Bid Tabulations for the Letting of 4/9/2025 LA DOTD Headquarters

Proposal:H.016059.6
Parish:Caddo
Routes:LA 530
Description:LA 530: LA 538 TO I-49
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$4,617,408.28
Rank License BidderConstruction Bid
167822Earnest Contracting LLC$4,708,953.23
217464Benton & Brown, LLC.$5,931,928.94


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Earnest Contracting LLC
- 2 -
Benton & Brown, LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 26.9   LUMP50,000.0050,000.00150,000.00150,000.00
0002202-01-00100Removal of Structures and Obstructions Cross Drains1     LUMP10,000.0010,000.0070,000.0070,000.00
0003202-01-00100Removal of Structures and Obstructions Removal of oilfield pipes in Cross Drains1     LUMP50,000.0050,000.0044,000.0044,000.00
0004202-02-02000Removal of Asphalt Drives 33     SQYD50.001,650.0055.001,815.00
0005202-02-14500Removal of Guard Rail 638     LNFT12.007,656.0013.008,294.00
0006203-07-00100Borrow (Vehicular Measurement) 2,245     CUYD30.0067,350.0055.00123,475.00
0007204-02-00100Temporary Hay Bales 50     EACH10.00500.0055.002,750.00
0008204-06-00100Temporary Silt Fencing 750     LNFT10.007,500.005.504,125.00
0009303-01-00400In-Place Cement Stabilized Base Course (12" Thick) 39,274     SQYD16.80659,803.2021.00824,754.00
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 7     CUYD100.00700.00330.002,310.00
0011502-01-00100Asphalt Concrete 15,068.8   TON149.002,245,251.20160.002,411,008.00
0012502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 227.2   TON157.1535,704.48400.0090,880.00
0013509-01-00100Milling Asphalt Pavement 69,377     SQYD6.00416,262.007.00485,639.00
0014509-02-00100Contractor Retained Reclaimed Asphalt Pavement -4,666     CUYD0.10-466.600.01-46.66
0015510-01-00100Pavement Patching (6" Minimum Thickness) 192     SQYD50.009,600.00125.0024,000.00
0016510-02-00100Pavement Widening 12" Thick2,712     SQYD100.00271,200.00170.00461,040.00
0017701-01-02006Cross Drain Pipe (24" RCP/RPVCP/CMP) 53     LNFT172.959,166.35248.0013,144.00
0018701-02-01040Cross Drain Pipe Arch (36" Equiv. RCPA) 132     LNFT280.0036,960.00440.0058,080.00
0019701-02-01120Cross Drain Pipe Arch (60" Equiv. RCPA) 132     LNFT485.0064,020.00550.0072,600.00
0020701-10-01080Reinforced Concrete Pipe (Extension) (30") 152     LNFT176.5026,828.00825.00125,400.00
0021701-12-01060Corrugated Metal Pipe (Extension) (24") 4     LNFT585.002,340.002,200.008,800.00
0022701-15-00100Concrete Collar 20     EACH750.0015,000.003,300.0066,000.00
0023701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 185     LNFT100.0018,500.005.501,017.50
0024704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 518     LNFT175.0090,650.0066.0034,188.00
0025704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 337.5   LNFT38.0012,825.0042.0014,175.00
0026704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH3,900.0015,600.004,300.0017,200.00
0027711-01-03000Riprap (30 lb, 14" Thick) 35     SQYD200.007,000.00220.007,700.00
0028711-04-00100Geotextile Fabric 35     SQYD50.001,750.0022.00770.00
0029713-01-00100Temporary Signs and Barricades 1     LUMP75,000.0075,000.00165,000.00165,000.00
0030713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 10.773 MILE500.005,386.501,000.0010,773.00
0031713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 8.656 MILE500.004,328.00550.004,760.80
0032713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 28.956 MILE500.0014,478.00550.0015,925.80
0033713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 748     EACH20.0014,960.004.002,992.00
0034716-01-00100Mulch (Vegetative) 19.6   TON1,000.0019,600.00935.0018,326.00
0035717-01-00100Seeding 587     LB25.0014,675.0022.0012,914.00
0036718-01-00100Fertilizer 9,787     LB1.1010,765.701.009,787.00
0037722-02-00100Project Site Laboratory (Equipped) 1     EACH25,000.0025,000.0010,000.0010,000.00
0038726-01-00100Bedding Material 143.7   CUYD100.0014,370.00275.0039,517.50
0039727-01-00100Mobilization 1     LUMP75,000.0075,000.00165,000.00165,000.00
0040729-16-00200Object Marker Assembly (Type 2) 22     EACH80.001,760.0088.001,936.00
0041729-16-00300Object Marker Assembly (Type 3) 4     EACH125.00500.00138.00552.00
0042731-02-00100Reflectorized Raised Pavement Markers 1,658     EACH9.0014,922.0010.0016,580.00
0043732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 796     LNFT30.0023,880.0033.0026,268.00
0044732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 14.478 MILE6,300.0091,211.407,000.00101,346.00
0045732-02-02040Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.122 MILE30,000.003,660.0033,000.004,026.00
0046732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.328 MILE4,000.0017,312.004,400.0019,043.20
0047732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 2     EACH750.001,500.00825.001,650.00
0048732-04-15020Plastic Pavement Legends and Symbols (ONLY) 2     EACH750.001,500.00825.001,650.00
0049735-01-00100Mailboxes 7     EACH20.00140.0022.00154.00
0050735-02-00100Mailbox Supports (Single) 7     EACH500.003,500.00550.003,850.00
0051740-01-00100Construction Layout 1     LUMP75,000.0075,000.0070,000.0070,000.00
0052815-03-00300Joint Seal (Poured) 1,302     LNFT20.0026,040.0044.0057,288.00
0053NS-201-00001Tree and Stump Removal (<= 36" Diameter) 20     EACH2,000.0040,000.002,400.0048,000.00
0054NS-500-00340Saw Cutting Asphalt Concrete Pavement 446     INLF2.501,115.003.301,471.80
         
  CONTRACTOR TOTAL   4,708,953.23 5,931,928.94