Proposal:H.015523.6
Parish:St. Mary
Description:ST MARY PARISH MOVABLE BR REPAIRS (PH 2)
Type Construction:MOVABLE BRIDGE STRUCTURAL, MECHANICAL AND ELECTRICAL REPAIRS, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$2,458,680.21
| Rank | License | Bidder | Construction Bid |
| 1 | 00009 | Coastal Contractors, LLC | $1,559,383.00 |
| 2 | 67770 | Reliant Industrial Solutions L.L.C. | $2,306,741.00 |
| 3 | 33678 | Sealevel Construction Inc. | $2,695,200.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Coastal Contractors, LLC | - 2 - Reliant Industrial Solutions L.L.C. | - 3 - Sealevel Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Bridge Railing | 28 | LNFT | 160.00 | 4,480.00 | 270.00 | 7,560.00 | 260.00 | 7,280.00 | | 0002 | 202-02-00050 | Removal of (Movable Barrier) | 1 | LUMP | 10,000.00 | 10,000.00 | 14,000.00 | 14,000.00 | 22,000.00 | 22,000.00 | | 0003 | 202-02-00050 | Removal of Debris and Trash from Pier Tops and Swing Span Structure | 1 | LUMP | 19,000.00 | 19,000.00 | 27,500.00 | 27,500.00 | 24,000.00 | 24,000.00 | | 0004 | 202-02-00050 | Removal of Movable Barrier | 1 | LUMP | 5,000.00 | 5,000.00 | 14,000.00 | 14,000.00 | 22,000.00 | 22,000.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 36,000.00 | 36,000.00 | 26,500.00 | 26,500.00 | 65,000.00 | 65,000.00 | | 0006 | 727-01-00100 | Mobilization | 1 | LUMP | 122,000.00 | 122,000.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | | 0007 | 804-01-00200 | Precast Concrete Piles (14") | 540 | LNFT | 200.00 | 108,000.00 | 425.00 | 229,500.00 | 425.00 | 229,500.00 | | 0008 | 804-14-00100 | Dynamic Monitoring Assistance | 2 | EACH | 3,500.00 | 7,000.00 | 2,400.00 | 4,800.00 | 4,000.00 | 8,000.00 | | 0009 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 22.2 | CUYD | 3,500.00 | 77,700.00 | 4,900.00 | 108,780.00 | 7,500.00 | 166,500.00 | | 0010 | 805-01-00500 | Class A1 Concrete (Footing) | 2.95 | CUYD | 5,850.00 | 17,257.50 | 3,400.00 | 10,030.00 | 6,000.00 | 17,700.00 | | 0011 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 23 | SQFT | 2.50 | 57.50 | 49.00 | 1,127.00 | 600.00 | 13,800.00 | | 0012 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 868 | SQFT | 3.50 | 3,038.00 | 8.00 | 6,944.00 | 20.00 | 17,360.00 | | 0013 | 806-01-00100 | Deformed Reinforcing Steel | 2,890 | LB | 4.00 | 11,560.00 | 6.00 | 17,340.00 | 8.00 | 23,120.00 | | 0014 | 807-01-00100 | Structural Metalwork (Grade 36) Estimated Quantity = 2,491 lbs | 2,491 | LUMP | 20,000.00 | 20,000.00 | 32,500.00 | 32,500.00 | 60,000.00 | 60,000.00 | | 0015 | 807-01-00300 | Structural Metalwork (Grade 50S) (Estimated Quantity = 4,405 lbs.) | 4,405 | LUMP | 28,000.00 | 28,000.00 | 40,750.00 | 40,750.00 | 75,000.00 | 75,000.00 | | 0016 | 810-04-00100 | Hand Railing (Galvanized) | 96 | LNFT | 225.00 | 21,600.00 | 200.00 | 19,200.00 | 165.00 | 15,840.00 | | 0017 | 812-01-00100 | Treated Timber (Land and Fresh Water Treatment) | 3 | MFBM | 12,500.00 | 37,500.00 | 8,250.00 | 24,750.00 | 20,000.00 | 60,000.00 | | 0018 | 820-02-00100 | Temporary Operation & Maintenance of Movable Span | 57 | DAY | 100.00 | 5,700.00 | 300.00 | 17,100.00 | 1,600.00 | 91,200.00 | | 0019 | NS-830-00300 | Concrete and Metal Bridge Railing Repair and Rehabilitation | 18 | LNFT | 655.00 | 11,790.00 | 895.00 | 16,110.00 | 800.00 | 14,400.00 | | 0020 | TS-810-00100 | Modify Concrete Barrier Rail (Traffic Barrier Latch at Bridge Road) | 5 | LNFT | 940.00 | 4,700.00 | 1,650.00 | 8,250.00 | 1,900.00 | 9,500.00 | | 0021 | TS-821-01100 | Swing Span Bridge Machinery (Hydraulic Cylinder Refurbishment) | 1 | LUMP | 57,000.00 | 57,000.00 | 200,000.00 | 200,000.00 | 56,000.00 | 56,000.00 | | 0022 | TS-821-01100 | Swing Span Bridge Machinery (Pivot Bearing Lubrication) | 1 | LUMP | 17,000.00 | 17,000.00 | 95,000.00 | 95,000.00 | 40,000.00 | 40,000.00 | | 0023 | TS-821-01100 | Swing Span Bridge Machinery (Refurbishment of Hydraulic Machinery) | 1 | LUMP | 250,000.00 | 250,000.00 | 350,000.00 | 350,000.00 | 363,000.00 | 363,000.00 | | 0024 | TS-821-06010 | Movable Bridge Traffic Barrier | 1 | LUMP | 360,000.00 | 360,000.00 | 365,000.00 | 365,000.00 | 480,000.00 | 480,000.00 | | 0025 | TS-822-09100 | Electrical System (Bridge Road) | 1 | LUMP | 125,000.00 | 125,000.00 | 165,000.00 | 165,000.00 | 200,000.00 | 200,000.00 | | 0026 | TS-822-09100 | Electrical System (Centerville Bridge) | 1 | LUMP | 115,000.00 | 115,000.00 | 170,000.00 | 170,000.00 | 212,000.00 | 212,000.00 | | 0027 | TS-823-01200 | Bridge Operator's House Renovation | 1 | LUMP | 85,000.00 | 85,000.00 | 135,000.00 | 135,000.00 | 152,000.00 | 152,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,559,383.00 | | 2,306,741.00 | | 2,695,200.00 |
|