Proposal:H.008230.6
Parish:Ouachita
Routes:LA 838
Description:LA 838: STEEP BAYOU BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, TEMPORARY DETOUR BRIDGE, REMOVAL OF TIMBER BRIDGE, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, CONCRETE APPROACH SLABS, AND RELATED WORK.
Estimated Construction Cost:$4,347,436.66
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $3,289,114.70 |
| 2 | 49239 | WL Bass Construction Inc. | $3,390,838.80 |
| 3 | 55950 | Brown Industrial Construction, LLC | $3,958,978.95 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $4,393,641.35 |
| 5 | 39613 | BAKER PILE DRIVING AND SITE WORK LLC | $4,464,847.07 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $4,728,050.00 |
| 7 | 55519 | Key, LLC Of Mississippi | $5,361,139.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - WL Bass Construction Inc. | - 3 - Brown Industrial Construction, LLC | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.88 | LUMP | 135,000.00 | 135,000.00 | 70,000.00 | 70,000.00 | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 238.6 | SQYD | 20.00 | 4,772.00 | 7.00 | 1,670.20 | 6.00 | 1,431.60 | 30.00 | 7,158.00 | | 0004 | 202-02-04501 | Removal of Bridge 78' X 26.4' Timber Bridge | 2,060 | LUMP | 35,000.00 | 35,000.00 | 48,000.00 | 48,000.00 | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 263.8 | SQYD | 20.00 | 5,276.00 | 9.00 | 2,374.20 | 6.00 | 1,582.80 | 29.00 | 7,650.20 | | 0006 | 202-02-14500 | Removal of Guard Rail | 250 | LNFT | 13.00 | 3,250.00 | 9.00 | 2,250.00 | 6.00 | 1,500.00 | 29.00 | 7,250.00 | | 0007 | 203-01-00100 | General Excavation (Mainline Excavation and Detour Undercutting) | 1,949 | CUYD | 20.00 | 38,980.00 | 7.00 | 13,643.00 | 10.00 | 19,490.00 | 24.00 | 46,776.00 | | 0008 | 203-02-00100 | Drainage Excavation | 942 | CUYD | 26.00 | 24,492.00 | 19.00 | 17,898.00 | 15.00 | 14,130.00 | 45.00 | 42,390.00 | | 0009 | 203-03-00100 | Embankment (Mainline Embankment and Detour Backfill) | 2,691 | CUYD | 31.00 | 83,421.00 | 37.00 | 99,567.00 | 20.00 | 53,820.00 | 50.00 | 134,550.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 34 | EACH | 227.00 | 7,718.00 | 150.00 | 5,100.00 | 150.00 | 5,100.00 | 150.00 | 5,100.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,319 | LNFT | 4.00 | 9,276.00 | 3.00 | 6,957.00 | 2.50 | 5,797.50 | 2.55 | 5,913.45 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 344 | CUYD | 110.00 | 37,840.00 | 110.00 | 37,840.00 | 85.00 | 29,240.00 | 70.00 | 24,080.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 225.00 | 5,625.00 | 140.00 | 3,500.00 | 85.00 | 2,125.00 | 150.00 | 3,750.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 309.6 | TON | 225.00 | 69,660.00 | 225.00 | 69,660.00 | 225.00 | 69,660.00 | 340.00 | 105,264.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 203.6 | TON | 245.00 | 49,882.00 | 245.00 | 49,882.00 | 265.00 | 53,954.00 | 238.00 | 48,456.80 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 1,318 | SQYD | 19.00 | 25,042.00 | 16.00 | 21,088.00 | 10.00 | 13,180.00 | 14.00 | 18,452.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -73 | CUYD | 1.00 | -73.00 | 0.10 | -7.30 | 0.01 | -0.73 | 1.00 | -73.00 | | 0018 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 82 | SQYD | 270.00 | 22,140.00 | 300.00 | 24,600.00 | 220.00 | 18,040.00 | 240.00 | 19,680.00 | | 0019 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 65 | LNFT | 125.00 | 8,125.00 | 150.00 | 9,750.00 | 80.00 | 5,200.00 | 300.00 | 19,500.00 | | 0020 | 701-05-01066 | Side Drain Pipe (24" RCP) | 77 | LNFT | 150.00 | 11,550.00 | 220.00 | 16,940.00 | 175.00 | 13,475.00 | 300.00 | 23,100.00 | | 0021 | 702-08-00100 | Side Drain Safety End (Type 1) | 6 | EACH | 3,300.00 | 19,800.00 | 3,200.00 | 19,200.00 | 2,800.00 | 16,800.00 | 4,100.00 | 24,600.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 281.3 | LNFT | 34.00 | 9,564.20 | 30.00 | 8,439.00 | 34.00 | 9,564.20 | 35.00 | 9,845.50 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.00 | 13,500.00 | 125.00 | 12,500.00 | 135.00 | 13,500.00 | 135.00 | 13,500.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,850.00 | 15,400.00 | 3,250.00 | 13,000.00 | 4,150.00 | 16,600.00 | 3,900.00 | 15,600.00 | | 0025 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 850.00 | 6,800.00 | 250.00 | 2,000.00 | 600.00 | 4,800.00 | 600.00 | 4,800.00 | | 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 250.00 | 2,000.00 | 250.00 | 2,000.00 | 200.00 | 1,600.00 | 200.00 | 1,600.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 986 | SQYD | 95.00 | 93,670.00 | 105.00 | 103,530.00 | 95.00 | 93,670.00 | 110.00 | 108,460.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 986 | SQYD | 4.00 | 3,944.00 | 4.00 | 3,944.00 | 3.00 | 2,958.00 | 1.00 | 986.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 41,000.00 | 41,000.00 | 35,000.00 | 35,000.00 | 44,526.00 | 44,526.00 | 115,000.00 | 115,000.00 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.102 | MILE | 53,000.00 | 5,406.00 | 350.00 | 35.70 | 1,201.00 | 122.50 | 1,200.00 | 122.40 | | 0031 | 725-01-00100 | Temporary Detour Roads | 3,953.2 | SQYD | 145.00 | 573,214.00 | 170.00 | 672,044.00 | 141.00 | 557,401.20 | 180.00 | 711,576.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 339,000.00 | 339,000.00 | 395,902.00 | 395,902.00 | 435,000.00 | 435,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 130.00 | 520.00 | 85.00 | 340.00 | 125.00 | 500.00 | 135.00 | 540.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 37 | EACH | 9.00 | 333.00 | 8.50 | 314.50 | 8.50 | 314.50 | 22.00 | 814.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.545 | MILE | 3,900.00 | 2,125.50 | 3,900.00 | 2,125.50 | 3,864.00 | 2,105.88 | 8,000.00 | 4,360.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.15 | MILE | 3,500.00 | 525.00 | 3,500.00 | 525.00 | 3,500.00 | 525.00 | 15,000.00 | 2,250.00 | | 0037 | 735-01-00100 | Mailboxes | 6 | EACH | 390.00 | 2,340.00 | 22.00 | 132.00 | 22.00 | 132.00 | 10.00 | 60.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 390.00 | 2,340.00 | 225.00 | 1,350.00 | 225.00 | 1,350.00 | 500.00 | 3,000.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 2.88 | ACRE | 3,750.00 | 10,800.00 | 2,800.00 | 8,064.00 | 2,800.00 | 8,064.00 | 3,500.00 | 10,080.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 32,000.00 | 32,000.00 | 64,000.00 | 64,000.00 | 50,993.00 | 50,993.00 | 80,000.00 | 80,000.00 | | 0041 | 804-01-00400 | Precast Concrete Piles (18") | 1,440 | LNFT | 160.00 | 230,400.00 | 218.50 | 314,640.00 | 250.00 | 360,000.00 | 320.00 | 460,800.00 | | 0042 | 804-14-00100 | Dynamic Monitoring Assistance | 3 | EACH | 3,000.00 | 9,000.00 | 1,500.00 | 4,500.00 | 4,818.00 | 14,454.00 | 4,500.00 | 13,500.00 | | 0043 | 805-01-00100 | Class A1 Concrete (Slab Span) | 157.69 | CUYD | 2,000.00 | 315,380.00 | 350.00 | 55,191.50 | 2,000.00 | 315,380.00 | 2,100.00 | 331,149.00 | | 0044 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 48.67 | CUYD | 2,900.00 | 141,143.00 | 350.00 | 17,034.50 | 4,000.00 | 194,680.00 | 4,200.00 | 204,414.00 | | 0045 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,383 | SQFT | 3.00 | 4,149.00 | 2.00 | 2,766.00 | 2.25 | 3,111.75 | 4.00 | 5,532.00 | | 0046 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,383 | SQFT | 3.00 | 4,149.00 | 1.00 | 1,383.00 | 3.25 | 4,494.75 | 4.00 | 5,532.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel | 42,448 | LB | 1.50 | 63,672.00 | 3.00 | 127,344.00 | 1.75 | 74,284.00 | 2.00 | 84,896.00 | | 0048 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 200 | LNFT | 190.00 | 38,000.00 | 200.00 | 40,000.00 | 350.00 | 70,000.00 | 310.00 | 62,000.00 | | 0049 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 90.00 | 230,400.00 | 150.00 | 384,000.00 | 175.00 | 448,000.00 | 145.00 | 371,200.00 | | 0050 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 256 | SFIN | 130.00 | 33,280.00 | 70.00 | 17,920.00 | 62.00 | 15,872.00 | 65.00 | 16,640.00 | | 0051 | 815-03-00300 | Joint Seal (Poured) | 192 | LNFT | 22.00 | 4,224.00 | 15.00 | 2,880.00 | 33.00 | 6,336.00 | 18.00 | 3,456.00 | | 0052 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 1,954 | SQFT | 266.00 | 519,764.00 | 320.00 | 625,280.00 | 350.00 | 683,900.00 | 280.00 | 547,120.00 | | 0054 | NS-203-00007 | Temporary Sheeting and Bracing | 1 | LUMP | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 1.00 | 1.00 | 9,000.00 | 9,000.00 | | 0055 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 25.00 | 4,800.00 | 10.00 | 1,920.00 | 26.00 | 4,992.00 | 12.00 | 2,304.00 | | 0056 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 256 | LNFT | 10.00 | 2,560.00 | 1.00 | 256.00 | 1.50 | 384.00 | 12.00 | 3,072.00 | | 0057 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,468 | INLF | 2.00 | 2,936.00 | 1.00 | 1,468.00 | 2.00 | 2,936.00 | 1.25 | 1,835.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,289,114.70 | | 3,390,838.80 | | 3,958,978.95 | | 4,393,641.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - BAKER PILE DRIVING AND SITE WORK LLC | - 6 - JB JAMES CONSTRUCTION LLC | - 7 - Key, LLC Of Mississippi | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.88 | LUMP | 55,963.90 | 55,963.90 | 400,000.00 | 400,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,341.14 | 8,341.14 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 238.6 | SQYD | 10.45 | 2,493.37 | 20.00 | 4,772.00 | 31.00 | 7,396.60 | | 0004 | 202-02-04501 | Removal of Bridge 78' X 26.4' Timber Bridge | 2,060 | LUMP | 39,212.79 | 39,212.79 | 300,000.00 | 300,000.00 | 90,000.00 | 90,000.00 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 263.8 | SQYD | 12.00 | 3,165.60 | 15.00 | 3,957.00 | 56.00 | 14,772.80 | | 0006 | 202-02-14500 | Removal of Guard Rail | 250 | LNFT | 13.06 | 3,265.00 | 14.00 | 3,500.00 | 13.00 | 3,250.00 | | 0007 | 203-01-00100 | General Excavation (Mainline Excavation and Detour Undercutting) | 1,949 | CUYD | 20.49 | 39,935.01 | 20.00 | 38,980.00 | 65.00 | 126,685.00 | | 0008 | 203-02-00100 | Drainage Excavation | 942 | CUYD | 20.31 | 19,132.02 | 25.00 | 23,550.00 | 65.00 | 61,230.00 | | 0009 | 203-03-00100 | Embankment (Mainline Embankment and Detour Backfill) | 2,691 | CUYD | 57.37 | 154,382.67 | 40.00 | 107,640.00 | 65.00 | 174,915.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 34 | EACH | 233.77 | 7,948.18 | 150.00 | 5,100.00 | 154.00 | 5,236.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,319 | LNFT | 4.70 | 10,899.30 | 5.00 | 11,595.00 | 3.00 | 6,957.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 344 | CUYD | 97.88 | 33,670.72 | 50.00 | 17,200.00 | 80.00 | 27,520.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 138.68 | 3,467.00 | 250.00 | 6,250.00 | 80.00 | 2,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 309.6 | TON | 474.00 | 146,750.40 | 225.00 | 69,660.00 | 465.00 | 143,964.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 203.6 | TON | 520.00 | 105,872.00 | 265.00 | 53,954.00 | 465.00 | 94,674.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 1,318 | SQYD | 21.37 | 28,165.66 | 10.00 | 13,180.00 | 30.00 | 39,540.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -73 | CUYD | 0.01 | -0.73 | 1.00 | -73.00 | 1.00 | -73.00 | | 0018 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 82 | SQYD | 477.85 | 39,183.70 | 250.00 | 20,500.00 | 465.00 | 38,130.00 | | 0019 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 65 | LNFT | 102.78 | 6,680.70 | 150.00 | 9,750.00 | 147.00 | 9,555.00 | | 0020 | 701-05-01066 | Side Drain Pipe (24" RCP) | 77 | LNFT | 244.48 | 18,824.96 | 160.00 | 12,320.00 | 161.00 | 12,397.00 | | 0021 | 702-08-00100 | Side Drain Safety End (Type 1) | 6 | EACH | 3,341.49 | 20,048.94 | 4,000.00 | 24,000.00 | 3,000.00 | 18,000.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 281.3 | LNFT | 38.00 | 10,689.40 | 30.00 | 8,439.00 | 31.00 | 8,720.30 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 104.50 | 10,450.00 | 125.00 | 12,500.00 | 128.00 | 12,800.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,180.00 | 16,720.00 | 3,250.00 | 13,000.00 | 3,317.00 | 13,268.00 | | 0025 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 418.00 | 3,344.00 | 600.00 | 4,800.00 | 613.00 | 4,904.00 | | 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 418.00 | 3,344.00 | 200.00 | 1,600.00 | 205.00 | 1,640.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 986 | SQYD | 103.07 | 101,627.02 | 130.00 | 128,180.00 | 154.00 | 151,844.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 986 | SQYD | 3.77 | 3,717.22 | 2.00 | 1,972.00 | 6.00 | 5,916.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 57,475.00 | 57,475.00 | 75,000.00 | 75,000.00 | 30,000.00 | 30,000.00 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.102 | MILE | 37,120.00 | 3,786.24 | 1,000.00 | 102.00 | 1,200.00 | 122.40 | | 0031 | 725-01-00100 | Temporary Detour Roads | 3,953.2 | SQYD | 170.15 | 672,636.98 | 160.00 | 632,512.00 | 224.00 | 885,516.80 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 449,350.00 | 449,350.00 | 470,000.00 | 470,000.00 | 400,000.00 | 400,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 261.25 | 1,045.00 | 85.00 | 340.00 | 87.00 | 348.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 37 | EACH | 29.37 | 1,086.69 | 9.00 | 333.00 | 9.00 | 333.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.545 | MILE | 10,720.00 | 5,842.40 | 4,000.00 | 2,180.00 | 3,980.00 | 2,169.10 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.15 | MILE | 20,900.00 | 3,135.00 | 3,500.00 | 525.00 | 3,572.00 | 535.80 | | 0037 | 735-01-00100 | Mailboxes | 6 | EACH | 20.90 | 125.40 | 22.00 | 132.00 | 22.00 | 132.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 261.25 | 1,567.50 | 225.00 | 1,350.00 | 230.00 | 1,380.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 2.88 | ACRE | 3,433.00 | 9,887.04 | 2,800.00 | 8,064.00 | 2,858.00 | 8,231.04 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 95,247.16 | 95,247.16 | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | | 0041 | 804-01-00400 | Precast Concrete Piles (18") | 1,440 | LNFT | 223.78 | 322,243.20 | 500.00 | 720,000.00 | 260.00 | 374,400.00 | | 0042 | 804-14-00100 | Dynamic Monitoring Assistance | 3 | EACH | 9,487.29 | 28,461.87 | 1,000.00 | 3,000.00 | 10,000.00 | 30,000.00 | | 0043 | 805-01-00100 | Class A1 Concrete (Slab Span) | 157.69 | CUYD | 2,077.00 | 327,522.13 | 2,000.00 | 315,380.00 | 1,850.00 | 291,726.50 | | 0044 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 48.67 | CUYD | 4,532.00 | 220,572.44 | 3,600.00 | 175,212.00 | 1,850.00 | 90,039.50 | | 0045 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,383 | SQFT | 8.58 | 11,866.14 | 1.00 | 1,383.00 | 6.00 | 8,298.00 | | 0046 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,383 | SQFT | 6.89 | 9,528.87 | 5.00 | 6,915.00 | 6.00 | 8,298.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel | 42,448 | LB | 1.41 | 59,851.68 | 2.00 | 84,896.00 | 3.00 | 127,344.00 | | 0048 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 200 | LNFT | 348.34 | 69,668.00 | 200.00 | 40,000.00 | 296.00 | 59,200.00 | | 0049 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 123.27 | 315,571.20 | 120.00 | 307,200.00 | 126.00 | 322,560.00 | | 0050 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 256 | SFIN | 57.73 | 14,778.88 | 60.00 | 15,360.00 | 80.00 | 20,480.00 | | 0051 | 815-03-00300 | Joint Seal (Poured) | 192 | LNFT | 38.15 | 7,324.80 | 30.00 | 5,760.00 | 46.00 | 8,832.00 | | 0052 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 1,954 | SQFT | 417.28 | 815,365.12 | 250.00 | 488,500.00 | 750.00 | 1,465,500.00 | | 0054 | NS-203-00007 | Temporary Sheeting and Bracing | 1 | LUMP | 57,475.00 | 57,475.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | | 0055 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 7.59 | 1,457.28 | 5.00 | 960.00 | 5.00 | 960.00 | | 0056 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 256 | LNFT | 3.38 | 865.28 | 5.00 | 1,280.00 | 5.00 | 1,280.00 | | 0057 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,468 | INLF | 2.60 | 3,816.80 | 5.00 | 7,340.00 | 9.00 | 13,212.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,464,847.07 | | 4,728,050.00 | | 5,361,139.84 |
|