Proposal:H.015759.6
Parish:Bossier
Routes:LA 3
Description:LA 3: LA 72 TO VIKING DRIVE
Type Construction:CLEANING AND RESEALING PAVEMENT JOINTS, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$3,842,525.86
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $2,092,972.36 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $5,840,289.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 600 | LNFT | 11.00 | 6,600.00 | 19.00 | 11,400.00 | | 0002 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 58,872 | LNFT | 2.70 | 158,954.40 | 3.00 | 176,616.00 | | 0003 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 47,600 | LNFT | 2.70 | 128,520.00 | 3.00 | 142,800.00 | | 0004 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 1,004.3 | SQYD | 255.00 | 256,096.50 | 700.00 | 703,010.00 | | 0005 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 1,151.2 | SQYD | 212.00 | 244,054.40 | 650.00 | 748,280.00 | | 0006 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 4,133.3 | SQYD | 198.00 | 818,393.40 | 600.00 | 2,479,980.00 | | 0007 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 5,900.00 | 5,900.00 | 8,000.00 | 8,000.00 | | 0008 | 707-01-00100 | Concrete Curb | 600 | LNFT | 18.00 | 10,800.00 | 30.00 | 18,000.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 575,000.00 | 575,000.00 | | 0010 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,800.00 | 7,600.00 | 6,000.00 | 12,000.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 198,000.00 | 198,000.00 | 540,000.00 | 540,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,802 | EACH | 5.23 | 9,424.46 | 10.00 | 18,020.00 | | 0013 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 549 | LNFT | 3.85 | 2,113.65 | 7.00 | 3,843.00 | | 0014 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 556 | LNFT | 18.15 | 10,091.40 | 30.00 | 16,680.00 | | 0015 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.112 | MILE | 4,840.00 | 58,622.08 | 7,500.00 | 90,840.00 | | 0016 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.296 | MILE | 14,300.00 | 4,232.80 | 27,000.00 | 7,992.00 | | 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.056 | MILE | 2,420.00 | 14,655.52 | 3,500.00 | 21,196.00 | | 0018 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.317 | MILE | 7,700.00 | 2,440.90 | 10,000.00 | 3,170.00 | | 0019 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 6.056 | MILE | 10,340.00 | 62,619.04 | 10,000.00 | 60,560.00 | | 0020 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 605.00 | 1,210.00 | 700.00 | 1,400.00 | | 0021 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 880.00 | 1,760.00 | 1,000.00 | 2,000.00 | | 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 82 | EACH | 412.50 | 33,825.00 | 500.00 | 41,000.00 | | 0023 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 594.00 | 1,188.00 | 500.00 | 1,000.00 | | 0024 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 6 | EACH | 1,595.00 | 9,570.00 | 2,000.00 | 12,000.00 | | 0025 | 732-05-00100 | Removal of Existing Markings | 5.616 | MILE | 3,410.00 | 19,150.56 | 22,000.00 | 123,552.00 | | 0026 | 737-05-00002 | Painted Curbs | 65 | LNFT | 3.85 | 250.25 | 30.00 | 1,950.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,900.00 | 1,900.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,092,972.36 | | 5,840,289.00 |
|