Proposal:H.015322.6
Parish:Jackson
Routes:LA 147
Description:LA 147: US 167 - BIENVILLE PARISH LINE
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,365,533.60
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $1,215,095.38 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,340,221.94 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1.538 | LUMP | 35,000.00 | 35,000.00 | 29,595.43 | 29,595.43 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 37 | LNFT | 26.00 | 962.00 | 69.27 | 2,562.99 | | 0003 | 202-02-14500 | Removal of Guard Rail | 1,036 | LNFT | 15.00 | 15,540.00 | 16.37 | 16,959.32 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 40 | LNFT | 15.00 | 600.00 | 9.51 | 380.40 | | 0005 | 502-01-00100 | Asphalt Concrete | 487.8 | TON | 285.00 | 139,023.00 | 311.70 | 152,047.26 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 6.4 | TON | 285.00 | 1,824.00 | 1,929.73 | 12,350.27 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 5,992 | SQYD | 7.25 | 43,442.00 | 5.14 | 30,798.88 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -187 | CUYD | 1.00 | -187.00 | 19.80 | -3,702.60 | | 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 241 | SQYD | 275.00 | 66,275.00 | 325.59 | 78,467.19 | | 0010 | 701-08-00100 | Relaying Pipe 24" RCP | 4 | LNFT | 1,450.00 | 5,800.00 | 566.72 | 2,266.88 | | 0011 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,500.00 | 2,500.00 | 2,770.64 | 2,770.64 | | 0012 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 6,500.00 | 6,500.00 | 9,445.35 | 9,445.35 | | 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 525 | LNFT | 35.00 | 18,375.00 | 41.56 | 21,819.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 163.72 | 32,744.00 | | 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,850.00 | 30,800.00 | 4,722.68 | 37,781.44 | | 0016 | 707-01-00100 | Concrete Curb | 37 | LNFT | 75.00 | 2,775.00 | 107.05 | 3,960.85 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 74,901.91 | 74,901.91 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 1.00 | 96.00 | 0.63 | 60.48 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.236 | MILE | 950.00 | 4,024.20 | 193.67 | 820.39 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.05 | MILE | 750.00 | 1,537.50 | 755.63 | 1,549.04 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.909 | MILE | 1,200.00 | 16,690.80 | 1,258.56 | 17,505.31 | | 0022 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 65.00 | 260.00 | 62.97 | 251.88 | | 0023 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 978 | EACH | 3.50 | 3,423.00 | 8.90 | 8,704.20 | | 0024 | 724-01-00100 | Rumble Strips (Centerline) | 3.4 | MILE | 300.00 | 1,020.00 | 1,259.38 | 4,281.89 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.8 | MILE | 300.00 | 2,040.00 | 1,259.38 | 8,563.78 | | 0026 | 726-01-00100 | Bedding Material | 2.9 | CUYD | 250.00 | 725.00 | 220.39 | 639.13 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 115,000.00 | 115,000.00 | 121,685.60 | 121,685.60 | | 0028 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 125.00 | 2,000.00 | 144.83 | 2,317.28 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 145.00 | 1,160.00 | 163.72 | 1,309.76 | | 0030 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 2,331 | EACH | 7.85 | 18,298.35 | 8.19 | 19,090.89 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 778 | EACH | 15.00 | 11,670.00 | 17.00 | 13,226.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 16.00 | 768.00 | 17.00 | 816.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.849 | MILE | 5,200.00 | 66,814.80 | 5,663.24 | 72,766.97 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.05 | MILE | 2,200.00 | 4,510.00 | 2,455.79 | 5,034.37 | | 0035 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,200.00 | 2,400.00 | 1,259.38 | 2,518.76 | | 0036 | 732-05-00100 | Removal of Existing Markings | 3.706 | MILE | 5,250.00 | 19,456.50 | 6,286.71 | 23,298.55 | | 0037 | 735-01-00100 | Mailboxes | 9 | EACH | 26.00 | 234.00 | 31.48 | 283.32 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 300.00 | 2,100.00 | 629.69 | 4,407.83 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 400.00 | 400.00 | 755.63 | 755.63 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,548.78 | 6,548.78 | | 0041 | NS-500-00380 | Micro-surfacing Aggregate | 1,153.1 | TON | 165.00 | 190,261.50 | 195.76 | 225,730.86 | | 0042 | NS-500-00400 | Micro-surfacing Asphalt (Polymer Modified Emulsion) | 33,209.3 | GAL | 8.25 | 273,976.73 | 8.82 | 292,906.03 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,215,095.38 | | 1,340,221.94 |
|