Proposal:H.014082.6
Parish:Caddo
Routes:US 171
Description:US 171: LA 3132 - US 80
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, ROADWAY JOINT REINFORCING MESH, AND RELATED WORK.
Estimated Construction Cost:$7,762,113.45
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $9,619,504.89 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 35.5 | SQYD | 50.00 | 1,775.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 10 | LNFT | 50.00 | 500.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 2,853 | LNFT | 12.00 | 34,236.00 | | 0005 | 202-02-26300 | Removal of Median / Island | 11 | SQYD | 100.00 | 1,100.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 923.8 | CUYD | 30.00 | 27,714.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 3,390 | LNFT | 10.00 | 33,900.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 18,049.8 | TON | 159.15 | 2,872,625.67 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,850.7 | TON | 174.65 | 323,224.76 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 177,493 | SQYD | 10.00 | 1,774,930.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,405 | CUYD | 0.10 | -740.50 | | 0012 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 5,422.9 | SQYD | 100.00 | 542,290.00 | | 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 54,428 | LNFT | 4.25 | 231,319.00 | | 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 36,849 | LNFT | 4.25 | 156,608.25 | | 0015 | 602-03-00100 | Cleaning and Sealing Random Cracks | 18,255 | LNFT | 5.25 | 95,838.75 | | 0016 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 32 | LNFT | 200.00 | 6,400.00 | | 0017 | 701-08-00100 | Relaying Pipe 18" X 8' RCP | 48 | LNFT | 250.00 | 12,000.00 | | 0018 | 701-15-00100 | Concrete Collar | 10 | EACH | 750.00 | 7,500.00 | | 0019 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 32 | LNFT | 200.00 | 6,400.00 | | 0020 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 4,500.00 | 9,000.00 | | 0021 | 702-04-00100 | Adjusting Manholes | 13 | EACH | 1,000.00 | 13,000.00 | | 0022 | 702-04-00200 | Adjusting Catch Basins | 28 | EACH | 4,500.00 | 126,000.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,597.4 | LNFT | 38.00 | 60,701.20 | | 0024 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 9.9 | LNFT | 168.00 | 1,663.20 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 375 | LNFT | 125.00 | 46,875.00 | | 0026 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 9 | EACH | 3,900.00 | 35,100.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 3,900.00 | 23,400.00 | | 0028 | 706-01-00100 | Concrete Walk (4" Thick) | 46.5 | SQYD | 100.00 | 4,650.00 | | 0029 | 706-04-00110 | Curb Ramps Type 2 | 93.6 | SQYD | 96.25 | 9,009.00 | | 0030 | 706-04-00110 | Curb Ramps Type 3 | 137.7 | SQYD | 123.50 | 17,005.95 | | 0031 | 706-04-00110 | Curb Ramps Type 4 | 17.9 | SQYD | 83.80 | 1,500.02 | | 0032 | 706-04-00110 | Curb Ramps Type 5 | 57.3 | SQYD | 78.55 | 4,500.92 | | 0033 | 706-04-00110 | Curb Ramps Type 6 | 13.7 | SQYD | 109.50 | 1,500.15 | | 0034 | 706-04-00110 | Curb Ramps Type 7 | 864.5 | SQYD | 75.20 | 65,010.40 | | 0035 | 706-04-00110 | Curb Ramps Type 8 | 108.5 | SQYD | 64.55 | 7,003.68 | | 0036 | 706-04-00110 | Curb Ramps Types 1 | 537.6 | SQYD | 78.15 | 42,013.44 | | 0037 | 707-01-00100 | Concrete Curb | 3,745 | LNFT | 15.00 | 56,175.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | | 0039 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,948 | LNFT | 0.25 | 737.00 | | 0040 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 9,648 | LNFT | 0.25 | 2,412.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.48 | MILE | 500.00 | 7,240.00 | | 0042 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.48 | MILE | 500.00 | 7,240.00 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.948 | MILE | 500.00 | 18,474.00 | | 0044 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 84 | EACH | 20.00 | 1,680.00 | | 0045 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 100.00 | 400.00 | | 0046 | 726-01-00100 | Bedding Material | 6.5 | CUYD | 200.00 | 1,300.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | | 0048 | 729-01-00103 | Sign (Type A)(Relocate) | 8 | SQFT | 500.00 | 4,000.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 15 | EACH | 125.00 | 1,875.00 | | 0050 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 672 | EACH | 25.00 | 16,800.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,684 | EACH | 9.00 | 15,156.00 | | 0052 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,868 | LNFT | 5.00 | 14,340.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 4,824 | LNFT | 22.00 | 106,128.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.474 | MILE | 7,000.00 | 129,318.00 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.237 | MILE | 3,000.00 | 27,711.00 | | 0056 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 42 | EACH | 650.00 | 27,300.00 | | 0057 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 51 | EACH | 400.00 | 20,400.00 | | 0058 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 400.00 | 1,600.00 | | 0059 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 2,000.00 | 4,000.00 | | 0060 | 732-05-00100 | Removal of Existing Markings | 0.433 | MILE | 10,000.00 | 4,330.00 | | 0061 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 100.00 | 2,000.00 | | 0062 | 736-09-00100 | Loop Detector | 626 | LNFT | 100.00 | 62,600.00 | | 0063 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 100.00 | 2,000.00 | | 0064 | 737-05-00002 | Painted Curbs | 2,213 | LNFT | 15.00 | 33,195.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | | 0066 | 741-35-00100 | Adjust Valve or Meter Box | 10 | EACH | 1,000.00 | 10,000.00 | | 0067 | NS-500-00160 | Roadway Joint Reinforcing Mesh (Detail Repair System) | 91,277 | LNFT | 20.00 | 1,825,540.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,619,504.89 |
|