Proposal:H.015611.6
Parish:Claiborne
Routes:LA 540
Description:LA 540: DRAIN BRIDGE
Type Construction:REMOVAL OF CONCRETE SLAB SPAN BRIDGE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE BOX CULVERT AND RELATED WORK.
Estimated Construction Cost:$903,835.26
| Rank | License | Bidder | Construction Bid |
| 1 | 77205 | Synergen Construction, LLC | $703,278.13 |
| 2 | 49239 | WL Bass Construction Inc. | $756,600.90 |
| 3 | 46716 | BRUDD CONSTRUCTION CO., LLC | $871,237.81 |
| 4 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $895,060.80 |
| 5 | 64911 | Bentz Construction Group, LLC | $1,066,319.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Synergen Construction, LLC | - 2 - WL Bass Construction Inc. | - 3 - BRUDD CONSTRUCTION CO., LLC | - 4 - SPECIALTY TRACKHOE & DOZER SERV.INC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.1 | LUMP | 10,200.00 | 10,200.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,700.00 | 9,700.00 | 1,000.00 | 1,000.00 | 5,332.00 | 5,332.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 228.2 | SQYD | 8.00 | 1,825.60 | 3.00 | 684.60 | 25.00 | 5,705.00 | 15.00 | 3,423.00 | | 0004 | 202-02-04501 | Removal of Bridge STA 108+07.00, Light Weight Precast Concrete Slab Span | 513 | LUMP | 15,250.00 | 15,250.00 | 26,600.00 | 26,600.00 | 6,889.00 | 6,889.00 | 30,000.00 | 30,000.00 | | 0005 | 203-01-00100 | General Excavation | 107 | CUYD | 35.05 | 3,750.35 | 18.00 | 1,926.00 | 13.47 | 1,441.29 | 24.00 | 2,568.00 | | 0006 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 18.55 | 10,202.50 | 20.00 | 11,000.00 | 9.07 | 4,988.50 | 24.00 | 13,200.00 | | 0007 | 203-03-00100 | Embankment | 279 | CUYD | 30.77 | 8,584.83 | 35.00 | 9,765.00 | 24.40 | 6,807.60 | 32.00 | 8,928.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 55.00 | 385.00 | 35.00 | 245.00 | 41.30 | 289.10 | 50.00 | 350.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 535 | LNFT | 7.70 | 4,119.50 | 6.00 | 3,210.00 | 5.90 | 3,156.50 | 3.00 | 1,605.00 | | 0010 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 458.2 | SQYD | 62.76 | 28,756.63 | 75.00 | 34,365.00 | 86.78 | 39,762.60 | 66.50 | 30,470.30 | | 0011 | 304-01-00100 | Lime | 6.48 | TON | 470.20 | 3,046.90 | 395.00 | 2,559.60 | 377.42 | 2,445.68 | 450.00 | 2,916.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 459 | SQYD | 26.80 | 12,301.20 | 7.00 | 3,213.00 | 13.88 | 6,370.92 | 8.00 | 3,672.00 | | 0013 | 401-01-00100 | Aggregate Surface Course (Net Section) | 5.3 | CUYD | 520.23 | 2,757.22 | 200.00 | 1,060.00 | 230.00 | 1,219.00 | 315.00 | 1,669.50 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 10 | CUYD | 102.50 | 1,025.00 | 120.00 | 1,200.00 | 183.20 | 1,832.00 | 150.00 | 1,500.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 144.5 | TON | 275.00 | 39,737.50 | 300.00 | 43,350.00 | 336.02 | 48,554.89 | 253.00 | 36,558.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 49.5 | TON | 275.00 | 13,612.50 | 300.00 | 14,850.00 | 389.81 | 19,295.60 | 253.00 | 12,523.50 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 391 | SQYD | 23.00 | 8,993.00 | 10.00 | 3,910.00 | 30.18 | 11,800.38 | 32.00 | 12,512.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -26 | CUYD | 0.01 | -0.26 | 1.00 | -26.00 | 1.00 | -26.00 | 0.10 | -2.60 | | 0019 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 262 | LNFT | 133.07 | 34,864.34 | 88.00 | 23,056.00 | 122.00 | 31,964.00 | 104.00 | 27,248.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 75 | LNFT | 32.00 | 2,400.00 | 150.00 | 11,250.00 | 18.88 | 1,416.00 | 10.00 | 750.00 | | 0021 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,418.58 | 8,418.58 | 11,000.00 | 11,000.00 | 7,334.00 | 7,334.00 | 8,100.00 | 8,100.00 | | 0022 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 4,997.95 | 4,997.95 | 4,000.00 | 4,000.00 | 4,971.00 | 4,971.00 | 5,800.00 | 5,800.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 206.3 | LNFT | 136.59 | 28,178.52 | 34.00 | 7,014.20 | 40.00 | 8,252.00 | 34.00 | 7,014.20 | | 0024 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,868.50 | 5,868.50 | 5,000.00 | 5,000.00 | 5,900.00 | 5,900.00 | 5,000.00 | 5,000.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 6,506.67 | 19,520.01 | 4,250.00 | 12,750.00 | 5,015.00 | 15,045.00 | 4,250.00 | 12,750.00 | | 0026 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 927 | SQYD | 125.79 | 116,607.33 | 150.00 | 139,050.00 | 150.41 | 139,430.07 | 125.00 | 115,875.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 927 | SQYD | 4.08 | 3,782.16 | 4.00 | 3,708.00 | 2.38 | 2,206.26 | 3.00 | 2,781.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 29,012.02 | 29,012.02 | 30,000.00 | 30,000.00 | 28,200.00 | 28,200.00 | 25,000.00 | 25,000.00 | | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 18,000.00 | 18,000.00 | 3,000.00 | 3,000.00 | 11,800.00 | 11,800.00 | 12,000.00 | 12,000.00 | | 0030 | 726-01-00100 | Bedding Material | 50.7 | CUYD | 373.38 | 18,930.37 | 195.00 | 9,886.50 | 171.00 | 8,669.70 | 152.00 | 7,706.40 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 17,688.00 | 17,688.00 | 75,660.00 | 75,660.00 | 81,500.00 | 81,500.00 | 85,000.00 | 85,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 151.25 | 605.00 | 130.00 | 520.00 | 153.40 | 613.60 | 125.00 | 500.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 16 | EACH | 22.00 | 352.00 | 20.00 | 320.00 | 23.60 | 377.60 | 20.00 | 320.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,196 | LNFT | 6.52 | 7,797.92 | 3.00 | 3,588.00 | 3.54 | 4,233.84 | 3.00 | 3,588.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 2.1 | ACRE | 4,345.00 | 9,124.50 | 3,500.00 | 7,350.00 | 4,130.00 | 8,673.00 | 3,950.00 | 8,295.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,590.00 | 17,590.00 | 15,000.00 | 15,000.00 | 5,493.84 | 5,493.84 | 12,000.00 | 12,000.00 | | 0037 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 58 | LNFT | 2,095.57 | 121,543.06 | 1,900.00 | 110,200.00 | 3,132.48 | 181,683.84 | 3,020.00 | 175,160.00 | | 0038 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall quantity of steel = 3691 lbs
quantity of concrete = 48.18 cu yards | 2 | EACH | 30,800.00 | 61,600.00 | 52,500.00 | 105,000.00 | 71,349.00 | 142,698.00 | 97,500.00 | 195,000.00 | | 0039 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 320 | INLF | 6.72 | 2,150.40 | 1.05 | 336.00 | 9.10 | 2,912.00 | 4.00 | 1,280.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 703,278.13 | | 756,600.90 | | 871,237.81 | | 895,060.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Bentz Construction Group, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.1 | LUMP | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 228.2 | SQYD | 42.00 | 9,584.40 | | 0004 | 202-02-04501 | Removal of Bridge STA 108+07.00, Light Weight Precast Concrete Slab Span | 513 | LUMP | 40,000.00 | 40,000.00 | | 0005 | 203-01-00100 | General Excavation | 107 | CUYD | 37.00 | 3,959.00 | | 0006 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 37.00 | 20,350.00 | | 0007 | 203-03-00100 | Embankment | 279 | CUYD | 46.00 | 12,834.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 65.00 | 455.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 535 | LNFT | 6.00 | 3,210.00 | | 0010 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 458.2 | SQYD | 80.00 | 36,656.00 | | 0011 | 304-01-00100 | Lime | 6.48 | TON | 440.00 | 2,851.20 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 459 | SQYD | 22.00 | 10,098.00 | | 0013 | 401-01-00100 | Aggregate Surface Course (Net Section) | 5.3 | CUYD | 229.00 | 1,213.70 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 10 | CUYD | 202.00 | 2,020.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 144.5 | TON | 350.00 | 50,575.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 49.5 | TON | 350.00 | 17,325.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 391 | SQYD | 13.00 | 5,083.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -26 | CUYD | 1.00 | -26.00 | | 0019 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 262 | LNFT | 159.00 | 41,658.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 75 | LNFT | 1.00 | 75.00 | | 0021 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,000.00 | 8,000.00 | | 0022 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 4,830.00 | 4,830.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 206.3 | LNFT | 48.00 | 9,902.40 | | 0024 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,912.00 | 5,912.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 5,117.00 | 15,351.00 | | 0026 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 927 | SQYD | 235.00 | 217,845.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 927 | SQYD | 1.50 | 1,390.50 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | | 0030 | 726-01-00100 | Bedding Material | 50.7 | CUYD | 204.00 | 10,342.80 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 134,000.00 | 134,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 112.00 | 448.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 16 | EACH | 27.00 | 432.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,196 | LNFT | 4.00 | 4,784.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 2.1 | ACRE | 8,000.00 | 16,800.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | | 0037 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 58 | LNFT | 2,800.00 | 162,400.00 | | 0038 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall quantity of steel = 3691 lbs
quantity of concrete = 48.18 cu yards | 2 | EACH | 65,000.00 | 130,000.00 | | 0039 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 320 | INLF | 3.00 | 960.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,066,319.00 |
|