Proposal:H.014826.6
Parish:St. Martin
Routes:LA 328, LA 347
Description:LA 347: LA 351 - LA 328
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$9,025,183.11
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $10,060,608.26 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $10,804,710.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 389,877.60 | 389,877.60 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 86,469.28 | 86,469.28 | 100,000.00 | 100,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 2,052.4 | SQYD | 16.99 | 34,870.28 | 17.00 | 34,890.80 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 31.7 | SQYD | 16.99 | 538.58 | 17.00 | 538.90 | | 0005 | 202-02-03030 | Removal of Pavement Structure | 32,950.5 | SQYD | 5.57 | 183,534.29 | 7.75 | 255,366.38 | | 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,740.53 | 3,481.06 | 345.00 | 690.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,608 | SQYD | 17.88 | 28,751.04 | 19.50 | 31,356.00 | | 0008 | 202-02-06140 | Removal of Curbs (Concrete) | 172.5 | LNFT | 13.92 | 2,401.20 | 19.00 | 3,277.50 | | 0009 | 202-02-12000 | Removal of Fence | 72 | LNFT | 156.65 | 11,278.80 | 12.00 | 864.00 | | 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 41 | SQYD | 17.88 | 733.08 | 24.00 | 984.00 | | 0011 | 202-02-38220 | Removal of Sign Supports | 39 | EACH | 40.61 | 1,583.79 | 36.00 | 1,404.00 | | 0012 | 202-02-38360 | Removal of Sign Faces | 54 | EACH | 34.81 | 1,879.74 | 31.00 | 1,674.00 | | 0013 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 214,711.16 | 214,711.16 | 265,000.00 | 265,000.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 849 | LNFT | 20.66 | 17,540.34 | 9.50 | 8,065.50 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 82 | EACH | 174.05 | 14,272.10 | 155.00 | 12,710.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 10,267 | LNFT | 2.32 | 23,819.44 | 2.05 | 21,047.35 | | 0017 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 36,241 | SQYD | 11.18 | 405,174.38 | 15.50 | 561,735.50 | | 0018 | 303-02-00100 | Removal of Existing Patches | 835 | SQYD | 24.02 | 20,056.70 | 36.00 | 30,060.00 | | 0019 | 304-01-00100 | Lime | 128 | TON | 350.48 | 44,861.44 | 485.00 | 62,080.00 | | 0020 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 9,060 | SQYD | 8.77 | 79,456.20 | 4.00 | 36,240.00 | | 0021 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 36,241 | SQYD | 16.00 | 579,856.00 | 16.00 | 579,856.00 | | 0022 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,147 | CUYD | 79.89 | 171,523.83 | 127.00 | 272,669.00 | | 0023 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,102 | CUYD | 55.01 | 60,621.02 | 158.00 | 174,116.00 | | 0024 | 502-01-00100 | Asphalt Concrete | 13,149.7 | TON | 149.27 | 1,962,855.72 | 140.00 | 1,840,958.00 | | 0025 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,223.1 | TON | 180.60 | 220,891.86 | 200.00 | 244,620.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 9,534 | SQYD | 5.67 | 54,057.78 | 7.00 | 66,738.00 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -641 | CUYD | 0.01 | -6.41 | 0.01 | -6.41 | | 0028 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 221 | SQYD | 242.02 | 53,486.42 | 270.00 | 59,670.00 | | 0029 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 241.3 | SQYD | 119.05 | 28,726.77 | 210.00 | 50,673.00 | | 0030 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 6,381 | LNFT | 3.77 | 24,056.37 | 3.00 | 19,143.00 | | 0031 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,659 | LNFT | 4.35 | 11,566.65 | 3.20 | 8,508.80 | | 0032 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 38 | LNFT | 354.67 | 13,477.46 | 450.00 | 17,100.00 | | 0033 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 36 | LNFT | 358.30 | 12,898.80 | 360.00 | 12,960.00 | | 0034 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 36 | LNFT | 394.24 | 14,192.64 | 500.00 | 18,000.00 | | 0035 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 16 | LNFT | 101.88 | 1,630.08 | 755.00 | 12,080.00 | | 0036 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 16 | LNFT | 131.25 | 2,100.00 | 288.00 | 4,608.00 | | 0037 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 134 | LNFT | 168.44 | 22,570.96 | 171.00 | 22,914.00 | | 0038 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 876 | LNFT | 149.47 | 130,935.72 | 195.00 | 170,820.00 | | 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 5,684 | LNFT | 121.14 | 688,559.76 | 180.00 | 1,023,120.00 | | 0040 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 140 | LNFT | 170.84 | 23,917.60 | 300.00 | 42,000.00 | | 0041 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 192 | LNFT | 133.21 | 25,576.32 | 157.00 | 30,144.00 | | 0042 | 701-07-00300 | Yard Drain Pipe (8") | 96 | LNFT | 38.48 | 3,694.08 | 66.00 | 6,336.00 | | 0043 | 701-14-00100 | Cleaning Existing Pipes | 79 | LNFT | 7.66 | 605.14 | 675.00 | 53,325.00 | | 0044 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,392.42 | 1,392.42 | 850.00 | 850.00 | | 0045 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 493 | LNFT | 48.73 | 24,023.89 | 2.25 | 1,109.25 | | 0046 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 8,354.52 | 16,709.04 | 5,500.00 | 11,000.00 | | 0047 | 702-03-00010 | Catch Basins CB-14 (See Special Detail) | 62 | EACH | 7,936.79 | 492,080.98 | 8,500.00 | 527,000.00 | | 0048 | 702-03-00100 | Catch Basins (CB-01) | 48 | EACH | 4,525.37 | 217,217.76 | 5,250.00 | 252,000.00 | | 0049 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 15,247.00 | 60,988.00 | 6,150.00 | 24,600.00 | | 0050 | 702-03-00400 | Catch Basins (CB-05) | 10 | EACH | 2,332.30 | 23,323.00 | 5,000.00 | 50,000.00 | | 0051 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 9 | EACH | 417.73 | 3,759.57 | 750.00 | 6,750.00 | | 0052 | 702-04-00200 | Adjusting Catch Basins | 15 | EACH | 1,531.66 | 22,974.90 | 4,200.00 | 63,000.00 | | 0053 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 5,360.82 | 5,360.82 | 4,200.00 | 4,200.00 | | 0054 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 3,689.91 | 7,379.82 | 6,525.00 | 13,050.00 | | 0055 | 702-08-00200 | Side Drain Safety End (Type 2) | 33 | EACH | 10,512.77 | 346,921.41 | 7,500.00 | 247,500.00 | | 0056 | 706-02-00200 | Concrete Drive (6" Thick) | 3,856.1 | SQYD | 82.15 | 316,778.62 | 300.00 | 1,156,830.00 | | 0057 | 706-04-00110 | Curb Ramps Type 4 | 71.6 | SQYD | 112.34 | 8,043.54 | 255.00 | 18,258.00 | | 0058 | 706-04-00110 | Curb Ramps Type 7 | 159.6 | SQYD | 121.66 | 19,416.94 | 305.00 | 48,678.00 | | 0059 | 706-04-00110 | Curb Ramps Type 8 | 31 | SQYD | 120.44 | 3,733.64 | 230.00 | 7,130.00 | | 0060 | 707-03-00100 | Combination Concrete Curb and Gutter | 223.7 | LNFT | 37.60 | 8,411.12 | 43.00 | 9,619.10 | | 0061 | 712-02-00100 | Sacked Concrete Revetment | 7 | SQYD | 1,115.33 | 7,807.31 | 1,225.00 | 8,575.00 | | 0062 | 712-04-00100 | Flexible Revetment | 10 | SQYD | 829.88 | 8,298.80 | 685.00 | 6,850.00 | | 0063 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 842,930.69 | 842,930.69 | 155,000.00 | 155,000.00 | | 0064 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 174 | LNFT | 1.16 | 201.84 | 1.05 | 182.70 | | 0065 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.846 | MILE | 805.07 | 5,511.51 | 872.00 | 5,969.71 | | 0066 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.846 | MILE | 754.23 | 5,163.46 | 872.00 | 5,969.71 | | 0067 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.921 | MILE | 986.30 | 23,593.28 | 1,285.00 | 30,738.49 | | 0068 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 31,607.93 | 31,607.93 | 95,325.00 | 95,325.00 | | 0069 | 724-01-00100 | Rumble Strips (Centerline) | 2.733 | MILE | 1,160.35 | 3,171.24 | 2,400.00 | 6,559.20 | | 0070 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.466 | MILE | 1,160.35 | 6,342.47 | 1,025.00 | 5,602.65 | | 0071 | 726-01-00100 | Bedding Material 6" Thick | 904.7 | CUYD | 168.69 | 152,613.84 | 167.00 | 151,084.90 | | 0072 | 727-01-00100 | Mobilization | 1 | LUMP | 1,087,480.02 | 1,087,480.02 | 1,070,000.00 | 1,070,000.00 | | 0073 | 729-01-00100 | Sign (Type A) | 281.9 | SQFT | 34.81 | 9,812.94 | 30.75 | 8,668.43 | | 0074 | 729-16-00200 | Object Marker Assembly (Type 2) | 26 | EACH | 87.03 | 2,262.78 | 87.00 | 2,262.00 | | 0075 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 37 | EACH | 261.08 | 9,659.96 | 231.00 | 8,547.00 | | 0076 | 731-02-00100 | Reflectorized Raised Pavement Markers | 474 | EACH | 6.96 | 3,299.04 | 6.65 | 3,152.10 | | 0077 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 87 | LNFT | 17.41 | 1,514.67 | 12.35 | 1,074.45 | | 0078 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.131 | MILE | 4,931.49 | 40,097.95 | 5,125.00 | 41,671.38 | | 0079 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.282 | MILE | 1,740.53 | 3,971.89 | 1,540.00 | 3,514.28 | | 0080 | 735-01-00100 | Mailboxes | 95 | EACH | 29.01 | 2,755.95 | 26.00 | 2,470.00 | | 0081 | 735-02-00100 | Mailbox Supports (Single) | 95 | EACH | 232.07 | 22,046.65 | 205.00 | 19,475.00 | | 0082 | 739-01-00100 | Hydro-Seeding | 7.14 | ACRE | 3,074.93 | 21,955.00 | 2,720.00 | 19,420.80 | | 0083 | 740-01-00100 | Construction Layout | 1 | LUMP | 163,609.35 | 163,609.35 | 55,150.00 | 55,150.00 | | 0084 | 805-01-01000 | Class A1 Concrete (Headwalls) 43" Span x 26" Rise | 8.64 | CUYD | 3,972.57 | 34,323.00 | 4,500.00 | 38,880.00 | | 0085 | 806-01-00100 | Deformed Reinforcing Steel | 489 | LB | 4.18 | 2,044.02 | 6.50 | 3,178.50 | | 0086 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 39,887 | SQYD | 7.55 | 301,146.85 | 8.50 | 339,039.50 | | 0087 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 845 | LNFT | 4.64 | 3,920.80 | 2.75 | 2,323.75 | | 0088 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,099 | LNFT | 4.64 | 5,099.36 | 2.85 | 3,132.15 | | 0089 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,944 | LNFT | 3.48 | 6,765.12 | 5.65 | 10,983.60 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,060,608.26 | | 10,804,710.97 |
|