Proposal:H.014398.6
Parish:Ouachita
Description:CAPLES ROAD (MARION SIMS RD - LA 3033)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,993,612.85
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,048,527.80 |
| 2 | 15099 | Amethyst Construction, Inc. | $2,335,126.50 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $2,452,192.36 |
| 4 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $2,758,052.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Amethyst Construction, Inc. | - 3 - Diamond B Construction Co., L.L.C. | - 4 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.25 | LUMP | 5,000.00 | 5,000.00 | 14,000.00 | 14,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 24,000.00 | 24,000.00 | 24,000.00 | 24,000.00 | 25,000.00 | 25,000.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 18,000.00 | 18,000.00 | 58,000.00 | 58,000.00 | | 0004 | 203-10-00100 | Cleaning Existing Ditches | 200 | LNFT | 30.00 | 6,000.00 | 22.00 | 4,400.00 | 11.00 | 2,200.00 | 12.00 | 2,400.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 250 | LNFT | 7.00 | 1,750.00 | 12.00 | 3,000.00 | 9.00 | 2,250.00 | 3.00 | 750.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 627 | CUYD | 35.00 | 21,945.00 | 85.00 | 53,295.00 | 180.00 | 112,860.00 | 70.00 | 43,890.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 469 | CUYD | 70.00 | 32,830.00 | 105.00 | 49,245.00 | 85.00 | 39,865.00 | 70.00 | 32,830.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 7,747.8 | TON | 145.00 | 1,123,431.00 | 164.00 | 1,270,639.20 | 160.00 | 1,239,648.00 | 175.00 | 1,355,865.00 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 355.1 | TON | 145.00 | 51,489.50 | 225.00 | 79,897.50 | 300.00 | 106,530.00 | 225.00 | 79,897.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 27,363 | SQYD | 5.00 | 136,815.00 | 5.75 | 157,337.25 | 2.50 | 68,407.50 | 3.00 | 82,089.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -627 | CUYD | 1.00 | -627.00 | 1.00 | -627.00 | 1.00 | -627.00 | 1.00 | -627.00 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,300 | SQYD | 180.00 | 234,000.00 | 150.00 | 195,000.00 | 175.00 | 227,500.00 | 225.00 | 292,500.00 | | 0013 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 36 | LNFT | 125.00 | 4,500.00 | 400.00 | 14,400.00 | 180.00 | 6,480.00 | 200.00 | 7,200.00 | | 0014 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 36 | LNFT | 200.00 | 7,200.00 | 550.00 | 19,800.00 | 265.00 | 9,540.00 | 210.00 | 7,560.00 | | 0015 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 52 | LNFT | 900.00 | 46,800.00 | 940.00 | 48,880.00 | 720.00 | 37,440.00 | 1,000.00 | 52,000.00 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 52 | LNFT | 225.00 | 11,700.00 | 365.00 | 18,980.00 | 231.00 | 12,012.00 | 300.00 | 15,600.00 | | 0017 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 40 | LNFT | 700.00 | 28,000.00 | 700.00 | 28,000.00 | 485.00 | 19,400.00 | 600.00 | 24,000.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 128 | LNFT | 3.00 | 384.00 | 1.00 | 128.00 | 31.00 | 3,968.00 | 35.00 | 4,480.00 | | 0019 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 161 | SQYD | 160.00 | 25,760.00 | 130.00 | 20,930.00 | 180.00 | 28,980.00 | 200.00 | 32,200.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 161 | SQYD | 5.00 | 805.00 | 2.50 | 402.50 | 2.00 | 322.00 | 5.00 | 805.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 65,000.00 | 65,000.00 | 85,000.00 | 85,000.00 | 100,000.00 | 100,000.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 348 | LNFT | 0.50 | 174.00 | 1.25 | 435.00 | 0.55 | 191.40 | 2.00 | 696.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.926 | MILE | 300.00 | 4,177.80 | 900.00 | 12,533.40 | 155.00 | 2,158.53 | 300.00 | 4,177.80 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.524 | MILE | 600.00 | 914.40 | 800.00 | 1,219.20 | 650.00 | 990.60 | 1,000.00 | 1,524.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.867 | MILE | 900.00 | 22,380.30 | 1,150.00 | 28,597.05 | 975.00 | 24,245.33 | 1,300.00 | 32,327.10 | | 0026 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 547 | EACH | 3.00 | 1,641.00 | 1.00 | 547.00 | 6.00 | 3,282.00 | 6.00 | 3,282.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 5.6 | TON | 900.00 | 5,040.00 | 1,100.00 | 6,160.00 | 1,100.00 | 6,160.00 | 1,000.00 | 5,600.00 | | 0028 | 717-01-00100 | Seeding | 99 | LB | 15.00 | 1,485.00 | 28.00 | 2,772.00 | 15.00 | 1,485.00 | 22.00 | 2,178.00 | | 0029 | 718-01-00100 | Fertilizer | 2,820 | LB | 0.70 | 1,974.00 | 1.25 | 3,525.00 | 1.00 | 2,820.00 | 0.75 | 2,115.00 | | 0030 | 726-01-00100 | Bedding Material | 63.5 | CUYD | 125.00 | 7,937.50 | 150.00 | 9,525.00 | 150.00 | 9,525.00 | 200.00 | 12,700.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 85,000.00 | 85,000.00 | 240,000.00 | 240,000.00 | 270,000.00 | 270,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 9 | EACH | 85.00 | 765.00 | 85.00 | 765.00 | 65.00 | 585.00 | 80.00 | 720.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 547 | EACH | 7.00 | 3,829.00 | 8.00 | 4,376.00 | 6.00 | 3,282.00 | 7.00 | 3,829.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 116 | LNFT | 20.00 | 2,320.00 | 18.00 | 2,088.00 | 18.00 | 2,088.00 | 19.00 | 2,204.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.289 | MILE | 5,500.00 | 45,589.50 | 5,600.00 | 46,418.40 | 5,000.00 | 41,445.00 | 5,400.00 | 44,760.60 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.508 | MILE | 1,600.00 | 812.80 | 2,000.00 | 1,016.00 | 1,500.00 | 762.00 | 1,800.00 | 914.40 | | 0037 | 732-05-00100 | Removal of Existing Markings | 0.061 | MILE | 20,000.00 | 1,220.00 | 22,000.00 | 1,342.00 | 20,000.00 | 1,220.00 | 100,000.00 | 6,100.00 | | 0038 | 735-01-00100 | Mailboxes | 77 | EACH | 30.00 | 2,310.00 | 25.00 | 1,925.00 | 1.00 | 77.00 | 30.00 | 2,310.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 77 | EACH | 275.00 | 21,175.00 | 275.00 | 21,175.00 | 300.00 | 23,100.00 | 275.00 | 21,175.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 14,000.00 | 14,000.00 | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,048,527.80 | | 2,335,126.50 | | 2,452,192.36 | | 2,758,052.40 |
|