Proposal:H.012130.6
Parish:St. Martin
Routes:LA 347
Description:LA 347: LOCAL ROAD (WILL ANGELLE ROAD) - LA 686
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,042,370.95
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $3,997,383.13 |
| 2 | 34356 | Prairie Contractors LLC | $4,230,094.61 |
| 3 | 33663 | Glenn Lege Construction LLC | $6,213,034.16 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | - 3 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 430 | SQYD | 40.00 | 17,200.00 | 56.00 | 24,080.00 | 6.50 | 2,795.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 4 | SQYD | 450.00 | 1,800.00 | 100.00 | 400.00 | 14.00 | 56.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" RCP | 8 | LNFT | 75.00 | 600.00 | 85.00 | 680.00 | 50.00 | 400.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 557 | CUYD | 60.00 | 33,420.00 | 111.00 | 61,827.00 | 36.00 | 20,052.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 60 | EACH | 150.00 | 9,000.00 | 135.00 | 8,100.00 | 174.23 | 10,453.80 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,971 | CUYD | 55.00 | 163,405.00 | 109.00 | 323,839.00 | 132.00 | 392,172.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 75.00 | 7,500.00 | 95.00 | 9,500.00 | 109.99 | 10,999.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 18,582.1 | TON | 130.00 | 2,415,673.00 | 123.50 | 2,294,889.35 | 164.00 | 3,047,464.40 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 964.7 | TON | 195.00 | 188,116.50 | 191.00 | 184,257.70 | 279.90 | 270,019.53 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 80,931 | SQYD | 2.50 | 202,327.50 | 3.30 | 267,072.30 | 8.00 | 647,448.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,385 | CUYD | 0.01 | -33.85 | 0.01 | -33.85 | 0.01 | -33.85 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,235 | SQYD | 135.00 | 436,725.00 | 150.00 | 485,250.00 | 155.00 | 501,425.00 | | 0013 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 8 | LNFT | 350.00 | 2,800.00 | 550.00 | 4,400.00 | 290.00 | 2,320.00 | | 0014 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,995.00 | 1,995.00 | 3,750.00 | 3,750.00 | 2,302.08 | 2,302.08 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | 540,655.02 | 540,655.02 | | 0016 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 2.00 | 72.00 | 0.01 | 0.36 | 1.16 | 41.76 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.515 | MILE | 795.00 | 10,744.43 | 5,650.00 | 76,359.75 | 818.10 | 11,056.62 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.515 | MILE | 660.00 | 8,919.90 | 1.00 | 13.52 | 696.90 | 9,418.60 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 48.027 | MILE | 935.00 | 44,905.25 | 1.00 | 48.03 | 987.28 | 47,416.10 | | 0020 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 11.396 | MILE | 1,100.00 | 12,535.60 | 1,200.00 | 13,675.20 | 313.61 | 3,573.90 | | 0021 | 726-01-00100 | Bedding Material | 0.9 | CUYD | 280.00 | 252.00 | 525.00 | 472.50 | 275.00 | 247.50 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 535,378.28 | 535,378.28 | | 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 42 | EACH | 85.00 | 3,570.00 | 80.00 | 3,360.00 | 87.11 | 3,658.62 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 922 | EACH | 5.00 | 4,610.00 | 5.00 | 4,610.00 | 4.65 | 4,287.30 | | 0025 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 12 | LNFT | 14.00 | 168.00 | 30.00 | 360.00 | 15.10 | 181.20 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.009 | MILE | 4,350.00 | 69,639.15 | 5,000.00 | 80,045.00 | 4,587.93 | 73,448.17 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.505 | MILE | 1,650.00 | 7,433.25 | 1,750.00 | 7,883.75 | 1,742.25 | 7,848.84 | | 0028 | 735-01-00100 | Mailboxes | 91 | EACH | 22.00 | 2,002.00 | 10.00 | 910.00 | 25.55 | 2,325.05 | | 0029 | 735-02-00100 | Mailbox Supports (Single) | 91 | EACH | 275.00 | 25,025.00 | 275.00 | 25,025.00 | 261.34 | 23,781.94 | | 0030 | 739-01-00100 | Hydro-Seeding | 2.08 | ACRE | 3,355.00 | 6,978.40 | 4,000.00 | 8,320.00 | 3,194.13 | 6,643.79 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 35,198.51 | 35,198.51 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,997,383.13 | | 4,230,094.61 | | 6,213,034.16 |
|