Proposal:H.015677.6
Parish:Caddo
Routes:I-49
Description:I-49: SB EXIT RAMP AT SOUTHERN LOOP
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,064,111.40
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $1,482,537.52 |
| 2 | 67822 | Earnest Contracting LLC | $1,938,581.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.568 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-38260 | Removal of Sign Support Footings | 2 | EACH | 1,100.00 | 2,200.00 | 5,000.00 | 10,000.00 | | 0003 | 202-03-38000 | Relocation of Sign Southern Loop Left/Wrong Way & Informational Food Sign | 2 | EACH | 1,375.00 | 2,750.00 | 10,000.00 | 20,000.00 | | 0004 | 202-03-38020 | Relocation of Sign Pole Southern Loop Left/Wrong Way & Informational Food Sign | 4 | EACH | 3,850.00 | 15,400.00 | 10,000.00 | 40,000.00 | | 0005 | 203-01-00100 | General Excavation | 2,233 | CUYD | 38.50 | 85,970.50 | 50.00 | 111,650.00 | | 0006 | 203-03-00100 | Embankment | 390 | CUYD | 55.00 | 21,450.00 | 75.00 | 29,250.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 40 | EACH | 33.00 | 1,320.00 | 10.00 | 400.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 7,950 | LNFT | 3.30 | 26,235.00 | 5.00 | 39,750.00 | | 0009 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,561.9 | SQYD | 66.00 | 169,085.40 | 85.00 | 217,761.50 | | 0010 | 304-01-00100 | Lime | 36.3 | TON | 825.00 | 29,947.50 | 500.00 | 18,150.00 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 2,562 | SQYD | 27.50 | 70,455.00 | 30.00 | 76,860.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 2,072.4 | TON | 200.00 | 414,480.00 | 325.00 | 673,530.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 7,654 | SQYD | 8.00 | 61,232.00 | 12.00 | 91,848.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -326 | CUYD | 0.01 | -3.26 | 0.10 | -32.60 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 190.00 | 47,500.00 | 200.00 | 50,000.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 85,000.00 | 85,000.00 | | 0019 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,535 | LNFT | 0.55 | 844.25 | 0.50 | 767.50 | | 0020 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 22 | LNFT | 11.00 | 242.00 | 10.00 | 220.00 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.33 | MILE | 900.00 | 297.00 | 500.00 | 165.00 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.165 | MILE | 285.00 | 47.03 | 250.00 | 41.25 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.828 | MILE | 1,100.00 | 3,110.80 | 1,000.00 | 2,828.00 | | 0024 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 2 | EACH | 55.00 | 110.00 | 50.00 | 100.00 | | 0025 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 55.00 | 165.00 | 50.00 | 150.00 | | 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 55.00 | 55.00 | 50.00 | 50.00 | | 0027 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 161 | EACH | 275.00 | 44,275.00 | 1,000.00 | 161,000.00 | | 0028 | 716-01-00100 | Mulch (Vegetative) | 1.1 | TON | 1,200.00 | 1,320.00 | 3,000.00 | 3,300.00 | | 0029 | 717-01-00100 | Seeding | 34 | LB | 35.00 | 1,190.00 | 40.00 | 1,360.00 | | 0030 | 718-01-00100 | Fertilizer | 570 | LB | 2.25 | 1,282.50 | 2.50 | 1,425.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.265 | MILE | 21,600.00 | 5,724.00 | 20,000.00 | 5,300.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 90,000.00 | 90,000.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 251 | EACH | 11.00 | 2,761.00 | 10.00 | 2,510.00 | | 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,535 | LNFT | 11.00 | 16,885.00 | 10.00 | 15,350.00 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 575 | LNFT | 33.00 | 18,975.00 | 30.00 | 17,250.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 55.00 | 660.00 | 50.00 | 600.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.819 | MILE | 11,000.00 | 9,009.00 | 10,000.00 | 8,190.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.165 | MILE | 9,600.00 | 1,584.00 | 9,000.00 | 1,485.00 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.13 | MILE | 22,000.00 | 2,860.00 | 20,000.00 | 2,600.00 | | 0040 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 825.00 | 1,650.00 | 750.00 | 1,500.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 660.00 | 1,980.00 | 600.00 | 1,800.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | | 0043 | 735-01-00100 | Mailboxes | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 500.00 | 500.00 | 1,500.00 | 1,500.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | | 0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 46,563 | INLF | 0.60 | 27,937.80 | 0.75 | 34,922.25 | | 0047 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 15,000.00 | 30,000.00 | 12,500.00 | 25,000.00 | | 0048 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 6 | LNFT | 825.00 | 4,950.00 | 500.00 | 3,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,482,537.52 | | 1,938,581.90 |
|