Search


Bid Tabulations for the Letting of 3/12/2025 LA DOTD Headquarters

Proposal:H.016061.6
Parish:Statewide
Description:M/V ST FRANCISVILLE – 2025 USCG DRYDOCK
Type Construction:DRYDOCK FOR REPAIRS, MAINTENANCE, PAINTING AND RELATED WORK.
Estimated Construction Cost:$2,146,800.00
Rank License BidderConstruction Bid
153507THOMA-SEA MARINE CONSTRUCTORS, LLC$2,431,674.75
240669Bollinger Quick Repair LLC$2,770,578.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
THOMA-SEA MARINE CONSTRUCTORS, LLC
- 2 -
Bollinger Quick Repair LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001NS-FBT-00021Air Compressors and Receiver Tanks (LS) 1     LUMP9,413.509,413.5021,047.0021,047.00
0002NS-FBT-00100Anodes 1     LUMP12,735.0012,735.0022,380.0022,380.00
0003NS-FBT-00160Bulwark and Deck Painting 1     LUMP100,346.00100,346.0085,357.0085,357.00
0004NS-FBT-00200Clean and Inspect Fresh Water Tank 1     LUMP4,435.004,435.0033,260.0033,260.00
0005NS-FBT-00220Clean and Repair Ventilation System 1     LUMP9,988.759,988.753,338.003,338.00
0006NS-FBT-00240Cleaning of Engine Room Bilge (and Engine Room)1     LUMP43,425.0043,425.0033,125.0033,125.00
0007NS-FBT-00260CO2 Room 1     LUMP21,288.7521,288.7519,669.0019,669.00
0008NS-FBT-00340Dry Docking 1     LUMP63,425.0063,425.00113,132.00113,132.00
0009NS-FBT-00360Dry Docking Inspection 1     LUMP18,140.0018,140.00138,645.00138,645.00
0010NS-FBT-00400Engine Day Tanks 1     LUMP24,610.0024,610.0014,868.0014,868.00
0011NS-FBT-00420Engine Room (Air Duct)1     LUMP9,655.009,655.004,550.004,550.00
0012NS-FBT-00500Fuel Tank 1     LUMP18,965.0018,965.0013,438.0013,438.00
0013NS-FBT-00520Gates 1     LUMP14,715.0014,715.006,432.006,432.00
0014NS-FBT-00540Hull Painting 1     LUMP106,725.00106,725.00134,220.00134,220.00
0015NS-FBT-00550Painting (Pilot/Deck House Exterior)1     LUMP42,133.0042,133.0064,165.0064,165.00
0016NS-FBT-00640Keel Coolers 1     LUMP44,953.5044,953.5071,297.0071,297.00
0017NS-FBT-00646Ferry Electrical System 1     LUMP146,210.50146,210.50172,157.00172,157.00
0018NS-FBT-00680Main Drive Gears 1     LUMP30,675.0030,675.0025,320.0025,320.00
0019NS-FBT-00720Manholes (New Gaskets)1     LUMP6,435.006,435.008,145.008,145.00
0020NS-FBT-00720Manholes (New Manholes)1     LUMP14,215.0014,215.0024,050.0024,050.00
0021NS-FBT-00741Miscellaneous Steel Repairs 5,000     LB25.95129,750.0035.00175,000.00
0022NS-FBT-00860Pilot House Windows and Shades 1     LUMP28,497.0028,497.008,008.008,008.00
0023NS-FBT-00900Propeller 1     LUMP31,525.0031,525.0051,250.0051,250.00
0024NS-FBT-00920Radars Monitoring and Identification System 1     LUMP122,960.00122,960.00142,234.00142,234.00
0025NS-FBT-01010Removal (Water Fountain)1     LUMP1,077.501,077.501,248.001,248.00
0026NS-FBT-01020Renew Galley 1     LUMP10,965.0010,965.006,001.006,001.00
0027NS-FBT-01060Repair of Generators 1     LUMP129,900.00129,900.00129,832.00129,832.00
0028NS-FBT-01080Repair of Main Engines 1     LUMP415,275.00415,275.00377,244.00377,244.00
0029NS-FBT-01190Replace (Batteries)1     LUMP4,582.004,582.006,255.006,255.00
0030NS-FBT-01190Replace (Damper Gaskets)1     LUMP5,527.505,527.507,800.007,800.00
0031NS-FBT-01190Replace (Mini Splits)1     LUMP13,799.0013,799.0018,301.0018,301.00
0032NS-FBT-01190Replace (Rescue Boat and Davit)1     LUMP181,719.50181,719.5088,160.0088,160.00
0033NS-FBT-01190Replace (Toilets)1     LUMP6,310.006,310.0025,044.0025,044.00
0034NS-FBT-01300Rudders and Steering Bushings and Bearings 1     LUMP52,416.0052,416.00114,855.00114,855.00
0035NS-FBT-01320Sea Chest and Bilge Suction Valves 1     LUMP81,584.0081,584.0092,900.0092,900.00
0036NS-FBT-01340Sea Trials 1     LUMP14,600.0014,600.008,500.008,500.00
0037NS-FBT-01380Sewage Treatment Unit 1     LUMP6,412.506,412.501,813.001,813.00
0038NS-FBT-01400Shaft Bearings 1     LUMP76,578.7576,578.75165,232.00165,232.00
0039NS-FBT-01400Shaft Bearings (Strut & Stern Tubes)1     LUMP56,537.0056,537.00115,003.00115,003.00
0040NS-FBT-01420Shafts (New Propeller Shafts)1     LUMP176,725.00176,725.00164,957.00164,957.00
0041NS-FBT-01440Sonic Gauging 1     LUMP7,685.007,685.006,938.006,938.00
0042NS-FBT-01460Steering System 1     LUMP134,760.00134,760.0055,408.0055,408.00
         
  CONTRACTOR TOTAL   2,431,674.75 2,770,578.00