Proposal:H.014852.6
Parish:Washington
Routes:LA 21
Description:LA 21: CSLM 0.413 - BOGALUSA CL
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$11,957,021.34
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $10,098,629.67 |
| 2 | 73475 | Madden Gulf Coast, LLC | $11,157,496.57 |
| 3 | 62139 | Huey P. Stockstill, LLC | $13,077,527.67 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 720.4 | SQYD | 50.00 | 36,020.00 | 25.00 | 18,010.00 | 30.00 | 21,612.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 1,651 | LNFT | 7.00 | 11,557.00 | 7.00 | 11,557.00 | 9.00 | 14,859.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 38 | EACH | 60.00 | 2,280.00 | 60.00 | 2,280.00 | 75.00 | 2,850.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 623 | CUYD | 33.00 | 20,559.00 | 105.00 | 65,415.00 | 75.00 | 46,725.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 100 | LNFT | 25.00 | 2,500.00 | 10.00 | 1,000.00 | 15.00 | 1,500.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 145 | EACH | 152.00 | 22,040.00 | 145.00 | 21,025.00 | 190.00 | 27,550.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 12,540 | LNFT | 2.00 | 25,080.00 | 1.75 | 21,945.00 | 2.50 | 31,350.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 108 | CUYD | 90.00 | 9,720.00 | 50.00 | 5,400.00 | 250.00 | 27,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 61,768.6 | TON | 120.00 | 7,412,232.00 | 114.00 | 7,041,620.40 | 140.00 | 8,647,604.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,808.5 | TON | 300.00 | 542,550.00 | 93.00 | 168,190.50 | 260.00 | 470,210.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 346,906 | SQYD | 0.01 | 3,469.06 | 3.00 | 1,040,718.00 | 3.50 | 1,214,171.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -24,803 | CUYD | 0.01 | -248.03 | 0.01 | -248.03 | 0.01 | -248.03 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,967 | SQYD | 92.00 | 180,964.00 | 121.00 | 238,007.00 | 115.00 | 226,205.00 | | 0015 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,039 | SQYD | 147.00 | 152,733.00 | 155.00 | 161,045.00 | 175.00 | 181,825.00 | | 0016 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 284 | LNFT | 15.00 | 4,260.00 | 35.00 | 9,940.00 | 20.00 | 5,680.00 | | 0017 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 860.00 | 6,880.00 | 550.00 | 4,400.00 | 700.00 | 5,600.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 4,050.00 | 4,050.00 | 1,650.00 | 1,650.00 | 2,500.00 | 2,500.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,225.2 | LNFT | 32.00 | 39,206.40 | 31.25 | 38,287.50 | 40.00 | 49,008.00 | | 0020 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 43.6 | LNFT | 170.00 | 7,412.00 | 167.00 | 7,281.20 | 200.00 | 8,720.00 | | 0021 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 65 | LNFT | 56.00 | 3,640.00 | 55.00 | 3,575.00 | 70.00 | 4,550.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 118.00 | 11,800.00 | 117.00 | 11,700.00 | 140.00 | 14,000.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,500.00 | 7,000.00 | 3,495.00 | 6,990.00 | 5,000.00 | 10,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 6 | EACH | 3,500.00 | 21,000.00 | 3,100.00 | 18,600.00 | 4,000.00 | 24,000.00 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 720.4 | SQYD | 96.00 | 69,158.40 | 112.00 | 80,684.80 | 135.00 | 97,254.00 | | 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 328.8 | SQYD | 178.00 | 58,526.40 | 80.00 | 26,304.00 | 85.00 | 27,948.00 | | 0027 | 707-04-00100 | Asphalt Curb | 27 | LNFT | 370.00 | 9,990.00 | 500.00 | 13,500.00 | 300.00 | 8,100.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 508,000.00 | 508,000.00 | 600,000.00 | 600,000.00 | 330,000.00 | 330,000.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 40.05 | MILE | 1.00 | 40.05 | 400.00 | 16,020.00 | 300.00 | 12,015.00 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 39.54 | MILE | 1.00 | 39.54 | 600.00 | 23,724.00 | 900.00 | 35,586.00 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 79.596 | MILE | 1.00 | 79.60 | 900.00 | 71,636.40 | 1,000.00 | 79,596.00 | | 0032 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 15.00 | 90.00 | 15.00 | 90.00 | 25.00 | 150.00 | | 0033 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 15.00 | 45.00 | 15.00 | 45.00 | 25.00 | 75.00 | | 0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 25.00 | 150.00 | 25.00 | 150.00 | 25.00 | 150.00 | | 0035 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 30,000.00 | 60,000.00 | 12,000.00 | 24,000.00 | 25,000.00 | 50,000.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 26.702 | MILE | 875.00 | 23,364.25 | 1,100.00 | 29,372.20 | 600.00 | 16,021.20 | | 0037 | 726-01-00100 | Bedding Material | 1 | CUYD | 500.00 | 500.00 | 125.00 | 125.00 | 200.00 | 200.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 1,100,000.00 | 1,100,000.00 | 1,000,000.00 | 1,000,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 40 | EACH | 96.00 | 3,840.00 | 85.00 | 3,400.00 | 125.00 | 5,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 86.00 | 1,032.00 | 85.00 | 1,020.00 | 125.00 | 1,500.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,482 | EACH | 4.00 | 21,928.00 | 4.00 | 21,928.00 | 7.00 | 38,374.00 | | 0042 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 210 | LNFT | 4.00 | 840.00 | 4.00 | 840.00 | 3.00 | 630.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 354 | LNFT | 13.50 | 4,779.00 | 13.00 | 4,602.00 | 15.00 | 5,310.00 | | 0044 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 126 | LNFT | 5.00 | 630.00 | 4.00 | 504.00 | 4.00 | 504.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 26.36 | MILE | 4,500.00 | 118,620.00 | 4,400.00 | 115,984.00 | 6,000.00 | 158,160.00 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 13.266 | MILE | 1,150.00 | 15,255.90 | 1,100.00 | 14,592.60 | 1,500.00 | 19,899.00 | | 0047 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.241 | MILE | 8,100.00 | 1,952.10 | 8,000.00 | 1,928.00 | 1,500.00 | 361.50 | | 0048 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.089 | MILE | 25,000.00 | 2,225.00 | 25,000.00 | 2,225.00 | 10,000.00 | 890.00 | | 0049 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 305.00 | 610.00 | 300.00 | 600.00 | 350.00 | 700.00 | | 0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 350.00 | 350.00 | 300.00 | 300.00 | 350.00 | 350.00 | | 0051 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 600.00 | 1,200.00 | 450.00 | 900.00 | 350.00 | 700.00 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.089 | MILE | 20,000.00 | 1,780.00 | 15,000.00 | 1,335.00 | 9,000.00 | 801.00 | | 0053 | 735-01-00100 | Mailboxes | 118 | EACH | 25.00 | 2,950.00 | 1.00 | 118.00 | 25.00 | 2,950.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 118 | EACH | 215.00 | 25,370.00 | 220.00 | 25,960.00 | 300.00 | 35,400.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 16.08 | ACRE | 1,000.00 | 16,080.00 | 2,750.00 | 44,220.00 | 2,900.00 | 46,632.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,098,629.67 | | 11,157,496.57 | | 13,077,527.67 |
|