | 5,000.00 | 8,500.00 | 3,206.00 | 5,450.20 | 1,250.00 | 2,125.00 | | 0023 | 717-01-00100 | Seeding | 39 | LB | 50.00 | 1,950.00 | 50.00 | 1,950.00 | 18.77 | 732.03 | 50.00 | 1,950.00 | | 0024 | 718-01-00100 | Fertilizer | 850 | LB | 1.75 | 1,487.50 | 3.00 | 2,550.00 | 1.08 | 918.00 | 1.00 | 850.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 261,500.00 | 261,500.00 | 273,225.18 | 273,225.18 | 292,659.00 | 292,659.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 200.00 | 1,600.00 | 150.00 | 1,200.00 | 81.00 | 648.00 | 90.00 | 720.00 | | 0027 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 1,700 | LNFT | 6.00 | 10,200.00 | 4.00 | 6,800.00 | 3.37 | 5,729.00 | 1.25 | 2,125.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 16,673.13 | 16,673.13 | 17,000.00 | 17,000.00 | | 0029 | 804-01-00300 | Precast Concrete Piles (16") | 2,420 | LNFT | 150.00 | 363,000.00 | 150.00 | 363,000.00 | 174.41 | 422,072.20 | 200.00 | 484,000.00 | | 0030 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast-in-place) | 2,400 | SQFT | 225.00 | 540,000.00 | 235.00 | 564,000.00 | 211.33 | 507,192.00 | 250.00 | 600,000.00 | | 0031 | 805-12-00300 | Bridge Superstructure and Substructure (24' Roadway, 60 Degree Crossing) (Cast-in-place) | 1,920 | SQFT | 225.00 | 432,000.00 | 235.00 | 451,200.00 | 234.21 | 449,683.20 | 250.00 | 480,000.00 | | 0032 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,138 | SQFT | 2.50 | 5,345.00 | 3.00 | 6,414.00 | 5.90 | 12,614.20 | 2.00 | 4,276.00 | | 0033 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,138 | SQFT | 2.50 | 5,345.00 | 3.00 | 6,414.00 | 4.54 | 9,706.52 | 3.00 | 6,414.00 | | 0034 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' Roadway; 60 Degree Crossing)(10' Long) | 500 | SQFT | 90.00 | 45,000.00 | 115.00 | 57,500.00 | 157.14 | 78,570.00 | 190.00 | 95,000.00 | | 0035 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (Curved)(24' Roadway; 90 Degree Crossing)(10' Long) | 500 | SQFT | 90.00 | 45,000.00 | 115.00 | 57,500.00 | 141.99 | 70,995.00 | 190.00 | 95,000.00 | | 0036 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 212 | INLF | 3.50 | 742.00 | 10.00 | 2,120.00 | 4.08 | 864.96 | 23.00 | 4,876.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,454,267.05 | | 2,690,001.75 | | 2,844,020.68 | | 2,925,507.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - Diamond B Construction Co., L.L.C. | - 7 - Louisiana Bridge, Inc. | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.248 | LUMP | 100,000.00 | 100,000.00 | 175,000.00 | 175,000.00 | 360,000.00 | 360,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 726.3 | SQYD | 9.25 | 6,718.28 | 20.00 | 14,526.00 | 20.00 | 14,526.00 | 20.00 | 14,526.00 | | 0003 | 202-02-04501 | Removal of Bridge (Sta. 100+00, 20.0' Wide x 57.0' Long Concrete Slab Bridge with Timber Piles, Asphalt Overlay) | 1,579 | LUMP | 40,500.00 | 40,500.00 | 82,500.00 | 82,500.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0004 | 202-02-04501 | Removal of Bridge (Sta. 200+00, 19.0' Wide x 76.0' Long Timber Bridge with Asphalt Overlay) | 1,438 | LUMP | 48,000.00 | 48,000.00 | 65,000.00 | 65,000.00 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | | 0005 | 202-02-12000 | Removal of Fence | 640 | LNFT | 1.00 | 640.00 | 10.00 | 6,400.00 | 10.00 | 6,400.00 | 5.00 | 3,200.00 | | 0006 | 203-02-00100 | Drainage Excavation | 1,653 | CUYD | 20.00 | 33,060.00 | 23.00 | 38,019.00 | 26.00 | 42,978.00 | 25.00 | 41,325.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 98,000.00 | 98,000.00 | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | 160,000.00 | 160,000.00 | | 0008 | 204-03-00100 | Temporary Slope Drains | 77 | LNFT | 50.00 | 3,850.00 | 90.00 | 6,930.00 | 120.00 | 9,240.00 | 52.00 | 4,004.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 155.00 | 1,085.00 | 155.00 | 1,085.00 | 300.00 | 2,100.00 | 155.00 | 1,085.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,885 | LNFT | 3.00 | 5,655.00 | 2.25 | 4,241.25 | 4.00 | 7,540.00 | 4.00 | 7,540.00 | | 0011 | 302-01-00300 | Class II Base Course (Crushed Stone) | 435.1 | CUYD | 250.00 | 108,775.00 | 220.00 | 95,722.00 | 210.00 | 91,371.00 | 195.00 | 84,844.50 | | 0012 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 3,000.00 | 24,000.00 | 1,900.00 | 15,200.00 | 2,000.00 | 16,000.00 | 1,600.00 | 12,800.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 180.00 | 2,700.00 | 280.00 | 4,200.00 | 240.00 | 3,600.00 | 230.00 | 3,450.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 297.2 | TON | 315.00 | 93,618.00 | 285.00 | 84,702.00 | 315.00 | 93,618.00 | 300.00 | 89,160.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 25.00 | 2,500.00 | 35.00 | 3,500.00 | 35.00 | 3,500.00 | 31.00 | 3,100.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 100.00 | 20,000.00 | 130.00 | 26,000.00 | 135.00 | 27,000.00 | 120.00 | 24,000.00 | | 0017 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,200.00 | 25,600.00 | 3,900.00 | 31,200.00 | 3,850.00 | 30,800.00 | 3,700.00 | 29,600.00 | | 0018 | 705-01-00100 | Barbed Wire Fence | 758 | LNFT | 15.00 | 11,370.00 | 15.00 | 11,370.00 | 10.00 | 7,580.00 | 15.00 | 11,370.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,349 | SQYD | 125.00 | 168,625.00 | 125.00 | 168,625.00 | 120.00 | 161,880.00 | 110.00 | 148,390.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 1,349 | SQYD | 4.00 | 5,396.00 | 1.25 | 1,686.25 | 4.00 | 5,396.00 | 2.20 | 2,967.80 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 59,000.00 | 59,000.00 | 235,000.00 | 235,000.00 | 40,000.00 | 40,000.00 | 120,000.00 | 120,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 1.7 | TON | 1,250.00 | 2,125.00 | 1,250.00 | 2,125.00 | 2,000.00 | 3,400.00 | 1,250.00 | 2,125.00 | | 0023 | 717-01-00100 | Seeding | 39 | LB | 30.00 | 1,170.00 | 30.00 | 1,170.00 | 60.00 | 2,340.00 | 30.00 | 1,170.00 | | 0024 | 718-01-00100 | Fertilizer | 850 | LB | 1.00 | 850.00 | 1.00 | 850.00 | 3.00 | 2,550.00 | 1.00 | 850.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 320,000.00 | 320,000.00 | 498,640.00 | 498,640.00 | 330,000.00 | 330,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 130.00 | 1,040.00 | 130.00 | 1,040.00 | 90.00 | 720.00 | | 0027 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 1,700 | LNFT | 2.00 | 3,400.00 | 2.00 | 3,400.00 | 4.00 | 6,800.00 | 2.00 | 3,400.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 115,000.00 | 115,000.00 | 39,000.00 | 39,000.00 | 150,000.00 | 150,000.00 | | 0029 | 804-01-00300 | Precast Concrete Piles (16") | 2,420 | LNFT | 210.00 | 508,200.00 | 252.00 | 609,840.00 | 215.00 | 520,300.00 | 220.00 | 532,400.00 | | 0030 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast-in-place) | 2,400 | SQFT | 242.00 | 580,800.00 | 175.00 | 420,000.00 | 220.00 | 528,000.00 | 185.00 | 444,000.00 | | 0031 | 805-12-00300 | Bridge Superstructure and Substructure (24' Roadway, 60 Degree Crossing) (Cast-in-place) | 1,920 | SQFT | 252.00 | 483,840.00 | 250.00 | 480,000.00 | 235.00 | 451,200.00 | 186.00 | 357,120.00 | | 0032 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,138 | SQFT | 1.00 | 2,138.00 | 5.00 | 10,690.00 | 3.00 | 6,414.00 | 7.00 | 14,966.00 | | 0033 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,138 | SQFT | 1.50 | 3,207.00 | 5.00 | 10,690.00 | 3.00 | 6,414.00 | 4.60 | 9,834.80 | | 0034 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' Roadway; 60 Degree Crossing)(10' Long) | 500 | SQFT | 195.00 | 97,500.00 | 105.00 | 52,500.00 | 150.00 | 75,000.00 | 190.00 | 95,000.00 | | 0035 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (Curved)(24' Roadway; 90 Degree Crossing)(10' Long) | 500 | SQFT | 200.00 | 100,000.00 | 105.00 | 52,500.00 | 150.00 | 75,000.00 | 190.00 | 95,000.00 | | 0036 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 212 | INLF | 1.00 | 212.00 | 8.00 | 1,696.00 | 5.00 | 1,060.00 | 5.00 | 1,060.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,013,134.28 | | 3,277,407.50 | | 3,330,687.00 | | 3,399,008.10 |
|