Proposal:H.015321.6
Parish:Morehouse
Routes:LA 830-3
Description:LA 830-3: US 165 - US 425
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,193,237.10
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,344,433.27 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $2,438,134.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing 0.025 ACRES | 0.025 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | | 0002 | 201-01-00200 | Clearing and Grubbing (Selective) 2.685 ACRES | 2.685 | LUMP | 22,000.00 | 22,000.00 | 45,000.00 | 45,000.00 | | 0003 | 202-01-00100 | Removal of Structures and Obstructions CONCRETE RUBBLE | 1 | LUMP | 5,750.00 | 5,750.00 | 10,000.00 | 10,000.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 171.7 | SQYD | 125.00 | 21,462.50 | 25.00 | 4,292.50 | | 0005 | 202-02-06040 | Removal of Concrete Box Headwall (4) 8'x6' RCB WITH WINGWALLS | 1 | EACH | 12,500.00 | 12,500.00 | 10,000.00 | 10,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 278 | LNFT | 15.00 | 4,170.00 | 30.00 | 8,340.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" EQUIV. CMPA | 54 | LNFT | 22.00 | 1,188.00 | 20.00 | 1,080.00 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 60" EQUIV. CMPA | 40 | LNFT | 22.00 | 880.00 | 20.00 | 800.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 9 | EACH | 510.00 | 4,590.00 | 30.00 | 270.00 | | 0010 | 203-03-00100 | Embankment | 20 | CUYD | 530.00 | 10,600.00 | 40.00 | 800.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 51 | CUYD | 18.00 | 918.00 | 50.00 | 2,550.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 518 | LNFT | 5.00 | 2,590.00 | 7.00 | 3,626.00 | | 0013 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 73.3 | SQYD | 310.00 | 22,723.00 | 75.00 | 5,497.50 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 959 | CUYD | 115.00 | 110,285.00 | 95.00 | 91,105.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 70.00 | 2,800.00 | 125.00 | 5,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 5,606.7 | TON | 175.00 | 981,172.50 | 175.00 | 981,172.50 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 786.1 | TON | 250.00 | 196,525.00 | 225.00 | 176,872.50 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 44,025 | SQYD | 3.00 | 132,075.00 | 4.00 | 176,100.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,798 | CUYD | 1.00 | -1,798.00 | 1.00 | -1,798.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 348 | SQYD | 185.00 | 64,380.00 | 240.00 | 83,520.00 | | 0021 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 56 | LNFT | 400.00 | 22,400.00 | 600.00 | 33,600.00 | | 0022 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 40 | LNFT | 455.00 | 18,200.00 | 825.00 | 33,000.00 | | 0023 | 701-08-00100 | Relaying Pipe 24" RCP | 4 | LNFT | 265.00 | 1,060.00 | 300.00 | 1,200.00 | | 0024 | 701-08-00100 | Relaying Pipe 30" RCP | 4 | LNFT | 265.00 | 1,060.00 | 400.00 | 1,600.00 | | 0025 | 701-15-00100 | Concrete Collar | 6 | EACH | 2,500.00 | 15,000.00 | 2,000.00 | 12,000.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 108 | LNFT | 15.00 | 1,620.00 | 5.00 | 540.00 | | 0027 | 702-04-00100 | Adjusting Manholes | 3 | EACH | 4,100.00 | 12,300.00 | 3,000.00 | 9,000.00 | | 0028 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 75 | LNFT | 260.00 | 19,500.00 | 300.00 | 22,500.00 | | 0029 | 704-03-00100 | Blocked Out Guard rail | 56.3 | LNFT | 55.00 | 3,096.50 | 60.00 | 3,378.00 | | 0030 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 200.00 | 1,260.00 | 225.00 | 1,417.50 | | 0031 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,300.00 | 8,600.00 | 5,000.00 | 10,000.00 | | 0033 | 707-01-00100 | Concrete Curb | 42.5 | LNFT | 65.00 | 2,762.50 | 90.00 | 3,825.00 | | 0034 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 59 | SQYD | 185.00 | 10,915.00 | 150.00 | 8,850.00 | | 0035 | 711-04-00100 | Geotextile Fabric | 59 | SQYD | 6.00 | 354.00 | 6.00 | 354.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 90,000.00 | 90,000.00 | | 0037 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 192 | LNFT | 0.55 | 105.60 | 0.50 | 96.00 | | 0038 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.092 | MILE | 154.00 | 1,246.17 | 300.00 | 2,427.60 | | 0039 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.582 | MILE | 600.00 | 2,149.20 | 600.00 | 2,149.20 | | 0040 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.085 | MILE | 900.00 | 24,376.50 | 900.00 | 24,376.50 | | 0041 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 50.00 | 200.00 | 400.00 | 1,600.00 | | 0042 | 716-01-00100 | Mulch (Vegetative) | 2.2 | TON | 1,300.00 | 2,860.00 | 900.00 | 1,980.00 | | 0043 | 717-01-00100 | Seeding | 66 | LB | 20.00 | 1,320.00 | 15.00 | 990.00 | | 0044 | 718-01-00100 | Fertilizer | 1,116 | LB | 1.00 | 1,116.00 | 0.75 | 837.00 | | 0045 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 3,300.00 | 3,300.00 | 5,000.00 | 5,000.00 | | 0046 | 726-01-00100 | Bedding Material 24" THICK | 120.1 | CUYD | 175.00 | 21,017.50 | 130.00 | 15,613.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 211,000.00 | 211,000.00 | 225,000.00 | 225,000.00 | | 0048 | 729-01-00100 | Sign (Type A) | 101.9 | SQFT | 100.00 | 10,190.00 | 35.00 | 3,566.50 | | 0049 | 729-16-00200 | Object Marker Assembly (Type 2) | 11 | EACH | 120.00 | 1,320.00 | 100.00 | 1,100.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 130.00 | 780.00 | 140.00 | 840.00 | | 0051 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 180.00 | 1,620.00 | 300.00 | 2,700.00 | | 0052 | 731-02-00100 | Reflectorized Raised Pavement Markers | 769 | EACH | 5.00 | 3,845.00 | 7.00 | 5,383.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 96 | LNFT | 16.00 | 1,536.00 | 20.00 | 1,920.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.391 | MILE | 5,100.00 | 63,194.10 | 6,800.00 | 84,258.80 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.332 | MILE | 1,350.00 | 1,798.20 | 2,000.00 | 2,664.00 | | 0056 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | | 0057 | 735-01-00100 | Mailboxes | 98 | EACH | 5.00 | 490.00 | 30.00 | 2,940.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 82 | EACH | 315.00 | 25,830.00 | 300.00 | 24,600.00 | | 0059 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 525.00 | 4,200.00 | 450.00 | 3,600.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 27,000.00 | 27,000.00 | | 0061 | 805-16-01400 | Reinforced Concrete Box Culverts (Extension) (8' x 6') QUANTITY OF STEEL = 8,185 LBS, QUANTITY OF CONCRETE = 36.19 CY | 48 | LNFT | 2,500.00 | 120,000.00 | 3,000.00 | 144,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,344,433.27 | | 2,438,134.10 |
|