Proposal:H.015087.6
Parish:Jefferson
Description:KENNER DISCOVERY SCHOOL SIDEWALKS
Type Construction:CONCRETE WALKS, TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$364,203.50
| Rank | License | Bidder | Construction Bid |
| 1 | 74839 | 21 Construction, L.L.C. | $369,993.25 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $439,682.90 |
| 3 | 48896 | Command Construction Industries LLC | $484,001.50 |
| 4 | 36961 | Cycle Construction Co. L.L.C. | $578,663.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - 21 Construction, L.L.C. | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - Command Construction Industries LLC | - 4 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,600.00 | 4,600.00 | 5,000.00 | 5,000.00 | 22,000.00 | 22,000.00 | 1,000.00 | 1,000.00 | | 0002 | 202-02-00030 | Removal of Removal of existing striping (at driveways) | 584 | LNFT | 3.00 | 1,752.00 | 5.00 | 2,920.00 | 3.00 | 1,752.00 | 3.50 | 2,044.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 53.5 | LNFT | 10.00 | 535.00 | 10.00 | 535.00 | 10.00 | 535.00 | 10.00 | 535.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 9,500.00 | 9,500.00 | | 0005 | 202-03-38000 | Relocation of Sign | 7 | EACH | 100.00 | 700.00 | 200.00 | 1,400.00 | 100.00 | 700.00 | 150.00 | 1,050.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 32 | EACH | 15.00 | 480.00 | 30.00 | 960.00 | 10.00 | 320.00 | 40.00 | 1,280.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 50 | LNFT | 3.00 | 150.00 | 2.50 | 125.00 | 5.00 | 250.00 | 12.00 | 600.00 | | 0008 | 706-01-00300 | Concrete Walk (6" Thick) | 1,043.3 | SQYD | 90.00 | 93,897.00 | 85.00 | 88,680.50 | 105.00 | 109,546.50 | 155.00 | 161,711.50 | | 0009 | 707-01-00100 | Concrete Curb | 165 | LNFT | 20.00 | 3,300.00 | 21.00 | 3,465.00 | 30.00 | 4,950.00 | 45.00 | 7,425.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0011 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 100 | SQYD | 10.00 | 1,000.00 | 12.00 | 1,200.00 | 12.00 | 1,200.00 | 14.00 | 1,400.00 | | 0012 | 723-02-00100 | Granular Material (Vehicular Measurement) | 100 | CUYD | 25.00 | 2,500.00 | 32.00 | 3,200.00 | 50.00 | 5,000.00 | 35.00 | 3,500.00 | | 0013 | 727-01-00100 | Mobilization | 1 | LUMP | 34,000.00 | 34,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | 80,000.00 | 80,000.00 | | 0014 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 32.5 | SQFT | 40.00 | 1,300.00 | 150.00 | 4,875.00 | 50.00 | 1,625.00 | 58.00 | 1,885.00 | | 0015 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 337.2 | LNFT | 15.00 | 5,058.00 | 17.00 | 5,732.40 | 15.00 | 5,058.00 | 15.00 | 5,058.00 | | 0016 | 736-01-00100 | Trenching and Backfilling | 65 | LNFT | 10.50 | 682.50 | 12.00 | 780.00 | 25.00 | 1,625.00 | 10.00 | 650.00 | | 0017 | 736-03-00100 | Jacking or Boring | 262 | LNFT | 26.50 | 6,943.00 | 30.00 | 7,860.00 | 25.00 | 6,550.00 | 300.00 | 78,600.00 | | 0018 | 736-04-00001 | Signal Pole (Pedestal Pole) | 8 | EACH | 1,260.00 | 10,080.00 | 1,500.00 | 12,000.00 | 2,750.00 | 22,000.00 | 1,300.00 | 10,400.00 | | 0019 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) (Install Only. City of Kenner Will Furnish.) | 1 | EACH | 1,050.00 | 1,050.00 | 775.00 | 775.00 | 2,750.00 | 2,750.00 | 700.00 | 700.00 | | 0020 | 736-10-00300 | Underground Junction Box (Type F) | 5 | EACH | 1,395.00 | 6,975.00 | 1,700.00 | 8,500.00 | 2,750.00 | 13,750.00 | 1,500.00 | 7,500.00 | | 0021 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 130 | LNFT | 37.00 | 4,810.00 | 40.00 | 5,200.00 | 10.00 | 1,300.00 | 37.00 | 4,810.00 | | 0022 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 300 | LNFT | 29.00 | 8,700.00 | 35.00 | 10,500.00 | 15.00 | 4,500.00 | 31.00 | 9,300.00 | | 0023 | 736-12-02014 | Conductor (2c, #14 awg) | 860 | LNFT | 4.25 | 3,655.00 | 5.00 | 4,300.00 | 3.00 | 2,580.00 | 4.00 | 3,440.00 | | 0024 | 736-12-06014 | Conductor (6c, #14 awg) | 915 | LNFT | 7.45 | 6,816.75 | 9.00 | 8,235.00 | 4.00 | 3,660.00 | 8.00 | 7,320.00 | | 0025 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 8 | EACH | 3,415.00 | 27,320.00 | 4,000.00 | 32,000.00 | 2,750.00 | 22,000.00 | 3,700.00 | 29,600.00 | | 0026 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 8 | EACH | 788.00 | 6,304.00 | 900.00 | 7,200.00 | 2,750.00 | 22,000.00 | 800.00 | 6,400.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | | 0028 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 28,350.00 | 28,350.00 | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 31,000.00 | 31,000.00 | | 0029 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 8 | EACH | 1,200.00 | 9,600.00 | 1,500.00 | 12,000.00 | 2,750.00 | 22,000.00 | 1,300.00 | 10,400.00 | | 0030 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 4,500.00 | 4,500.00 | 5,400.00 | 5,400.00 | 6,000.00 | 6,000.00 | 4,900.00 | 4,900.00 | | 0031 | TS-736-00320 | Traffic Controller Cabinet Foundation and Access Platform | 1 | LS | 40,000.00 | 40,000.00 | 70,000.00 | 70,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0032 | TS-741-00100 | Fire Hydrant Assembly | 1 | EACH | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 | 10,000.00 | 10,000.00 | 7,700.00 | 7,700.00 | | 0033 | TS-741-01090 | Water Main (6" PVC) (PVC/C-900 Pipe) | 7 | LNFT | 50.00 | 350.00 | 220.00 | 1,540.00 | 150.00 | 1,050.00 | 390.00 | 2,730.00 | | 0034 | TS-741-01110 | Water Main (12" PVC) (PVC/C-900 Pipe) | 10 | LNFT | 120.00 | 1,200.00 | 250.00 | 2,500.00 | 250.00 | 2,500.00 | 400.00 | 4,000.00 | | 0035 | TS-741-10023 | Adjust Valve Boxes | 3 | EACH | 225.00 | 675.00 | 600.00 | 1,800.00 | 100.00 | 300.00 | 400.00 | 1,200.00 | | 0036 | TS-741-11201 | Ductile Iron Fittings | 150 | LB | 12.00 | 1,800.00 | 32.00 | 4,800.00 | 25.00 | 3,750.00 | 12.00 | 1,800.00 | | 0037 | TS-741-60060 | Gate Valve and Valve Box (6") | 1 | EACH | 1,300.00 | 1,300.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | | 0038 | TS-741-70110 | Pipe Restraints (6") | 3 | EACH | 140.00 | 420.00 | 300.00 | 900.00 | 250.00 | 750.00 | 525.00 | 1,575.00 | | 0039 | TS-741-70114 | Pipe Restraints (12") | 6 | EACH | 365.00 | 2,190.00 | 600.00 | 3,600.00 | 500.00 | 3,000.00 | 775.00 | 4,650.00 | | 0040 | TS-741-70123 | Transitional Coupling (12") | 2 | EACH | 1,000.00 | 2,000.00 | 1,600.00 | 3,200.00 | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 369,993.25 | | 439,682.90 | | 484,001.50 | | 578,663.50 |
|