Bid Tabulations for the Letting of 4/9/2025 LA DOTD Headquarters

Proposal:H.008230.6
Parish:Ouachita
Routes:LA 838
Description:LA 838: STEEP BAYOU BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, TEMPORARY DETOUR BRIDGE, REMOVAL OF TIMBER BRIDGE, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, CONCRETE APPROACH SLABS, AND RELATED WORK.
Estimated Construction Cost:$4,347,436.66
Rank License BidderConstruction Bid
114788Louisiana Bridge, Inc.$3,289,114.70
249239WL Bass Construction Inc.$3,390,838.80
355950Brown Industrial Construction, LLC$3,958,978.95
412487Diamond B Construction Co., L.L.C.$4,393,641.35
539613BAKER PILE DRIVING AND SITE WORK LLC$4,464,847.07
639462JB JAMES CONSTRUCTION LLC$4,728,050.00
755519Key, LLC Of Mississippi$5,361,139.84


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Louisiana Bridge, Inc.
- 2 -
WL Bass Construction Inc.
- 3 -
Brown Industrial Construction, LLC
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2.88  LUMP135,000.00135,000.0070,000.0070,000.00125,000.00125,000.00150,000.00150,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP20,000.0020,000.001,000.001,000.006,000.006,000.0015,000.0015,000.00
0003202-02-03030Removal of Pavement Structure 238.6   SQYD20.004,772.007.001,670.206.001,431.6030.007,158.00
0004202-02-04501Removal of Bridge 78' X 26.4' Timber Bridge2,060     LUMP35,000.0035,000.0048,000.0048,000.00100,000.00100,000.0045,000.0045,000.00
0005202-02-06102Removal of Incidental Concrete Paving 263.8   SQYD20.005,276.009.002,374.206.001,582.8029.007,650.20
0006202-02-14500Removal of Guard Rail 250     LNFT13.003,250.009.002,250.006.001,500.0029.007,250.00
0007203-01-00100General Excavation (Mainline Excavation and Detour Undercutting)1,949     CUYD20.0038,980.007.0013,643.0010.0019,490.0024.0046,776.00
0008203-02-00100Drainage Excavation 942     CUYD26.0024,492.0019.0017,898.0015.0014,130.0045.0042,390.00
0009203-03-00100Embankment (Mainline Embankment and Detour Backfill)2,691     CUYD31.0083,421.0037.0099,567.0020.0053,820.0050.00134,550.00
0010204-05-00100Temporary Sediment Check Dams (Hay) 34     EACH227.007,718.00150.005,100.00150.005,100.00150.005,100.00
0011204-06-00100Temporary Silt Fencing 2,319     LNFT4.009,276.003.006,957.002.505,797.502.555,913.45
0012401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 344     CUYD110.0037,840.00110.0037,840.0085.0029,240.0070.0024,080.00
0013402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 25     CUYD225.005,625.00140.003,500.0085.002,125.00150.003,750.00
0014502-01-00100Asphalt Concrete 309.6   TON225.0069,660.00225.0069,660.00225.0069,660.00340.00105,264.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 203.6   TON245.0049,882.00245.0049,882.00265.0053,954.00238.0048,456.80
0016509-01-00100Milling Asphalt Pavement 1,318     SQYD19.0025,042.0016.0021,088.0010.0013,180.0014.0018,452.00
0017509-02-00100Contractor Retained Reclaimed Asphalt Pavement -73     CUYD1.00-73.000.10-7.300.01-0.731.00-73.00
0018510-01-00250Pavement Patching (14 inch Minimum Thickness) 82     SQYD270.0022,140.00300.0024,600.00220.0018,040.00240.0019,680.00
0019701-05-01046Side Drain Pipe (18" RCP/RPVCP) 65     LNFT125.008,125.00150.009,750.0080.005,200.00300.0019,500.00
0020701-05-01066Side Drain Pipe (24" RCP) 77     LNFT150.0011,550.00220.0016,940.00175.0013,475.00300.0023,100.00
0021702-08-00100Side Drain Safety End (Type 1) 6     EACH3,300.0019,800.003,200.0019,200.002,800.0016,800.004,100.0024,600.00
0022704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 281.3   LNFT34.009,564.2030.008,439.0034.009,564.2035.009,845.50
0023704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT135.0013,500.00125.0012,500.00135.0013,500.00135.0013,500.00
0024704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH3,850.0015,400.003,250.0013,000.004,150.0016,600.003,900.0015,600.00
0025708-01-00100Right-of-Way Monument 8     EACH850.006,800.00250.002,000.00600.004,800.00600.004,800.00
0026708-02-00100Right-of-Way Monument Witness Post 8     EACH250.002,000.00250.002,000.00200.001,600.00200.001,600.00
0027711-01-04000Riprap (55 lb, 18" Thick) 986     SQYD95.0093,670.00105.00103,530.0095.0093,670.00110.00108,460.00
0028711-04-00100Geotextile Fabric 986     SQYD4.003,944.004.003,944.003.002,958.001.00986.00
0029713-01-00100Temporary Signs and Barricades 1     LUMP41,000.0041,000.0035,000.0035,000.0044,526.0044,526.00115,000.00115,000.00
0030724-02-00100Rumble Strips (Shoulder/Edge) 0.102 MILE53,000.005,406.00350.0035.701,201.00122.501,200.00122.40
0031725-01-00100Temporary Detour Roads 3,953.2   SQYD145.00573,214.00170.00672,044.00141.00557,401.20180.00711,576.00
0032727-01-00100Mobilization 1     LUMP250,000.00250,000.00339,000.00339,000.00395,902.00395,902.00435,000.00435,000.00
0033729-16-00300Object Marker Assembly (Type 3) 4     EACH130.00520.0085.00340.00125.00500.00135.00540.00
0034731-02-00100Reflectorized Raised Pavement Markers 37     EACH9.00333.008.50314.508.50314.5022.00814.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.545 MILE3,900.002,125.503,900.002,125.503,864.002,105.888,000.004,360.00
0036732-05-00100Removal of Existing Markings 0.15  MILE3,500.00525.003,500.00525.003,500.00525.0015,000.002,250.00
0037735-01-00100Mailboxes 6     EACH390.002,340.0022.00132.0022.00132.0010.0060.00
0038735-02-00100Mailbox Supports (Single) 6     EACH390.002,340.00225.001,350.00225.001,350.00500.003,000.00
0039739-01-00100Hydro-Seeding 2.88  ACRE3,750.0010,800.002,800.008,064.002,800.008,064.003,500.0010,080.00
0040740-01-00100Construction Layout 1     LUMP32,000.0032,000.0064,000.0064,000.0050,993.0050,993.0080,000.0080,000.00
0041804-01-00400Precast Concrete Piles (18") 1,440     LNFT160.00230,400.00218.50314,640.00250.00360,000.00320.00460,800.00
0042804-14-00100Dynamic Monitoring Assistance 3     EACH3,000.009,000.001,500.004,500.004,818.0014,454.004,500.0013,500.00
0043805-01-00100Class A1 Concrete (Slab Span) 157.69  CUYD2,000.00315,380.00350.0055,191.502,000.00315,380.002,100.00331,149.00
0044805-01-00300Class A1 Concrete (Bent Cap) 48.67  CUYD2,900.00141,143.00350.0017,034.504,000.00194,680.004,200.00204,414.00
0045805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,383     SQFT3.004,149.002.002,766.002.253,111.754.005,532.00
0046805-18-00200Concrete Finish (Class 3 Special Finish) 1,383     SQFT3.004,149.001.001,383.003.254,494.754.005,532.00
0047806-01-00100Deformed Reinforcing Steel 42,448     LB1.5063,672.003.00127,344.001.7574,284.002.0084,896.00
0048810-01-00120Concrete Bridge Railing (36 inch Height) 200     LNFT190.0038,000.00200.0040,000.00350.0070,000.00310.0062,000.00
0049813-01-00100Concrete Approach Slabs (Cast-in-Place) 2,560     SQFT90.00230,400.00150.00384,000.00175.00448,000.00145.00371,200.00
0050814-01-00100Elastomeric Bearing Pads (Non-Reinforced) 256     SFIN130.0033,280.0070.0017,920.0062.0015,872.0065.0016,640.00
0051815-03-00300Joint Seal (Poured) 192     LNFT22.004,224.0015.002,880.0033.006,336.0018.003,456.00
0052817-01-00100Temporary Detour Bridge (Concrete) 1,954     SQFT266.00519,764.00320.00625,280.00350.00683,900.00280.00547,120.00
0054NS-203-00007Temporary Sheeting and Bracing 1     LUMP3,000.003,000.005,000.005,000.001.001.009,000.009,000.00
0055NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 192     LNFT25.004,800.0010.001,920.0026.004,992.0012.002,304.00
0056NS-500-00260Sawcuts in Asphalt Concrete Lifts 256     LNFT10.002,560.001.00256.001.50384.0012.003,072.00
0057NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,468     INLF2.002,936.001.001,468.002.002,936.001.251,835.00
             
  CONTRACTOR TOTAL   3,289,114.70 3,390,838.80 3,958,978.95 4,393,641.35



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
BAKER PILE DRIVING AND SITE WORK LLC
- 6 -
JB JAMES CONSTRUCTION LLC
- 7 -
Key, LLC Of Mississippi
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2.88  LUMP55,963.9055,963.90400,000.00400,000.0035,000.0035,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP8,341.148,341.1410,000.0010,000.0020,000.0020,000.00
0003202-02-03030Removal of Pavement Structure 238.6   SQYD10.452,493.3720.004,772.0031.007,396.60
0004202-02-04501Removal of Bridge 78' X 26.4' Timber Bridge2,060     LUMP39,212.7939,212.79300,000.00300,000.0090,000.0090,000.00
0005202-02-06102Removal of Incidental Concrete Paving 263.8   SQYD12.003,165.6015.003,957.0056.0014,772.80
0006202-02-14500Removal of Guard Rail 250     LNFT13.063,265.0014.003,500.0013.003,250.00
0007203-01-00100General Excavation (Mainline Excavation and Detour Undercutting)1,949     CUYD20.4939,935.0120.0038,980.0065.00126,685.00
0008203-02-00100Drainage Excavation 942     CUYD20.3119,132.0225.0023,550.0065.0061,230.00
0009203-03-00100Embankment (Mainline Embankment and Detour Backfill)2,691     CUYD57.37154,382.6740.00107,640.0065.00174,915.00
0010204-05-00100Temporary Sediment Check Dams (Hay) 34     EACH233.777,948.18150.005,100.00154.005,236.00
0011204-06-00100Temporary Silt Fencing 2,319     LNFT4.7010,899.305.0011,595.003.006,957.00
0012401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 344     CUYD97.8833,670.7250.0017,200.0080.0027,520.00
0013402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 25     CUYD138.683,467.00250.006,250.0080.002,000.00
0014502-01-00100Asphalt Concrete 309.6   TON474.00146,750.40225.0069,660.00465.00143,964.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 203.6   TON520.00105,872.00265.0053,954.00465.0094,674.00
0016509-01-00100Milling Asphalt Pavement 1,318     SQYD21.3728,165.6610.0013,180.0030.0039,540.00
0017509-02-00100Contractor Retained Reclaimed Asphalt Pavement -73     CUYD0.01-0.731.00-73.001.00-73.00
0018510-01-00250Pavement Patching (14 inch Minimum Thickness) 82     SQYD477.8539,183.70250.0020,500.00465.0038,130.00
0019701-05-01046Side Drain Pipe (18" RCP/RPVCP) 65     LNFT102.786,680.70150.009,750.00147.009,555.00
0020701-05-01066Side Drain Pipe (24" RCP) 77     LNFT244.4818,824.96160.0012,320.00161.0012,397.00
0021702-08-00100Side Drain Safety End (Type 1) 6     EACH3,341.4920,048.944,000.0024,000.003,000.0018,000.00
0022704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 281.3   LNFT38.0010,689.4030.008,439.0031.008,720.30
0023704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT104.5010,450.00125.0012,500.00128.0012,800.00
0024704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH4,180.0016,720.003,250.0013,000.003,317.0013,268.00
0025708-01-00100Right-of-Way Monument 8     EACH418.003,344.00600.004,800.00613.004,904.00
0026708-02-00100Right-of-Way Monument Witness Post 8     EACH418.003,344.00200.001,600.00205.001,640.00
0027711-01-04000Riprap (55 lb, 18" Thick) 986     SQYD103.07101,627.02130.00128,180.00154.00151,844.00
0028711-04-00100Geotextile Fabric 986     SQYD3.773,717.222.001,972.006.005,916.00
0029713-01-00100Temporary Signs and Barricades 1     LUMP57,475.0057,475.0075,000.0075,000.0030,000.0030,000.00
0030724-02-00100Rumble Strips (Shoulder/Edge) 0.102 MILE37,120.003,786.241,000.00102.001,200.00122.40
0031725-01-00100Temporary Detour Roads 3,953.2   SQYD170.15672,636.98160.00632,512.00224.00885,516.80
0032727-01-00100Mobilization 1     LUMP449,350.00449,350.00470,000.00470,000.00400,000.00400,000.00
0033729-16-00300Object Marker Assembly (Type 3) 4     EACH261.251,045.0085.00340.0087.00348.00
0034731-02-00100Reflectorized Raised Pavement Markers 37     EACH29.371,086.699.00333.009.00333.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.545 MILE10,720.005,842.404,000.002,180.003,980.002,169.10
0036732-05-00100Removal of Existing Markings 0.15  MILE20,900.003,135.003,500.00525.003,572.00535.80
0037735-01-00100Mailboxes 6     EACH20.90125.4022.00132.0022.00132.00
0038735-02-00100Mailbox Supports (Single) 6     EACH261.251,567.50225.001,350.00230.001,380.00
0039739-01-00100Hydro-Seeding 2.88  ACRE3,433.009,887.042,800.008,064.002,858.008,231.04
0040740-01-00100Construction Layout 1     LUMP95,247.1695,247.1650,000.0050,000.0075,000.0075,000.00
0041804-01-00400Precast Concrete Piles (18") 1,440     LNFT223.78322,243.20500.00720,000.00260.00374,400.00
0042804-14-00100Dynamic Monitoring Assistance 3     EACH9,487.2928,461.871,000.003,000.0010,000.0030,000.00
0043805-01-00100Class A1 Concrete (Slab Span) 157.69  CUYD2,077.00327,522.132,000.00315,380.001,850.00291,726.50
0044805-01-00300Class A1 Concrete (Bent Cap) 48.67  CUYD4,532.00220,572.443,600.00175,212.001,850.0090,039.50
0045805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,383     SQFT8.5811,866.141.001,383.006.008,298.00
0046805-18-00200Concrete Finish (Class 3 Special Finish) 1,383     SQFT6.899,528.875.006,915.006.008,298.00
0047806-01-00100Deformed Reinforcing Steel 42,448     LB1.4159,851.682.0084,896.003.00127,344.00
0048810-01-00120Concrete Bridge Railing (36 inch Height) 200     LNFT348.3469,668.00200.0040,000.00296.0059,200.00
0049813-01-00100Concrete Approach Slabs (Cast-in-Place) 2,560     SQFT123.27315,571.20120.00307,200.00126.00322,560.00
0050814-01-00100Elastomeric Bearing Pads (Non-Reinforced) 256     SFIN57.7314,778.8860.0015,360.0080.0020,480.00
0051815-03-00300Joint Seal (Poured) 192     LNFT38.157,324.8030.005,760.0046.008,832.00
0052817-01-00100Temporary Detour Bridge (Concrete) 1,954     SQFT417.28815,365.12250.00488,500.00750.001,465,500.00
0054NS-203-00007Temporary Sheeting and Bracing 1     LUMP57,475.0057,475.008,000.008,000.005,000.005,000.00
0055NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 192     LNFT7.591,457.285.00960.005.00960.00
0056NS-500-00260Sawcuts in Asphalt Concrete Lifts 256     LNFT3.38865.285.001,280.005.001,280.00
0057NS-500-00340Saw Cutting Asphalt Concrete Pavement 1,468     INLF2.603,816.805.007,340.009.0013,212.00
           
  CONTRACTOR TOTAL   4,464,847.07 4,728,050.00 5,361,139.84