Proposal:H.014773.6
Parish:Jefferson
Routes:LA 611-9
Description:LA 611-9: US 61 - 17 ST CANAL BR (ORLEANS)
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$2,430,809.50
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $2,831,444.50 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,272,615.17 |
| 3 | 73475 | Madden Gulf Coast, LLC | $3,557,160.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | - 3 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 4.764 | LUMP | 80,000.00 | 80,000.00 | 47,640.00 | 47,640.00 | 85,000.00 | 85,000.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 850 | LNFT | 30.00 | 25,500.00 | 35.00 | 29,750.00 | 30.00 | 25,500.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 5,793.1 | TON | 145.00 | 839,999.50 | 205.00 | 1,187,585.50 | 174.00 | 1,007,999.40 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 196.7 | TON | 300.00 | 59,010.00 | 535.00 | 105,234.50 | 447.00 | 87,924.90 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 53,928 | SQYD | 4.00 | 215,712.00 | 7.50 | 404,460.00 | 8.00 | 431,424.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,000 | CUYD | 0.01 | -30.00 | 10.00 | -30,000.00 | 0.01 | -30.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,325 | SQYD | 145.00 | 192,125.00 | 230.00 | 304,750.00 | 212.00 | 280,900.00 | | 0008 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,600 | LNFT | 3.00 | 4,800.00 | 2.89 | 4,624.00 | 3.75 | 6,000.00 | | 0009 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,700 | LNFT | 3.00 | 5,100.00 | 2.89 | 4,913.00 | 4.50 | 7,650.00 | | 0010 | 602-03-00100 | Cleaning and Sealing Random Cracks | 500 | LNFT | 5.00 | 2,500.00 | 3.50 | 1,750.00 | 5.00 | 2,500.00 | | 0011 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | 550.9 | SQYD | 275.00 | 151,497.50 | 420.00 | 231,378.00 | 250.00 | 137,725.00 | | 0012 | 602-16-00102 | High Early Strength (HES) Concrete Pavement Partial Depth Patching | 32.4 | SQYD | 325.00 | 10,530.00 | 420.00 | 13,608.00 | 300.00 | 9,720.00 | | 0013 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 37 | EACH | 4,000.00 | 148,000.00 | 1,575.00 | 58,275.00 | 4,000.00 | 148,000.00 | | 0014 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 6 | EACH | 3,000.00 | 18,000.00 | 4,500.00 | 27,000.00 | 3,500.00 | 21,000.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,000.00 | 6,000.00 | 1,750.00 | 5,250.00 | 1,500.00 | 4,500.00 | | 0016 | 707-01-00100 | Concrete Curb | 850 | LNFT | 55.00 | 46,750.00 | 70.00 | 59,500.00 | 60.00 | 51,000.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 350,000.00 | 350,000.00 | 322,000.00 | 322,000.00 | 560,000.00 | 560,000.00 | | 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,392 | LNFT | 0.50 | 2,196.00 | 0.50 | 2,196.00 | 0.10 | 439.20 | | 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,070 | LNFT | 1.00 | 5,070.00 | 1.00 | 5,070.00 | 0.20 | 1,014.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.706 | MILE | 500.00 | 2,853.00 | 1,000.00 | 5,706.00 | 400.00 | 2,282.40 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.162 | MILE | 1,000.00 | 162.00 | 1,000.00 | 162.00 | 1,000.00 | 162.00 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 17.51 | MILE | 750.00 | 13,132.50 | 1,250.00 | 21,887.50 | 1,000.00 | 17,510.00 | | 0023 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 10 | EACH | 50.00 | 500.00 | 50.00 | 500.00 | 25.00 | 250.00 | | 0024 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 86 | EACH | 50.00 | 4,300.00 | 50.00 | 4,300.00 | 86.00 | 7,396.00 | | 0025 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 50.00 | 300.00 | 50.00 | 300.00 | 25.00 | 150.00 | | 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 10 | EACH | 50.00 | 500.00 | 50.00 | 500.00 | 25.00 | 250.00 | | 0027 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 50.00 | 200.00 | 50.00 | 200.00 | 45.00 | 180.00 | | 0028 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 14 | EACH | 50.00 | 700.00 | 50.00 | 700.00 | 45.00 | 630.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 1.9 | TON | 2,000.00 | 3,800.00 | 850.00 | 1,615.00 | 850.00 | 1,615.00 | | 0030 | 717-01-00100 | Seeding | 38 | LB | 35.00 | 1,330.00 | 25.00 | 950.00 | 25.00 | 950.00 | | 0031 | 718-01-00100 | Fertilizer | 1,300 | LB | 1.00 | 1,300.00 | 1.50 | 1,950.00 | 1.50 | 1,950.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 155,000.00 | 155,000.00 | 354,500.00 | 354,500.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,259 | EACH | 8.00 | 34,072.00 | 7.00 | 29,813.00 | 4.00 | 17,036.00 | | 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,320 | LNFT | 3.50 | 8,120.00 | 3.00 | 6,960.00 | 4.00 | 9,280.00 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 215 | LNFT | 15.00 | 3,225.00 | 12.00 | 2,580.00 | 15.00 | 3,225.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,320 | LNFT | 15.00 | 34,800.00 | 14.00 | 32,480.00 | 16.00 | 37,120.00 | | 0037 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 449 | LNFT | 5.00 | 2,245.00 | 4.00 | 1,796.00 | 4.00 | 1,796.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.755 | MILE | 6,000.00 | 52,530.00 | 5,000.00 | 43,775.00 | 4,800.00 | 42,024.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.081 | MILE | 5,000.00 | 405.00 | 1,500.00 | 121.50 | 1,200.00 | 97.20 | | 0040 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 5 | EACH | 400.00 | 2,000.00 | 350.00 | 1,750.00 | 350.00 | 1,750.00 | | 0041 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 43 | EACH | 350.00 | 15,050.00 | 300.00 | 12,900.00 | 325.00 | 13,975.00 | | 0042 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 350.00 | 1,050.00 | 30.00 | 90.00 | 325.00 | 975.00 | | 0043 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 350.00 | 1,750.00 | 300.00 | 1,500.00 | 650.00 | 3,250.00 | | 0044 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 550.00 | 1,100.00 | 500.00 | 1,000.00 | 1,200.00 | 2,400.00 | | 0045 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 7 | EACH | 650.00 | 4,550.00 | 600.00 | 4,200.00 | 1,200.00 | 8,400.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.104 | MILE | 30,000.00 | 3,120.00 | 25,000.00 | 2,600.00 | 25,000.00 | 2,600.00 | | 0047 | 736-01-00100 | Trenching and Backfilling | 40 | LNFT | 20.00 | 800.00 | 7.00 | 280.00 | 7.00 | 280.00 | | 0048 | 736-09-00100 | Loop Detector | 2,585 | LNFT | 45.00 | 116,325.00 | 30.33 | 78,403.05 | 30.33 | 78,403.05 | | 0049 | 736-10-00200 | Underground Junction Box (Type E) | 7 | EACH | 1,750.00 | 12,250.00 | 1,247.00 | 8,729.00 | 1,247.00 | 8,729.00 | | 0050 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 57 | LNFT | 10.00 | 570.00 | 5.66 | 322.62 | 5.66 | 322.62 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | 52,000.00 | 52,000.00 | | 0052 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 300 | LNFT | 2.50 | 750.00 | 2.25 | 675.00 | 7.00 | 2,100.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 198 | LNFT | 2.50 | 495.00 | 2.25 | 445.50 | 7.00 | 1,386.00 | | 0054 | NS-744-00600 | Lane Separator System (Furnish and Install) | 96 | LNFT | 150.00 | 14,400.00 | 140.00 | 13,440.00 | 145.00 | 13,920.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,831,444.50 | | 3,272,615.17 | | 3,557,160.77 |
|