Proposal:H.015618.6
Parish:Acadia
Routes:LA 13
Description:LA 13: 0.2 MI N VERM P/L - 1.023 MI N LA 92
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ROADWAY REINFORCING MESH, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,689,257.83
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $4,694,424.92 |
| 2 | 34356 | Prairie Contractors LLC | $4,979,654.26 |
| 3 | 33663 | Glenn Lege Construction LLC | $6,710,677.42 |
| 4 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $7,385,797.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | - 3 - Glenn Lege Construction LLC | - 4 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.2 | LUMP | 15,000.00 | 15,000.00 | 13,000.00 | 13,000.00 | 109,424.03 | 109,424.03 | 190,000.00 | 190,000.00 | | 0002 | 202-02-00010 | Removal of Existing Concrete Box Wingwalls | 2 | EACH | 5,000.00 | 10,000.00 | 8,000.00 | 16,000.00 | 9,807.48 | 19,614.96 | 10,000.00 | 20,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 298 | SQYD | 35.00 | 10,430.00 | 40.00 | 11,920.00 | 65.82 | 19,614.36 | 100.00 | 29,800.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 598 | SQYD | 30.00 | 17,940.00 | 35.00 | 20,930.00 | 44.42 | 26,563.16 | 20.00 | 11,960.00 | | 0005 | 202-02-04560 | Removal of Bridge Joint Removal of Bridge Joint (Poured Joint Seals) | 180 | LNFT | 11.00 | 1,980.00 | 12.00 | 2,160.00 | 16.14 | 2,905.20 | 100.00 | 18,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 696 | LNFT | 12.25 | 8,526.00 | 15.00 | 10,440.00 | 9.28 | 6,458.88 | 10.00 | 6,960.00 | | 0007 | 202-02-32000 | Removal of Paved Ditches | 406 | SQYD | 25.00 | 10,150.00 | 40.00 | 16,240.00 | 79.53 | 32,289.18 | 125.00 | 50,750.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 36" RCP | 64 | LNFT | 50.00 | 3,200.00 | 25.00 | 1,600.00 | 102.17 | 6,538.88 | 100.00 | 6,400.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 385 | CUYD | 40.00 | 15,400.00 | 40.00 | 15,400.00 | 95.96 | 36,944.60 | 150.00 | 57,750.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 41 | EACH | 155.00 | 6,355.00 | 200.00 | 8,200.00 | 174.05 | 7,136.05 | 200.00 | 8,200.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 654 | LNFT | 2.75 | 1,798.50 | 10.00 | 6,540.00 | 5.80 | 3,793.20 | 6.00 | 3,924.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,010 | CUYD | 60.00 | 60,600.00 | 130.00 | 131,300.00 | 128.77 | 130,057.70 | 85.00 | 85,850.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 80.00 | 8,000.00 | 75.00 | 7,500.00 | 143.28 | 14,328.00 | 100.00 | 10,000.00 | | 0014 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 17.1 | SQYD | 205.00 | 3,505.50 | 300.00 | 5,130.00 | 157.27 | 2,689.32 | 500.00 | 8,550.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 21,358.8 | TON | 125.00 | 2,669,850.00 | 129.00 | 2,755,285.20 | 143.19 | 3,058,366.57 | 185.00 | 3,951,378.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 591.6 | TON | 180.00 | 106,488.00 | 232.00 | 137,251.20 | 229.24 | 135,618.38 | 185.00 | 109,446.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 64,404 | SQYD | 3.00 | 193,212.00 | 3.70 | 238,294.80 | 4.54 | 292,394.16 | 4.00 | 257,616.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,340 | CUYD | 0.01 | -53.40 | 0.01 | -53.40 | 0.01 | -53.40 | 1.00 | -5,340.00 | | 0019 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,265 | SQYD | 195.00 | 246,675.00 | 196.00 | 247,940.00 | 238.63 | 301,866.95 | 250.00 | 316,250.00 | | 0020 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 56 | LNFT | 275.00 | 15,400.00 | 450.00 | 25,200.00 | 552.43 | 30,936.08 | 650.00 | 36,400.00 | | 0021 | 701-05-02145 | Side Drain Pipe (Erosion) (48" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 80 | LNFT | 250.00 | 20,000.00 | 450.00 | 36,000.00 | 301.83 | 24,146.40 | 550.00 | 44,000.00 | | 0022 | 701-14-00100 | Cleaning Existing Pipes | 296 | LNFT | 5.00 | 1,480.00 | 45.00 | 13,320.00 | 69.92 | 20,696.32 | 100.00 | 29,600.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 80 | LNFT | 20.00 | 1,600.00 | 10.00 | 800.00 | 209.87 | 16,789.60 | 100.00 | 8,000.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 244 | LNFT | 49.00 | 11,956.00 | 110.00 | 26,840.00 | 51.64 | 12,600.16 | 46.00 | 11,224.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 287.5 | LNFT | 32.50 | 9,343.75 | 40.00 | 11,500.00 | 34.24 | 9,844.00 | 31.00 | 8,912.50 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 130.00 | 13,000.00 | 160.00 | 16,000.00 | 138.08 | 13,808.00 | 121.00 | 12,100.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,015.00 | 16,060.00 | 5,000.00 | 20,000.00 | 4,235.28 | 16,941.12 | 4,000.00 | 16,000.00 | | 0028 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 150.00 | 8,100.00 | 220.00 | 11,880.00 | 54.05 | 2,918.70 | 100.00 | 5,400.00 | | 0029 | 710-01-00110 | Flowable Fill (Excavatable) | 5 | CUYD | 240.00 | 1,200.00 | 400.00 | 2,000.00 | 272.83 | 1,364.15 | 1,000.00 | 5,000.00 | | 0030 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 1,893 | SQYD | 85.00 | 160,905.00 | 145.00 | 274,485.00 | 73.02 | 138,226.86 | 140.00 | 265,020.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 1,893 | SQYD | 4.00 | 7,572.00 | 7.00 | 13,251.00 | 8.07 | 15,276.51 | 10.00 | 18,930.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 344,333.86 | 344,333.86 | 100,000.00 | 100,000.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.48 | MILE | 635.00 | 9,829.80 | 650.00 | 10,062.00 | 1,291.52 | 19,992.73 | 300.00 | 4,644.00 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.384 | MILE | 880.00 | 12,657.92 | 1.00 | 14.38 | 928.28 | 13,352.38 | 100.00 | 1,438.40 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 37.48 | MILE | 1,100.00 | 41,228.00 | 1.00 | 37.48 | 1,160.35 | 43,489.92 | 100.00 | 3,748.00 | | 0036 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 6,000.00 | 6,000.00 | 8,000.00 | 8,000.00 | 26,637.60 | 26,637.60 | 25,000.00 | 25,000.00 | | 0037 | 724-01-00100 | Rumble Strips (Centerline) | 3.844 | MILE | 1,100.00 | 4,228.40 | 1,200.00 | 4,612.80 | 1,160.35 | 4,460.39 | 1,200.00 | 4,612.80 | | 0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.685 | MILE | 1,100.00 | 8,453.50 | 1,200.00 | 9,222.00 | 1,160.35 | 8,917.29 | 1,200.00 | 9,222.00 | | 0039 | 726-01-00100 | Bedding Material | 17.3 | CUYD | 150.00 | 2,595.00 | 155.00 | 2,681.50 | 236.32 | 4,088.34 | 200.00 | 3,460.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 150,000.00 | 150,000.00 | 556,160.80 | 556,160.80 | 738,500.00 | 738,500.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 40 | EACH | 85.00 | 3,400.00 | 75.00 | 3,000.00 | 87.03 | 3,481.20 | 80.00 | 3,200.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 95.00 | 760.00 | 150.00 | 1,200.00 | 98.63 | 789.04 | 85.00 | 680.00 | | 0043 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 417 | EACH | 11.50 | 4,795.50 | 12.50 | 5,212.50 | 12.19 | 5,083.23 | 11.00 | 4,587.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 559 | EACH | 8.00 | 4,472.00 | 9.00 | 5,031.00 | 8.12 | 4,539.08 | 8.00 | 4,472.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.37 | MILE | 6,050.00 | 56,688.50 | 6,500.00 | 60,905.00 | 6,381.93 | 59,798.68 | 6,000.00 | 56,220.00 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.596 | MILE | 2,375.00 | 8,540.50 | 2,750.00 | 9,889.00 | 2,494.75 | 8,971.12 | 2,500.00 | 8,990.00 | | 0047 | 735-01-00100 | Mailboxes | 35 | EACH | 22.00 | 770.00 | 10.00 | 350.00 | 29.01 | 1,015.35 | 30.00 | 1,050.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 35 | EACH | 275.00 | 9,625.00 | 325.00 | 11,375.00 | 232.07 | 8,122.45 | 205.00 | 7,175.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.63 | ACRE | 3,795.00 | 2,390.85 | 7,500.00 | 4,725.00 | 5,221.58 | 3,289.60 | 5,000.00 | 3,150.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 1,000.00 | 1,000.00 | 197,764.00 | 197,764.00 | 25,000.00 | 25,000.00 | | 0051 | 815-03-00300 | Joint Seal (Poured) | 180 | LNFT | 50.00 | 9,000.00 | 50.00 | 9,000.00 | 72.65 | 13,077.00 | 100.00 | 18,000.00 | | 0052 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 62,964 | SQYD | 8.15 | 513,156.60 | 7.70 | 484,822.80 | 13.82 | 870,162.48 | 12.00 | 755,568.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 180 | LNFT | 6.00 | 1,080.00 | 6.00 | 1,080.00 | 8.48 | 1,526.40 | 25.00 | 4,500.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 180 | LNFT | 6.00 | 1,080.00 | 6.00 | 1,080.00 | 8.48 | 1,526.40 | 25.00 | 4,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,694,424.92 | | 4,979,654.26 | | 6,710,677.42 | | 7,385,797.70 |
|