Proposal:H.014115.6
Parish:St. Helena
Routes:LA 448
Description:LA 448: LA 37 - LA 10
Type Construction:BORROW, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,474,913.00
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $3,442,434.39 |
| 2 | 12031 | R.J. Daigle & Sons Contractors, Inc | $3,615,783.18 |
| 3 | 06276 | Barriere Construction Co., LLC | $3,689,919.17 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $3,747,703.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - R.J. Daigle & Sons Contractors, Inc | - 3 - Barriere Construction Co., LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-04560 | Removal of Bridge Joint Four bridge locations | 784 | LNFT | 11.00 | 8,624.00 | 4.68 | 3,669.12 | 11.50 | 9,016.00 | 10.00 | 7,840.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,899 | LNFT | 6.00 | 11,394.00 | 6.60 | 12,533.40 | 6.25 | 11,868.75 | 7.00 | 13,293.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 32 | EACH | 35.00 | 1,120.00 | 38.50 | 1,232.00 | 36.00 | 1,152.00 | 36.00 | 1,152.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,272.8 | CUYD | 94.00 | 119,643.20 | 115.50 | 147,008.40 | 80.00 | 101,824.00 | 60.00 | 76,368.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 6,070 | LNFT | 1.96 | 11,897.20 | 2.20 | 13,354.00 | 2.00 | 12,140.00 | 2.00 | 12,140.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 18 | CUYD | 125.00 | 2,250.00 | 301.21 | 5,421.78 | 100.00 | 1,800.00 | 200.00 | 3,600.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 20,041.4 | TON | 94.00 | 1,883,891.60 | 111.00 | 2,224,595.40 | 116.00 | 2,324,802.40 | 112.00 | 2,244,636.80 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,272.8 | TON | 50.00 | 63,640.00 | 137.26 | 174,704.53 | 215.00 | 273,652.00 | 210.00 | 267,288.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 96,062 | SQYD | 2.00 | 192,124.00 | 2.75 | 264,170.50 | 2.25 | 216,139.50 | 3.00 | 288,186.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,368 | CUYD | 0.01 | -53.68 | 0.01 | -53.68 | 0.01 | -53.68 | 0.00 | 0.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,015 | SQYD | 118.00 | 119,770.00 | 100.00 | 101,500.00 | 106.00 | 107,590.00 | 120.00 | 121,800.00 | | 0012 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 850 | LNFT | 28.50 | 24,225.00 | 31.35 | 26,647.50 | 29.00 | 24,650.00 | 30.00 | 25,500.00 | | 0013 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 336 | LNFT | 40.00 | 13,440.00 | 44.00 | 14,784.00 | 41.00 | 13,776.00 | 42.00 | 14,112.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 112.50 | 45,000.00 | 123.75 | 49,500.00 | 115.00 | 46,000.00 | 118.00 | 47,200.00 | | 0015 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,400.00 | 13,600.00 | 3,740.00 | 14,960.00 | 3,500.00 | 14,000.00 | 3,500.00 | 14,000.00 | | 0016 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 3,050.00 | 36,600.00 | 3,355.00 | 40,260.00 | 3,150.00 | 37,800.00 | 3,200.00 | 38,400.00 | | 0017 | 707-04-00100 | Asphalt Curb | 216 | LNFT | 175.00 | 37,800.00 | 38.45 | 8,305.20 | 125.00 | 27,000.00 | 45.00 | 9,720.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 350,000.00 | 350,000.00 | 126,000.00 | 126,000.00 | 160,000.00 | 160,000.00 | 130,000.00 | 130,000.00 | | 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 0.50 | 36.00 | 0.55 | 39.60 | 1.00 | 72.00 | 1.00 | 72.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.7 | MILE | 350.00 | 8,995.00 | 79.44 | 2,041.61 | 330.00 | 8,481.00 | 250.00 | 6,425.00 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 20.7 | MILE | 500.00 | 10,350.00 | 550.00 | 11,385.00 | 1.00 | 20.70 | 500.00 | 10,350.00 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 71.5 | MILE | 500.00 | 35,750.00 | 550.00 | 39,325.00 | 1.00 | 71.50 | 500.00 | 35,750.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 172,000.00 | 172,000.00 | 143,000.00 | 143,000.00 | 210,000.00 | 210,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 85.00 | 1,360.00 | 93.50 | 1,496.00 | 88.00 | 1,408.00 | 89.00 | 1,424.00 | | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 25.00 | 600.00 | 27.50 | 660.00 | 26.00 | 624.00 | 26.00 | 624.00 | | 0026 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 473 | LNFT | 1.00 | 473.00 | 1.10 | 520.30 | 1.00 | 473.00 | 1.00 | 473.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.8 | MILE | 4,000.00 | 95,200.00 | 4,510.00 | 107,338.00 | 4,250.00 | 101,150.00 | 4,200.00 | 99,960.00 | | 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7 | MILE | 1,000.00 | 7,000.00 | 1,320.00 | 9,240.00 | 1,250.00 | 8,750.00 | 1,250.00 | 8,750.00 | | 0029 | 735-01-00100 | Mailboxes | 56 | EACH | 20.00 | 1,120.00 | 23.10 | 1,293.60 | 21.00 | 1,176.00 | 20.00 | 1,120.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 56 | EACH | 250.00 | 14,000.00 | 220.00 | 12,320.00 | 255.00 | 14,280.00 | 250.00 | 14,000.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 4.16 | ACRE | 2,582.95 | 10,745.07 | 3,080.00 | 12,812.80 | 2,650.00 | 11,024.00 | 2,300.00 | 9,568.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 13,050.00 | 13,050.00 | 8,000.00 | 8,000.00 | 12,000.00 | 12,000.00 | | 0033 | 815-03-00300 | Joint Seal (Poured) | 784 | LNFT | 10.00 | 7,840.00 | 4.68 | 3,669.12 | 10.50 | 8,232.00 | 28.00 | 21,952.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,442,434.39 | | 3,615,783.18 | | 3,689,919.17 | | 3,747,703.80 |
|