Proposal:H.014843.6
Parish:Terrebonne
Routes:LA 182, LA 24, LA 659
Description:LA 24: LA 661 - LA 664
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT AND CONCRETE PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CONCRETE WALKS AND RAMPS, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$5,125,302.98
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $3,999,991.33 |
| 2 | 06276 | Barriere Construction Co., LLC | $5,499,877.68 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 886 | LNFT | 9.50 | 8,417.00 | 9.00 | 7,974.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,546.5 | SQYD | 34.00 | 52,581.00 | 33.00 | 51,034.50 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 2,677 | LNFT | 7.25 | 19,408.25 | 7.50 | 20,077.50 | | 0004 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" CONCRETE STORM DRAIN | 16 | LNFT | 155.00 | 2,480.00 | 155.00 | 2,480.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 44.4 | SQYD | 73.00 | 3,241.20 | 77.00 | 3,418.80 | | 0006 | 202-02-38240 | Removal of Signs and Supports | 18 | EACH | 115.00 | 2,070.00 | 750.00 | 13,500.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 300 | CUYD | 30.00 | 9,000.00 | 196.00 | 58,800.00 | | 0008 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5.9 | CUYD | 70.00 | 413.00 | 100.00 | 590.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 10,278.2 | TON | 130.00 | 1,336,166.00 | 171.00 | 1,757,572.20 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 346.4 | TON | 262.00 | 90,756.80 | 400.00 | 138,560.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 94,386 | SQYD | 1.95 | 184,052.70 | 5.00 | 471,930.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,192 | CUYD | 0.01 | -41.92 | 0.01 | -41.92 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,524 | SQYD | 122.00 | 429,928.00 | 160.00 | 563,840.00 | | 0014 | 510-03-00100 | Pavement Joint Repair | 9.5 | TON | 1,250.00 | 11,875.00 | 600.00 | 5,700.00 | | 0015 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 600 | LNFT | 3.00 | 1,800.00 | 3.00 | 1,800.00 | | 0016 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,080 | LNFT | 3.00 | 6,240.00 | 3.00 | 6,240.00 | | 0017 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 46.7 | SQYD | 220.00 | 10,274.00 | 225.00 | 10,507.50 | | 0018 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 16 | LNFT | 350.00 | 5,600.00 | 330.00 | 5,280.00 | | 0019 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,875.00 | 7,750.00 | 4,000.00 | 8,000.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 16 | LNFT | 68.00 | 1,088.00 | 70.00 | 1,120.00 | | 0021 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 1 | EACH | 2,500.00 | 2,500.00 | 2,400.00 | 2,400.00 | | 0022 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 7 | EACH | 3,000.00 | 21,000.00 | 2,750.00 | 19,250.00 | | 0023 | 702-04-00100 | Adjusting Manholes | 33 | EACH | 260.00 | 8,580.00 | 3,250.00 | 107,250.00 | | 0024 | 702-04-00200 | Adjusting Catch Basins | 33 | EACH | 4,800.00 | 158,400.00 | 5,000.00 | 165,000.00 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 1,185.2 | SQYD | 62.50 | 74,075.00 | 65.00 | 77,038.00 | | 0026 | 706-04-00110 | Curb Ramps TYPE 3 | 24.3 | SQYD | 265.00 | 6,439.50 | 250.00 | 6,075.00 | | 0027 | 706-04-00110 | Curb Ramps TYPE 4 | 572.8 | SQYD | 105.00 | 60,144.00 | 100.00 | 57,280.00 | | 0028 | 706-04-00110 | Curb Ramps TYPE 5 | 248.3 | SQYD | 110.00 | 27,313.00 | 110.00 | 27,313.00 | | 0029 | 706-04-00110 | Curb Ramps TYPE 6 | 13.7 | SQYD | 185.00 | 2,534.50 | 200.00 | 2,740.00 | | 0030 | 706-04-00110 | Curb Ramps TYPE 7 | 66.5 | SQYD | 155.00 | 10,307.50 | 150.00 | 9,975.00 | | 0031 | 706-04-00110 | Curb Ramps TYPE 8 | 449.5 | SQYD | 120.00 | 53,940.00 | 120.00 | 53,940.00 | | 0032 | 707-01-00100 | Concrete Curb | 941 | LNFT | 17.00 | 15,997.00 | 17.00 | 15,997.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 886 | LNFT | 36.50 | 32,339.00 | 35.00 | 31,010.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 206,600.00 | 206,600.00 | 505,000.00 | 505,000.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.284 | MILE | 300.00 | 3,385.20 | 1,931.00 | 21,789.40 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.284 | MILE | 750.00 | 8,463.00 | 700.00 | 7,898.80 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.302 | MILE | 1,250.00 | 29,127.50 | 1,100.00 | 25,632.20 | | 0038 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 12 | EACH | 25.00 | 300.00 | 26.00 | 312.00 | | 0039 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 20 | EACH | 25.00 | 500.00 | 26.00 | 520.00 | | 0040 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 16 | EACH | 25.00 | 400.00 | 26.00 | 416.00 | | 0041 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 9 | EACH | 25.00 | 225.00 | 26.00 | 234.00 | | 0042 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 30 | EACH | 25.00 | 750.00 | 26.00 | 780.00 | | 0043 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 21,250.00 | 127,500.00 | 20,000.00 | 120,000.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 2.3 | TON | 750.00 | 1,725.00 | 1,000.00 | 2,300.00 | | 0045 | 717-01-00100 | Seeding | 66 | LB | 12.00 | 792.00 | 16.00 | 1,056.00 | | 0046 | 718-01-00100 | Fertilizer | 1,116 | LB | 0.95 | 1,060.20 | 1.00 | 1,116.00 | | 0047 | 726-01-00100 | Bedding Material | 8 | CUYD | 185.00 | 1,480.00 | 180.00 | 1,440.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 348,000.00 | 348,000.00 | 377,500.00 | 377,500.00 | | 0049 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 300 | SQFT | 30.00 | 9,000.00 | 30.00 | 9,000.00 | | 0050 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 38 | EACH | 255.00 | 9,690.00 | 225.00 | 8,550.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,341 | EACH | 7.25 | 16,972.25 | 4.00 | 9,364.00 | | 0052 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,514 | LNFT | 3.00 | 10,542.00 | 4.00 | 14,056.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,895 | LNFT | 13.00 | 37,635.00 | 15.00 | 43,425.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.453 | MILE | 5,250.00 | 65,378.25 | 4,600.00 | 57,283.80 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.408 | MILE | 1,550.00 | 8,382.40 | 1,300.00 | 7,030.40 | | 0056 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.204 | MILE | 5,200.00 | 1,060.80 | 8,100.00 | 1,652.40 | | 0057 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 12 | EACH | 305.00 | 3,660.00 | 326.00 | 3,912.00 | | 0058 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 20 | EACH | 365.00 | 7,300.00 | 350.00 | 7,000.00 | | 0059 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 315.00 | 5,040.00 | 325.00 | 5,200.00 | | 0060 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 9 | EACH | 315.00 | 2,835.00 | 325.00 | 2,925.00 | | 0061 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 365.00 | 1,460.00 | 450.00 | 1,800.00 | | 0062 | 732-04-15000 | Plastic Pavement Legends and Symbols (OK) | 2 | EACH | 415.00 | 830.00 | 500.00 | 1,000.00 | | 0063 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 30 | EACH | 315.00 | 9,450.00 | 500.00 | 15,000.00 | | 0064 | 732-05-00100 | Removal of Existing Markings | 1.505 | MILE | 7,500.00 | 11,287.50 | 7,500.00 | 11,287.50 | | 0065 | 735-01-00100 | Mailboxes | 83 | EACH | 25.00 | 2,075.00 | 22.00 | 1,826.00 | | 0066 | 735-02-00100 | Mailbox Supports (Single) | 63 | EACH | 205.00 | 12,915.00 | 250.00 | 15,750.00 | | 0067 | 735-03-00100 | Mailbox Supports (Double) | 10 | EACH | 415.00 | 4,150.00 | 350.00 | 3,500.00 | | 0068 | 736-01-00100 | Trenching and Backfilling | 150 | LNFT | 15.00 | 2,250.00 | 9.00 | 1,350.00 | | 0069 | 736-09-00100 | Loop Detector | 1,512 | LNFT | 41.00 | 61,992.00 | 35.00 | 52,920.00 | | 0070 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,600.00 | 1,600.00 | 1,900.00 | 1,900.00 | | 0071 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 150 | LNFT | 6.00 | 900.00 | 12.00 | 1,800.00 | | 0072 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0073 | 741-35-00100 | Adjust Valve or Meter Box | 22 | EACH | 170.00 | 3,740.00 | 1,200.00 | 26,400.00 | | 0074 | NS-201-00005 | Arborist Services | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0075 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 64,862 | LNFT | 1.75 | 113,508.50 | 1.90 | 123,237.80 | | 0076 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 38,040 | LNFT | 1.80 | 68,472.00 | 1.90 | 72,276.00 | | 0077 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 102,902 | LNFT | 0.85 | 87,466.70 | 0.90 | 92,611.80 | | 0078 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,050 | INLF | 0.80 | 2,440.00 | 2.00 | 6,100.00 | | 0079 | NS-602-00001 | Milling Concrete Pavement | 955 | SQYD | 11.50 | 10,982.50 | 65.00 | 62,075.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,999,991.33 | | 5,499,877.68 |
|