Proposal:H.015288.6
Parish:Jefferson Davis
Routes:LA 1130
Description:LA 1130: US 190 - LA 26
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,670,214.13
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $1,698,780.73 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $1,772,577.43 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - R. E. Heidt Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 46 | SQYD | 250.00 | 11,500.00 | 40.40 | 1,858.40 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 197 | SQYD | 39.00 | 7,683.00 | 15.50 | 3,053.50 | | 0003 | 202-02-03020 | Removal of Base – (Base Type) 10" Stabilized sand clay gravel | 147 | SQYD | 48.00 | 7,056.00 | 43.00 | 6,321.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 11.8 | SQYD | 30.00 | 354.00 | 126.25 | 1,489.75 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 18.5 | SQYD | 30.00 | 555.00 | 206.04 | 3,811.74 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 130 | LNFT | 25.00 | 3,250.00 | 70.70 | 9,191.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 24" round rcp | 5 | LNFT | 25.00 | 125.00 | 70.70 | 353.50 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 30" CPP PIPE EXTENSION | 7.7 | LNFT | 25.00 | 192.50 | 70.70 | 544.39 | | 0009 | 202-02-36000 | Removal of Railroad Grade Crossing | 1 | EACH | 12,000.00 | 12,000.00 | 6,100.00 | 6,100.00 | | 0010 | 203-01-00100 | General Excavation | 47 | CUYD | 45.00 | 2,115.00 | 85.85 | 4,034.95 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 239 | CUYD | 75.00 | 17,925.00 | 101.00 | 24,139.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 34 | EACH | 30.00 | 1,020.00 | 25.25 | 858.50 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 300.00 | 3,000.00 | 252.50 | 2,525.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 940 | LNFT | 1.00 | 940.00 | 4.80 | 4,512.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 4,036.5 | TON | 121.00 | 488,416.50 | 119.00 | 480,343.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 557.3 | TON | 160.00 | 89,168.00 | 150.00 | 83,595.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 21,430 | SQYD | 4.00 | 85,720.00 | 4.75 | 101,792.50 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,188 | CUYD | 0.01 | -11.88 | 0.01 | -11.88 | | 0019 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) INCLUDES PATCH AT ABANDONDED RAILROAD | 897.7 | SQYD | 200.00 | 179,540.00 | 145.00 | 130,166.50 | | 0020 | 510-02-00100 | Pavement Widening 3.5" Minimum Thickness | 56 | SQYD | 162.00 | 9,072.00 | 312.00 | 17,472.00 | | 0021 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 24 | LNFT | 275.00 | 6,600.00 | 176.75 | 4,242.00 | | 0022 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 12 | LNFT | 350.00 | 4,200.00 | 277.75 | 3,333.00 | | 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 280 | LNFT | 350.00 | 98,000.00 | 202.00 | 56,560.00 | | 0024 | 701-05-01051 | Side Drain Pipe (18" RCP) | 8 | LNFT | 275.00 | 2,200.00 | 176.75 | 1,414.00 | | 0025 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 80 | LNFT | 350.00 | 28,000.00 | 202.00 | 16,160.00 | | 0026 | 701-07-00100 | Yard Drain Pipe (4") | 8 | LNFT | 45.00 | 360.00 | 60.60 | 484.80 | | 0027 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,000.00 | 6,000.00 | 1,903.85 | 3,807.70 | | 0028 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 8,000.00 | 32,000.00 | 6,312.50 | 25,250.00 | | 0029 | 702-03-01100 | Catch Basins (CB-SD02) | 1 | EACH | 9,000.00 | 9,000.00 | 9,898.00 | 9,898.00 | | 0030 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 1,200.00 | 2,400.00 | 875.00 | 1,750.00 | | 0031 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 9,000.00 | 9,000.00 | 11,817.00 | 11,817.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 650 | LNFT | 60.00 | 39,000.00 | 505.00 | 328,250.00 | | 0033 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 43 | LNFT | 90.00 | 3,870.00 | 75.75 | 3,257.25 | | 0034 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 5,750.00 | 23,000.00 | 4,696.50 | 18,786.00 | | 0035 | 706-01-00100 | Concrete Walk (4" Thick) | 11.7 | SQYD | 285.00 | 3,334.50 | 202.00 | 2,363.40 | | 0036 | 707-01-00100 | Concrete Curb | 108 | LNFT | 50.00 | 5,400.00 | 37.80 | 4,082.40 | | 0037 | 710-01-00100 | Flowable Fill | 42 | CUYD | 275.00 | 11,550.00 | 409.05 | 17,180.10 | | 0038 | 710-01-00110 | Flowable Fill (Excavatable) | 1.7 | CUYD | 275.00 | 467.50 | 3,535.00 | 6,009.50 | | 0039 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 11 | SQYD | 185.00 | 2,035.00 | 267.65 | 2,944.15 | | 0040 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 80 | LNFT | 0.50 | 40.00 | 0.51 | 40.80 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.982 | MILE | 5,500.00 | 16,401.00 | 950.00 | 2,832.90 | | 0042 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.838 | MILE | 1.00 | 2.84 | 505.00 | 1,433.19 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.266 | MILE | 1.00 | 7.27 | 909.00 | 6,604.79 | | 0044 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 1.00 | 2.00 | 101.00 | 202.00 | | 0045 | 726-01-00100 | Bedding Material | 48.2 | CUYD | 185.00 | 8,917.00 | 202.00 | 9,736.40 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 160.00 | 1,280.00 | 131.30 | 1,050.40 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 206 | EACH | 11.00 | 2,266.00 | 9.09 | 1,872.54 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 18.00 | 720.00 | 15.15 | 606.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.633 | MILE | 6,500.00 | 23,614.50 | 5,555.00 | 20,181.32 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.419 | MILE | 3,000.00 | 4,257.00 | 2,525.00 | 3,582.98 | | 0051 | 735-01-00100 | Mailboxes | 11 | EACH | 10.00 | 110.00 | 1.01 | 11.11 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 550.00 | 4,950.00 | 479.75 | 4,317.75 | | 0053 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 650.00 | 650.00 | 505.00 | 505.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 0.3 | ACRE | 10,000.00 | 3,000.00 | 9,595.00 | 2,878.50 | | 0055 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 750 | TON | 121.00 | 90,750.00 | 116.00 | 87,000.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,592 | INLF | 3.00 | 7,776.00 | 0.55 | 1,425.60 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 160,000.00 | 160,000.00 | 20,856.50 | 20,856.50 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 185,000.00 | 185,000.00 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 2,500.00 | 2,500.00 | | 0060 | 203-01-00100 | General Excavation (HYDRO-EXCAVATION, MANUAL EXCAVATION, OR OTHER METHOD APPROVED BY PROJECT ENGINEER) | 5 | CUYD | 400.00 | 2,000.00 | 4,040.00 | 20,200.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,698,780.73 | | 1,772,577.43 |
|