Proposal:H.016059.6
Parish:Caddo
Routes:LA 530
Description:LA 530: LA 538 TO I-49
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$4,617,408.28
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $4,708,953.23 |
| 2 | 17464 | Benton & Brown, LLC. | $5,931,928.94 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 26.9 | LUMP | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions Cross Drains | 1 | LUMP | 10,000.00 | 10,000.00 | 70,000.00 | 70,000.00 | | 0003 | 202-01-00100 | Removal of Structures and Obstructions Removal of oilfield pipes in Cross Drains | 1 | LUMP | 50,000.00 | 50,000.00 | 44,000.00 | 44,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 33 | SQYD | 50.00 | 1,650.00 | 55.00 | 1,815.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 638 | LNFT | 12.00 | 7,656.00 | 13.00 | 8,294.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,245 | CUYD | 30.00 | 67,350.00 | 55.00 | 123,475.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 50 | EACH | 10.00 | 500.00 | 55.00 | 2,750.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 750 | LNFT | 10.00 | 7,500.00 | 5.50 | 4,125.00 | | 0009 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 39,274 | SQYD | 16.80 | 659,803.20 | 21.00 | 824,754.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7 | CUYD | 100.00 | 700.00 | 330.00 | 2,310.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 15,068.8 | TON | 149.00 | 2,245,251.20 | 160.00 | 2,411,008.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 227.2 | TON | 157.15 | 35,704.48 | 400.00 | 90,880.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 69,377 | SQYD | 6.00 | 416,262.00 | 7.00 | 485,639.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,666 | CUYD | 0.10 | -466.60 | 0.01 | -46.66 | | 0015 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 192 | SQYD | 50.00 | 9,600.00 | 125.00 | 24,000.00 | | 0016 | 510-02-00100 | Pavement Widening 12" Thick | 2,712 | SQYD | 100.00 | 271,200.00 | 170.00 | 461,040.00 | | 0017 | 701-01-02006 | Cross Drain Pipe (24" RCP/RPVCP/CMP) | 53 | LNFT | 172.95 | 9,166.35 | 248.00 | 13,144.00 | | 0018 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 132 | LNFT | 280.00 | 36,960.00 | 440.00 | 58,080.00 | | 0019 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 132 | LNFT | 485.00 | 64,020.00 | 550.00 | 72,600.00 | | 0020 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 152 | LNFT | 176.50 | 26,828.00 | 825.00 | 125,400.00 | | 0021 | 701-12-01060 | Corrugated Metal Pipe (Extension) (24") | 4 | LNFT | 585.00 | 2,340.00 | 2,200.00 | 8,800.00 | | 0022 | 701-15-00100 | Concrete Collar | 20 | EACH | 750.00 | 15,000.00 | 3,300.00 | 66,000.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 185 | LNFT | 100.00 | 18,500.00 | 5.50 | 1,017.50 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 518 | LNFT | 175.00 | 90,650.00 | 66.00 | 34,188.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 337.5 | LNFT | 38.00 | 12,825.00 | 42.00 | 14,175.00 | | 0026 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,900.00 | 15,600.00 | 4,300.00 | 17,200.00 | | 0027 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 35 | SQYD | 200.00 | 7,000.00 | 220.00 | 7,700.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 50.00 | 1,750.00 | 22.00 | 770.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 165,000.00 | 165,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.773 | MILE | 500.00 | 5,386.50 | 1,000.00 | 10,773.00 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.656 | MILE | 500.00 | 4,328.00 | 550.00 | 4,760.80 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.956 | MILE | 500.00 | 14,478.00 | 550.00 | 15,925.80 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 748 | EACH | 20.00 | 14,960.00 | 4.00 | 2,992.00 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 19.6 | TON | 1,000.00 | 19,600.00 | 935.00 | 18,326.00 | | 0035 | 717-01-00100 | Seeding | 587 | LB | 25.00 | 14,675.00 | 22.00 | 12,914.00 | | 0036 | 718-01-00100 | Fertilizer | 9,787 | LB | 1.10 | 10,765.70 | 1.00 | 9,787.00 | | 0037 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0038 | 726-01-00100 | Bedding Material | 143.7 | CUYD | 100.00 | 14,370.00 | 275.00 | 39,517.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 165,000.00 | 165,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 80.00 | 1,760.00 | 88.00 | 1,936.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 138.00 | 552.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,658 | EACH | 9.00 | 14,922.00 | 10.00 | 16,580.00 | | 0043 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 796 | LNFT | 30.00 | 23,880.00 | 33.00 | 26,268.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.478 | MILE | 6,300.00 | 91,211.40 | 7,000.00 | 101,346.00 | | 0045 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.122 | MILE | 30,000.00 | 3,660.00 | 33,000.00 | 4,026.00 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.328 | MILE | 4,000.00 | 17,312.00 | 4,400.00 | 19,043.20 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 750.00 | 1,500.00 | 825.00 | 1,650.00 | | 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 750.00 | 1,500.00 | 825.00 | 1,650.00 | | 0049 | 735-01-00100 | Mailboxes | 7 | EACH | 20.00 | 140.00 | 22.00 | 154.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 500.00 | 3,500.00 | 550.00 | 3,850.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 1,302 | LNFT | 20.00 | 26,040.00 | 44.00 | 57,288.00 | | 0053 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 20 | EACH | 2,000.00 | 40,000.00 | 2,400.00 | 48,000.00 | | 0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 446 | INLF | 2.50 | 1,115.00 | 3.30 | 1,471.80 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,708,953.23 | | 5,931,928.94 |
|