Search


Bid Tabulations for the Letting of 2/12/2025 LA DOTD Headquarters

Proposal:H.014398.6
Parish:Ouachita
Description:CAPLES ROAD (MARION SIMS RD - LA 3033)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,993,612.85
Rank License BidderConstruction Bid
105789D & J CONSTRUCTION CO., LLC$2,048,527.80
215099Amethyst Construction, Inc.$2,335,126.50
312487Diamond B Construction Co., L.L.C.$2,452,192.36
412312GILCHRIST CONSTRUCTION COMPANY, LLC$2,758,052.40


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
D & J CONSTRUCTION CO., LLC
- 2 -
Amethyst Construction, Inc.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
GILCHRIST CONSTRUCTION COMPANY, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 0.25  LUMP5,000.005,000.0014,000.0014,000.0010,000.0010,000.0050,000.0050,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP10,000.0010,000.0024,000.0024,000.0024,000.0024,000.0025,000.0025,000.00
0003203-05-00100Excavation and Embankment 1     LUMP15,000.0015,000.0025,000.0025,000.0018,000.0018,000.0058,000.0058,000.00
0004203-10-00100Cleaning Existing Ditches 200     LNFT30.006,000.0022.004,400.0011.002,200.0012.002,400.00
0005204-06-00100Temporary Silt Fencing 250     LNFT7.001,750.0012.003,000.009.002,250.003.00750.00
0006401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 627     CUYD35.0021,945.0085.0053,295.00180.00112,860.0070.0043,890.00
0007402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 469     CUYD70.0032,830.00105.0049,245.0085.0039,865.0070.0032,830.00
0008502-01-00100Asphalt Concrete 7,747.8   TON145.001,123,431.00164.001,270,639.20160.001,239,648.00175.001,355,865.00
0009502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 355.1   TON145.0051,489.50225.0079,897.50300.00106,530.00225.0079,897.50
0010509-01-00100Milling Asphalt Pavement 27,363     SQYD5.00136,815.005.75157,337.252.5068,407.503.0082,089.00
0011509-02-00100Contractor Retained Reclaimed Asphalt Pavement -627     CUYD1.00-627.001.00-627.001.00-627.001.00-627.00
0012510-01-00200Pavement Patching (12" Minimum Thickness) 1,300     SQYD180.00234,000.00150.00195,000.00175.00227,500.00225.00292,500.00
0013701-01-00900Cross Drain Pipe (18" RCP) 36     LNFT125.004,500.00400.0014,400.00180.006,480.00200.007,200.00
0014701-01-01021Cross Drain Pipe (30" RCP) 36     LNFT200.007,200.00550.0019,800.00265.009,540.00210.007,560.00
0015701-01-01140Cross Drain Pipe (72" RCP) 52     LNFT900.0046,800.00940.0048,880.00720.0037,440.001,000.0052,000.00
0016701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 52     LNFT225.0011,700.00365.0018,980.00231.0012,012.00300.0015,600.00
0017701-02-01100Cross Drain Pipe Arch (54" Equiv. RCPA) 40     LNFT700.0028,000.00700.0028,000.00485.0019,400.00600.0024,000.00
0018701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 128     LNFT3.00384.001.00128.0031.003,968.0035.004,480.00
0019711-01-03020Riprap (30 lb, 18" Thick) 161     SQYD160.0025,760.00130.0020,930.00180.0028,980.00200.0032,200.00
0020711-04-00100Geotextile Fabric 161     SQYD5.00805.002.50402.502.00322.005.00805.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0065,000.0065,000.0085,000.0085,000.00100,000.00100,000.00
0022713-02-00500Temporary Pavement Markings (24" Width) 348     LNFT0.50174.001.25435.000.55191.402.00696.00
0023713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 13.926 MILE300.004,177.80900.0012,533.40155.002,158.53300.004,177.80
0024713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.524 MILE600.00914.40800.001,219.20650.00990.601,000.001,524.00
0025713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 24.867 MILE900.0022,380.301,150.0028,597.05975.0024,245.331,300.0032,327.10
0026713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 547     EACH3.001,641.001.00547.006.003,282.006.003,282.00
0027716-01-00100Mulch (Vegetative) 5.6   TON900.005,040.001,100.006,160.001,100.006,160.001,000.005,600.00
0028717-01-00100Seeding 99     LB15.001,485.0028.002,772.0015.001,485.0022.002,178.00
0029718-01-00100Fertilizer 2,820     LB0.701,974.001.253,525.001.002,820.000.752,115.00
0030726-01-00100Bedding Material 63.5   CUYD125.007,937.50150.009,525.00150.009,525.00200.0012,700.00
0031727-01-00100Mobilization 1     LUMP120,000.00120,000.0085,000.0085,000.00240,000.00240,000.00270,000.00270,000.00
0032729-16-00200Object Marker Assembly (Type 2) 9     EACH85.00765.0085.00765.0065.00585.0080.00720.00
0033731-02-00100Reflectorized Raised Pavement Markers 547     EACH7.003,829.008.004,376.006.003,282.007.003,829.00
0034732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 116     LNFT20.002,320.0018.002,088.0018.002,088.0019.002,204.00
0035732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.289 MILE5,500.0045,589.505,600.0046,418.405,000.0041,445.005,400.0044,760.60
0036732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.508 MILE1,600.00812.802,000.001,016.001,500.00762.001,800.00914.40
0037732-05-00100Removal of Existing Markings 0.061 MILE20,000.001,220.0022,000.001,342.0020,000.001,220.00100,000.006,100.00
0038735-01-00100Mailboxes 77     EACH30.002,310.0025.001,925.001.0077.0030.002,310.00
0039735-02-00100Mailbox Supports (Single) 77     EACH275.0021,175.00275.0021,175.00300.0023,100.00275.0021,175.00
0040740-01-00100Construction Layout 1     LUMP12,000.0012,000.0014,000.0014,000.0035,000.0035,000.0075,000.0075,000.00
             
  CONTRACTOR TOTAL   2,048,527.80 2,335,126.50 2,452,192.36 2,758,052.40