Proposal:H.014682.6
Parish:Jefferson
Description:VETERANS BLVD: DAVID DR - CLEARVIEW PKWY
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$3,484,852.93
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $3,321,908.25 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,981,171.00 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $4,811,936.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 56.7 | SQYD | 50.00 | 2,835.00 | 10.00 | 567.00 | 125.00 | 7,087.50 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 258 | LNFT | 20.00 | 5,160.00 | 62.00 | 15,996.00 | 25.00 | 6,450.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 412 | SQYD | 25.00 | 10,300.00 | 72.00 | 29,664.00 | 30.00 | 12,360.00 | | 0004 | 202-02-06102 | Removal of Incidental Concrete Paving | 539 | SQYD | 25.00 | 13,475.00 | 50.00 | 26,950.00 | 30.00 | 16,170.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,701.6 | LNFT | 8.00 | 13,612.80 | 8.50 | 14,463.60 | 10.00 | 17,016.00 | | 0006 | 202-02-26000 | Removal of Manholes | 1 | EACH | 3,000.00 | 3,000.00 | 3,600.00 | 3,600.00 | 3,500.00 | 3,500.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) storm drain | 94 | LNFT | 50.00 | 4,700.00 | 39.00 | 3,666.00 | 60.00 | 5,640.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 300 | CUYD | 150.00 | 45,000.00 | 105.00 | 31,500.00 | 75.00 | 22,500.00 | | 0009 | 502-01-00100 | Asphalt Concrete 4" Thick binder course | 12.5 | TON | 850.00 | 10,625.00 | 425.00 | 5,312.50 | 900.00 | 11,250.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 502.1 | TON | 240.00 | 120,504.00 | 310.00 | 155,651.00 | 250.00 | 125,525.00 | | 0011 | 502-03-00200 | Asphalt Concrete (4" Thick) | 282 | SQYD | 75.00 | 21,150.00 | 76.00 | 21,432.00 | 75.00 | 21,150.00 | | 0012 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 6,259.3 | TON | 165.00 | 1,032,784.50 | 125.00 | 782,412.50 | 235.00 | 1,470,935.50 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 61,468 | SQYD | 3.00 | 184,404.00 | 10.00 | 614,680.00 | 10.00 | 614,680.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,415 | CUYD | 0.01 | -34.15 | 0.10 | -341.50 | 0.25 | -853.75 | | 0015 | 510-04-00100 | Pavement Patching | 930 | TON | 75.00 | 69,750.00 | 200.00 | 186,000.00 | 265.00 | 246,450.00 | | 0016 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 250 | LNFT | 175.00 | 43,750.00 | 125.00 | 31,250.00 | 200.00 | 50,000.00 | | 0017 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 94 | LNFT | 875.00 | 82,250.00 | 900.00 | 84,600.00 | 1,000.00 | 94,000.00 | | 0018 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 11,500.00 | 11,500.00 | 14,000.00 | 14,000.00 | 12,500.00 | 12,500.00 | | 0019 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 3,000.00 | 3,000.00 | 12,000.00 | 12,000.00 | 4,000.00 | 4,000.00 | | 0020 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 4,500.00 | 22,500.00 | 8,000.00 | 40,000.00 | 5,500.00 | 27,500.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 2,600.00 | 13,000.00 | 8,500.00 | 42,500.00 | 3,500.00 | 17,500.00 | | 0022 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 1,268.8 | LNFT | 52.50 | 66,612.00 | 55.00 | 69,784.00 | 65.00 | 82,472.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.6 | LNFT | 29.75 | 4,093.60 | 30.00 | 4,128.00 | 35.00 | 4,816.00 | | 0024 | 704-04-00200 | Blocked Out Guard Rail – 31”, (Double Faced, 6’-3” Post Spacing) | 275.2 | LNFT | 40.07 | 11,027.26 | 42.00 | 11,558.40 | 50.00 | 13,760.00 | | 0025 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 20 | LNFT | 166.50 | 3,330.00 | 175.00 | 3,500.00 | 200.00 | 4,000.00 | | 0026 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,625.00 | 7,250.00 | 3,750.00 | 7,500.00 | 4,000.00 | 8,000.00 | | 0027 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 4 | EACH | 11,450.00 | 45,800.00 | 12,000.00 | 48,000.00 | 12,500.00 | 50,000.00 | | 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 630 | SQYD | 65.00 | 40,950.00 | 110.00 | 69,300.00 | 80.00 | 50,400.00 | | 0029 | 706-04-00110 | Curb Ramps Type 1 | 64 | SQYD | 230.00 | 14,720.00 | 170.00 | 10,880.00 | 300.00 | 19,200.00 | | 0030 | 706-04-00110 | Curb Ramps Type 2 | 10.4 | SQYD | 280.00 | 2,912.00 | 525.00 | 5,460.00 | 325.00 | 3,380.00 | | 0031 | 706-04-00110 | Curb Ramps Type 3 | 72.9 | SQYD | 345.00 | 25,150.50 | 525.00 | 38,272.50 | 400.00 | 29,160.00 | | 0032 | 706-04-00110 | Curb Ramps Type 7 | 93.1 | SQYD | 225.00 | 20,947.50 | 525.00 | 48,877.50 | 300.00 | 27,930.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter (6" / 8" Barrier) | 3,662.5 | LNFT | 42.00 | 153,825.00 | 90.00 | 329,625.00 | 50.00 | 183,125.00 | | 0034 | 711-02-00400 | Riprap (55 lb) | 5 | CUYD | 475.00 | 2,375.00 | 300.00 | 1,500.00 | 750.00 | 3,750.00 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 545,000.00 | 545,000.00 | 395,000.00 | 395,000.00 | 650,000.00 | 650,000.00 | | 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,117 | LNFT | 0.35 | 1,790.95 | 0.35 | 1,790.95 | 0.50 | 2,558.50 | | 0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.242 | MILE | 350.00 | 2,884.70 | 640.00 | 5,274.88 | 350.00 | 2,884.70 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.172 | MILE | 1,000.00 | 8,172.00 | 1,000.00 | 8,172.00 | 1,200.00 | 9,806.40 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 330,000.00 | 330,000.00 | 395,000.00 | 395,000.00 | 400,000.00 | 400,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 85.00 | 510.00 | 90.00 | 540.00 | 125.00 | 750.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 919 | EACH | 6.50 | 5,973.50 | 6.75 | 6,203.25 | 8.00 | 7,352.00 | | 0042 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,559 | LNFT | 3.00 | 7,677.00 | 3.15 | 8,060.85 | 4.00 | 10,236.00 | | 0043 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 324 | LNFT | 6.00 | 1,944.00 | 6.25 | 2,025.00 | 8.00 | 2,592.00 | | 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 917 | LNFT | 12.00 | 11,004.00 | 12.50 | 11,462.50 | 15.00 | 13,755.00 | | 0045 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 2,251 | LNFT | 3.00 | 6,753.00 | 3.15 | 7,090.65 | 4.00 | 9,004.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.067 | MILE | 6,250.00 | 25,418.75 | 6,500.00 | 26,435.50 | 7,500.00 | 30,502.50 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.121 | MILE | 1,500.00 | 6,181.50 | 1,600.00 | 6,593.60 | 2,000.00 | 8,242.00 | | 0048 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 400.00 | 400.00 | 425.00 | 425.00 | 500.00 | 500.00 | | 0049 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 400.00 | 5,600.00 | 425.00 | 5,950.00 | 500.00 | 7,000.00 | | 0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 400.00 | 1,200.00 | 425.00 | 1,275.00 | 500.00 | 1,500.00 | | 0051 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 400.00 | 800.00 | 425.00 | 850.00 | 500.00 | 1,000.00 | | 0052 | 736-03-00100 | Jacking or Boring | 50 | LNFT | 59.63 | 2,981.50 | 62.00 | 3,100.00 | 75.00 | 3,750.00 | | 0053 | 736-09-00100 | Loop Detector | 2,550 | LNFT | 36.65 | 93,457.50 | 38.00 | 96,900.00 | 40.00 | 102,000.00 | | 0054 | 736-10-00200 | Underground Junction Box (Type E) | 5 | EACH | 1,317.38 | 6,586.90 | 1,400.00 | 7,000.00 | 1,500.00 | 7,500.00 | | 0055 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 35 | LNFT | 4.72 | 165.20 | 5.00 | 175.00 | 10.00 | 350.00 | | 0056 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 15 | LNFT | 7.80 | 117.00 | 8.25 | 123.75 | 15.00 | 225.00 | | 0057 | 736-12-00004 | Conductor (IMSA 51-7, #14 AWG, 19-Strand) | 100 | LNFT | 5.57 | 557.00 | 5.75 | 575.00 | 10.00 | 1,000.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 0.46 | ACRE | 7,110.74 | 3,270.94 | 7,500.00 | 3,450.00 | 8,000.00 | 3,680.00 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,500.00 | 25,500.00 | 48,925.57 | 48,925.57 | 120,000.00 | 120,000.00 | | 0060 | 741-35-00100 | Adjust Valve or Meter Box | 1 | EACH | 850.00 | 850.00 | 1,050.00 | 1,050.00 | 1,000.00 | 1,000.00 | | 0061 | TS-702-00106 | Catch Basin (CB-01) | 2 | EACH | 7,400.00 | 14,800.00 | 6,000.00 | 12,000.00 | 8,500.00 | 17,000.00 | | 0062 | TS-702-00121 | Manhole (Brick) | 1 | EACH | 13,250.00 | 13,250.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0063 | TS-706-00210 | Stamped Concrete Slope Paving | 6 | CUYD | 1,100.00 | 6,600.00 | 5,250.00 | 31,500.00 | 1,300.00 | 7,800.00 | | 0064 | TS-706-03000 | Concrete Pavers Sidewalk (Brick) | 147 | SQYD | 180.00 | 26,460.00 | 325.00 | 47,775.00 | 225.00 | 33,075.00 | | 0065 | TS-719-00006 | Root Pruning | 1 | LUMP | 21,250.00 | 21,250.00 | 12,500.00 | 12,500.00 | 25,000.00 | 25,000.00 | | 0066 | TS-719-00007 | Hand Formed and Poured In-Place Concrete Curb Within the Limits of the Tree Dripline | 230 | LF | 50.00 | 11,500.00 | 175.00 | 40,250.00 | 60.00 | 13,800.00 | | 0067 | TS-719-00069 | Tree Protection | 1 | LUMP | 7,020.00 | 7,020.00 | 6,500.00 | 6,500.00 | 8,500.00 | 8,500.00 | | 0068 | TS-726-37002 | Bedding Material | 10 | CUYD | 178.00 | 1,780.00 | 150.00 | 1,500.00 | 200.00 | 2,000.00 | | 0069 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 94 | LNFT | 50.00 | 4,700.00 | 1.00 | 94.00 | 200.00 | 18,800.00 | | 0070 | 726-01-00100 | Bedding Material (Net Section) | 42.1 | CUYD | 178.00 | 7,493.80 | 150.00 | 6,315.00 | 200.00 | 8,420.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,321,908.25 | | 3,981,171.00 | | 4,811,936.35 |
|