Proposal:H.013537.6
Parish:Lafayette
Routes:LA 93
Description:LA 93: COULEE ILE DES CANNES BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$2,646,121.10
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $1,635,905.30 |
| 2 | 46716 | BRUDD CONSTRUCTION CO., LLC | $1,789,700.86 |
| 3 | 54206 | Southern Constructors, LLC | $2,199,547.80 |
| 4 | 48896 | Command Construction Industries LLC | $2,347,705.30 |
| 5 | 33663 | Glenn Lege Construction LLC | $4,084,902.53 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - BRUDD CONSTRUCTION CO., LLC | - 3 - Southern Constructors, LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.173 | LUMP | 5,000.00 | 5,000.00 | 6,447.00 | 6,447.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 136 | SQYD | 4.50 | 612.00 | 8.18 | 1,112.48 | 28.00 | 3,808.00 | 15.00 | 2,040.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,033.9 | SQYD | 12.00 | 12,406.80 | 18.26 | 18,879.01 | 22.00 | 22,745.80 | 15.00 | 15,508.50 | | 0004 | 202-02-04501 | Removal of Bridge (RECALL NO. 007190; 4-72” EQUIV. CMP ARCH) | 2,460 | LUMP | 8,000.00 | 8,000.00 | 7,848.00 | 7,848.00 | 30,000.00 | 30,000.00 | 1,000.00 | 1,000.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" Equiv. Arch CMP | 188 | LNFT | 41.00 | 7,708.00 | 1.18 | 221.84 | 70.00 | 13,160.00 | 50.00 | 9,400.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" Equiv. Arch CMP | 69 | LNFT | 28.00 | 1,932.00 | 7.09 | 489.21 | 70.00 | 4,830.00 | 50.00 | 3,450.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 36" Equiv. Arch RCP | 13 | LNFT | 40.00 | 520.00 | 25.00 | 325.00 | 70.00 | 910.00 | 50.00 | 650.00 | | 0008 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 2,100.00 | 4,200.00 | 7,471.00 | 14,942.00 | 5,000.00 | 10,000.00 | 5,000.00 | 10,000.00 | | 0009 | 202-02-38200 | Removal of Signs | 17 | EACH | 35.00 | 595.00 | 150.50 | 2,558.50 | 300.00 | 5,100.00 | 1.00 | 17.00 | | 0010 | 202-03-38000 | Relocation of Sign | 2 | EACH | 180.00 | 360.00 | 250.83 | 501.66 | 1,000.00 | 2,000.00 | 100.00 | 200.00 | | 0011 | 203-01-00100 | General Excavation | 957 | CUYD | 20.00 | 19,140.00 | 10.82 | 10,354.74 | 25.00 | 23,925.00 | 1.00 | 957.00 | | 0012 | 203-02-00100 | Drainage Excavation | 194 | CUYD | 40.00 | 7,760.00 | 13.34 | 2,587.96 | 45.00 | 8,730.00 | 50.00 | 9,700.00 | | 0013 | 203-03-00100 | Embankment | 744 | CUYD | 41.00 | 30,504.00 | 28.28 | 21,040.32 | 50.00 | 37,200.00 | 50.00 | 37,200.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 375.00 | 1,500.00 | 177.00 | 708.00 | 800.00 | 3,200.00 | 250.00 | 1,000.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 640 | LNFT | 2.50 | 1,600.00 | 2.36 | 1,510.40 | 5.00 | 3,200.00 | 5.00 | 3,200.00 | | 0016 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,105 | SQYD | 67.00 | 74,035.00 | 100.00 | 110,500.00 | 95.00 | 104,975.00 | 250.00 | 276,250.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 10 | CUYD | 167.00 | 1,670.00 | 130.00 | 1,300.00 | 350.00 | 3,500.00 | 100.00 | 1,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 361.5 | TON | 232.00 | 83,868.00 | 715.00 | 258,472.50 | 250.00 | 90,375.00 | 250.00 | 90,375.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 59.8 | TON | 330.00 | 19,734.00 | 740.00 | 44,252.00 | 250.00 | 14,950.00 | 250.00 | 14,950.00 | | 0020 | 701-03-01044 | Storm Drain Pipe (24" RCP/RPVCP/CPPPDW) | 54 | LNFT | 106.00 | 5,724.00 | 145.83 | 7,874.82 | 200.00 | 10,800.00 | 350.00 | 18,900.00 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 224 | LNFT | 120.00 | 26,880.00 | 121.23 | 27,155.52 | 200.00 | 44,800.00 | 400.00 | 89,600.00 | | 0022 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 36 | LNFT | 250.00 | 9,000.00 | 287.41 | 10,346.76 | 300.00 | 10,800.00 | 500.00 | 18,000.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 533 | LNFT | 1.00 | 533.00 | 2.36 | 1,257.88 | 15.00 | 7,995.00 | 10.00 | 5,330.00 | | 0024 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 4,600.00 | 9,200.00 | 6,966.00 | 13,932.00 | 9,000.00 | 18,000.00 | 10,000.00 | 20,000.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 9,400.00 | 9,400.00 | 8,385.00 | 8,385.00 | 9,000.00 | 9,000.00 | 10,000.00 | 10,000.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 8,400.00 | 8,400.00 | 9,039.50 | 9,039.50 | 9,000.00 | 9,000.00 | 12,500.00 | 12,500.00 | | 0027 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 6,050.00 | 6,050.00 | 8,858.80 | 8,858.80 | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 425.00 | 3,400.00 | 708.00 | 5,664.00 | 800.00 | 6,400.00 | 750.00 | 6,000.00 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 225.00 | 1,800.00 | 236.00 | 1,888.00 | 300.00 | 2,400.00 | 250.00 | 2,000.00 | | 0030 | 710-01-00100 | Flowable Fill | 74 | CUYD | 400.00 | 29,600.00 | 185.66 | 13,738.84 | 300.00 | 22,200.00 | 400.00 | 29,600.00 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 627 | SQYD | 68.50 | 42,949.50 | 63.63 | 39,896.01 | 175.00 | 109,725.00 | 200.00 | 125,400.00 | | 0032 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 101 | SQYD | 135.00 | 13,635.00 | 98.08 | 9,906.08 | 180.00 | 18,180.00 | 200.00 | 20,200.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 728 | SQYD | 1.65 | 1,201.20 | 2.81 | 2,045.68 | 12.00 | 8,736.00 | 3.00 | 2,184.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,000.00 | 28,000.00 | 38,679.22 | 38,679.22 | 100,000.00 | 100,000.00 | 40,000.00 | 40,000.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,280 | LNFT | 1.30 | 1,664.00 | 1.18 | 1,510.40 | 3.00 | 3,840.00 | 1.00 | 1,280.00 | | 0036 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 17 | EACH | 11.00 | 187.00 | 29.50 | 501.50 | 100.00 | 1,700.00 | 15.00 | 255.00 | | 0037 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 7,000.00 | 49,000.00 | 7,933.81 | 55,536.67 | 9,500.00 | 66,500.00 | 3,000.00 | 21,000.00 | | 0038 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 35 | SQYD | 7.00 | 245.00 | 5.90 | 206.50 | 50.00 | 1,750.00 | 15.00 | 525.00 | | 0039 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 315 | SQYD | 4.20 | 1,323.00 | 5.90 | 1,858.50 | 18.00 | 5,670.00 | 5.00 | 1,575.00 | | 0040 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 12,500.00 | 12,500.00 | 8,850.00 | 8,850.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | | 0041 | 726-01-00100 | Bedding Material | 212.8 | CUYD | 150.00 | 31,920.00 | 131.12 | 27,902.34 | 180.00 | 38,304.00 | 200.00 | 42,560.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 130,616.00 | 130,616.00 | 225,000.00 | 225,000.00 | 240,000.00 | 240,000.00 | | 0043 | 729-01-00100 | Sign (Type A) | 36.3 | SQFT | 52.00 | 1,887.60 | 41.30 | 1,499.19 | 50.00 | 1,815.00 | 100.00 | 3,630.00 | | 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 155.00 | 620.00 | 112.10 | 448.40 | 400.00 | 1,600.00 | 250.00 | 1,000.00 | | 0045 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 11 | EACH | 155.00 | 1,705.00 | 413.29 | 4,546.19 | 500.00 | 5,500.00 | 250.00 | 2,750.00 | | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 17 | EACH | 15.50 | 263.50 | 29.50 | 501.50 | 50.00 | 850.00 | 25.00 | 425.00 | | 0047 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 41 | LNFT | 20.50 | 840.50 | 29.50 | 1,209.50 | 85.00 | 3,485.00 | 25.00 | 1,025.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.244 | MILE | 8,600.00 | 2,098.40 | 8,850.00 | 2,159.40 | 18,000.00 | 4,392.00 | 7,500.00 | 1,830.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.67 | ACRE | 3,500.00 | 2,345.00 | 3,835.00 | 2,569.45 | 7,500.00 | 5,025.00 | 5,000.00 | 3,350.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,052.23 | 12,052.23 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | | 0051 | 805-15-01600 | Reinforced Concrete Box Culverts (Precast) (10' x 6') | 375 | LNFT | 2,000.00 | 750,000.00 | 1,875.15 | 703,181.25 | 2,100.00 | 787,500.00 | 2,400.00 | 900,000.00 | | 0052 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Quantity of steel= 6593 LBS, Quantity of concrete = 40.00 CUYDS ) | 2 | EACH | 95,000.00 | 190,000.00 | 60,179.95 | 120,359.90 | 85,000.00 | 170,000.00 | 75,000.00 | 150,000.00 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 326 | INLF | 2.00 | 652.00 | 10.90 | 3,553.40 | 5.00 | 1,630.00 | 2.00 | 652.00 | | 0054 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 868.4 | INLF | 2.00 | 1,736.80 | 9.12 | 7,919.81 | 5.00 | 4,342.00 | 2.00 | 1,736.80 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,635,905.30 | | 1,789,700.86 | | 2,199,547.80 | | 2,347,705.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Glenn Lege Construction LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.173 | LUMP | 21,757.05 | 21,757.05 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 136 | SQYD | 58.55 | 7,962.80 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,033.9 | SQYD | 22.14 | 22,890.55 | | 0004 | 202-02-04501 | Removal of Bridge (RECALL NO. 007190; 4-72” EQUIV. CMP ARCH) | 2,460 | LUMP | 9,857.14 | 9,857.14 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" Equiv. Arch CMP | 188 | LNFT | 84.28 | 15,844.64 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" Equiv. Arch CMP | 69 | LNFT | 48.58 | 3,352.02 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 36" Equiv. Arch RCP | 13 | LNFT | 48.58 | 631.54 | | 0008 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 10,727.20 | 21,454.40 | | 0009 | 202-02-38200 | Removal of Signs | 17 | EACH | 107.13 | 1,821.21 | | 0010 | 202-03-38000 | Relocation of Sign | 2 | EACH | 221.43 | 442.86 | | 0011 | 203-01-00100 | General Excavation | 957 | CUYD | 60.72 | 58,109.04 | | 0012 | 203-02-00100 | Drainage Excavation | 194 | CUYD | 60.72 | 11,779.68 | | 0013 | 203-03-00100 | Embankment | 744 | CUYD | 91.51 | 68,083.44 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 189.75 | 759.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 640 | LNFT | 2.53 | 1,619.20 | | 0016 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,105 | SQYD | 90.29 | 99,770.45 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 10 | CUYD | 214.28 | 2,142.80 | | 0018 | 502-01-00100 | Asphalt Concrete | 361.5 | TON | 155.15 | 56,086.73 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 59.8 | TON | 303.22 | 18,132.56 | | 0020 | 701-03-01044 | Storm Drain Pipe (24" RCP/RPVCP/CPPPDW) | 54 | LNFT | 190.32 | 10,277.28 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 224 | LNFT | 240.98 | 53,979.52 | | 0022 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 36 | LNFT | 438.24 | 15,776.64 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 533 | LNFT | 71.43 | 38,072.19 | | 0024 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 9,741.71 | 19,483.42 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 8,763.92 | 8,763.92 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 10,079.52 | 10,079.52 | | 0027 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 24,060.70 | 24,060.70 | | 0028 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 516.12 | 4,128.96 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 617.32 | 4,938.56 | | 0030 | 710-01-00100 | Flowable Fill | 74 | CUYD | 303.60 | 22,466.40 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 627 | SQYD | 201.43 | 126,296.61 | | 0032 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 101 | SQYD | 271.44 | 27,415.44 | | 0033 | 711-04-00100 | Geotextile Fabric | 728 | SQYD | 3.14 | 2,285.92 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 92,255.19 | 92,255.19 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,280 | LNFT | 1.58 | 2,022.40 | | 0036 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 17 | EACH | 12.65 | 215.05 | | 0037 | 713-11-00100 | Portable Changeable Message Signs | 7 | EACH | 7,590.00 | 53,130.00 | | 0038 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 35 | SQYD | 6.33 | 221.55 | | 0039 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 315 | SQYD | 6.33 | 1,993.95 | | 0040 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 23,276.00 | 23,276.00 | | 0041 | 726-01-00100 | Bedding Material | 212.8 | CUYD | 202.40 | 43,070.72 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 657,800.00 | 657,800.00 | | 0043 | 729-01-00100 | Sign (Type A) | 36.3 | SQFT | 50.00 | 1,815.00 | | 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 175.00 | 700.00 | | 0045 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 11 | EACH | 100.00 | 1,100.00 | | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 17 | EACH | 18.98 | 322.66 | | 0047 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 41 | LNFT | 25.30 | 1,037.30 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.244 | MILE | 10,752.50 | 2,623.61 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.67 | ACRE | 4,111.25 | 2,754.54 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,216.00 | 18,216.00 | | 0051 | 805-15-01600 | Reinforced Concrete Box Culverts (Precast) (10' x 6') | 375 | LNFT | 5,821.49 | 2,183,058.75 | | 0052 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Quantity of steel= 6593 LBS, Quantity of concrete = 40.00 CUYDS ) | 2 | EACH | 102,313.20 | 204,626.40 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 326 | INLF | 3.22 | 1,049.72 | | 0054 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 868.4 | INLF | 3.56 | 3,091.50 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,084,902.53 |
|