Proposal:H.014249.6
Parish:Caldwell
Routes:LA 126
Description:LA 126: BRIDGE CREEK BRIDGE
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF TIMBER BRIDGE, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$2,209,502.70
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $1,902,827.97 |
| 2 | 56994 | Matt L. Guinn Construction, LLC | $1,951,364.69 |
| 3 | 55950 | Brown Industrial Construction, LLC | $2,089,563.14 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $2,139,689.60 |
| 5 | 49239 | WL Bass Construction Inc. | $2,256,556.40 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $2,598,147.32 |
| 7 | 00044 | Guinn Construction, LLC | $2,668,673.50 |
| 8 | 39613 | BAKER PILE DRIVING AND SITE WORK LLC | $2,699,210.41 |
| 9 | 14788 | Louisiana Bridge, Inc. | $3,174,517.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - Matt L. Guinn Construction, LLC | - 3 - Brown Industrial Construction, LLC | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.73 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 950.8 | SQYD | 10.00 | 9,508.00 | 10.00 | 9,508.00 | 8.00 | 7,606.40 | 7.00 | 6,655.60 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 581100410505571 (95' x 20.2' Timber Bridge) | 1,919 | LUMP | 85,000.00 | 85,000.00 | 15,000.00 | 15,000.00 | 92,000.00 | 92,000.00 | 40,000.00 | 40,000.00 | | 0005 | 202-02-12000 | Removal of Fence | 115 | LNFT | 4.00 | 460.00 | 5.00 | 575.00 | 8.00 | 920.00 | 20.00 | 2,300.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 443.9 | LNFT | 9.00 | 3,995.10 | 10.00 | 4,439.00 | 8.00 | 3,551.20 | 15.00 | 6,658.50 | | 0007 | 202-03-38000 | Relocation of Sign | 1 | EACH | 350.00 | 350.00 | 350.00 | 350.00 | 150.00 | 150.00 | 3,100.00 | 3,100.00 | | 0008 | 203-02-00100 | Drainage Excavation | 170 | CUYD | 25.00 | 4,250.00 | 35.00 | 5,950.00 | 15.00 | 2,550.00 | 49.00 | 8,330.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 52,000.00 | 52,000.00 | 60,000.00 | 60,000.00 | 35,000.00 | 35,000.00 | 37,000.00 | 37,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 125.00 | 1,000.00 | 250.00 | 2,000.00 | 150.00 | 1,200.00 | 155.00 | 1,240.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 730 | LNFT | 3.40 | 2,482.00 | 3.00 | 2,190.00 | 3.00 | 2,190.00 | 5.00 | 3,650.00 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 1,135.2 | SQYD | 55.00 | 62,436.00 | 80.00 | 90,816.00 | 50.00 | 56,760.00 | 50.00 | 56,760.00 | | 0013 | 304-01-00100 | Lime | 11.9 | TON | 300.00 | 3,570.00 | 0.10 | 1.19 | 350.00 | 4,165.00 | 375.00 | 4,462.50 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 850 | SQYD | 6.00 | 5,100.00 | 0.10 | 85.00 | 7.00 | 5,950.00 | 6.00 | 5,100.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 256.5 | TON | 390.00 | 100,035.00 | 350.00 | 89,775.00 | 335.00 | 85,927.50 | 250.00 | 64,125.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 56.4 | TON | 430.00 | 24,252.00 | 400.00 | 22,560.00 | 390.00 | 21,996.00 | 375.00 | 21,150.00 | | 0017 | 510-01-00001 | Pavement Patching 14.5 inch minimum thickness | 82 | SQYD | 245.00 | 20,090.00 | 265.00 | 21,730.00 | 230.00 | 18,860.00 | 215.00 | 17,630.00 | | 0018 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 86 | LNFT | 105.00 | 9,030.00 | 110.00 | 9,460.00 | 100.00 | 8,600.00 | 200.00 | 17,200.00 | | 0019 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 98 | LNFT | 115.00 | 11,270.00 | 150.00 | 14,700.00 | 130.00 | 12,740.00 | 200.00 | 19,600.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 112.5 | LNFT | 40.00 | 4,500.00 | 35.00 | 3,937.50 | 46.00 | 5,175.00 | 36.00 | 4,050.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 150.00 | 15,000.00 | 125.00 | 12,500.00 | 130.00 | 13,000.00 | 135.00 | 13,500.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,000.00 | 12,000.00 | 4,000.00 | 12,000.00 | 4,150.00 | 12,450.00 | 4,200.00 | 12,600.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 4,000.00 | 4,000.00 | 4,000.00 | 4,000.00 | 3,800.00 | 3,800.00 | 3,900.00 | 3,900.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 700.00 | 7,000.00 | 600.00 | 6,000.00 | 600.00 | 6,000.00 | 700.00 | 7,000.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 225.00 | 2,250.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | 300.00 | 3,000.00 | | 0026 | 711-03-00400 | Riprap (55 lb) | 850 | TON | 100.00 | 85,000.00 | 105.00 | 89,250.00 | 110.00 | 93,500.00 | 80.00 | 68,000.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 936 | SQYD | 3.00 | 2,808.00 | 5.00 | 4,680.00 | 3.00 | 2,808.00 | 1.00 | 936.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 22,600.00 | 22,600.00 | 88,250.00 | 88,250.00 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.367 | MILE | 1.00 | 0.37 | 16,000.00 | 5,872.00 | 9,024.00 | 3,311.81 | 9,000.00 | 3,303.00 | | 0030 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 25 | EACH | 1.00 | 25.00 | 8.00 | 200.00 | 11.00 | 275.00 | 10.00 | 250.00 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 326 | SQYD | 3.50 | 1,141.00 | 3.00 | 978.00 | 5.00 | 1,630.00 | 3.00 | 978.00 | | 0032 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 87 | SQYD | 3.50 | 304.50 | 4.00 | 348.00 | 5.00 | 435.00 | 3.00 | 261.00 | | 0033 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 89 | SQYD | 3.50 | 311.50 | 4.00 | 356.00 | 5.00 | 445.00 | 3.00 | 267.00 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 0.062 | MILE | 1,200.00 | 74.40 | 32,500.00 | 2,015.00 | 484.00 | 30.01 | 1,000.00 | 62.00 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.123 | MILE | 1,200.00 | 147.60 | 20,000.00 | 2,460.00 | 488.00 | 60.02 | 1,000.00 | 123.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 190,000.00 | 190,000.00 | 208,900.00 | 208,900.00 | 210,000.00 | 210,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 125.00 | 500.00 | 125.00 | 500.00 | 130.00 | 520.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 10.00 | 240.00 | 8.00 | 192.00 | 10.00 | 240.00 | 11.00 | 264.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.351 | MILE | 7,500.00 | 2,632.50 | 7,000.00 | 2,457.00 | 6,482.00 | 2,275.18 | 6,500.00 | 2,281.50 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.017 | MILE | 3,000.00 | 51.00 | 7,000.00 | 119.00 | 5,295.00 | 90.02 | 5,500.00 | 93.50 | | 0041 | 739-01-00100 | Hydro-Seeding | 0.73 | ACRE | 5,500.00 | 4,015.00 | 4,500.00 | 3,285.00 | 5,000.00 | 3,650.00 | 5,500.00 | 4,015.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 | 16,558.00 | 16,558.00 | 110,000.00 | 110,000.00 | | 0043 | 804-01-00400 | Precast Concrete Piles (18") | 1,860 | LNFT | 160.00 | 297,600.00 | 165.00 | 306,900.00 | 175.00 | 325,500.00 | 180.00 | 334,800.00 | | 0044 | 805-01-00100 | Class A1 Concrete (Slab Span) | 191.94 | CUYD | 1,500.00 | 287,910.00 | 2,000.00 | 383,880.00 | 1,500.00 | 287,910.00 | 1,750.00 | 335,895.00 | | 0045 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 56.05 | CUYD | 3,100.00 | 173,755.00 | 3,000.00 | 168,150.00 | 3,100.00 | 173,755.00 | 4,000.00 | 224,200.00 | | 0046 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,613 | SQFT | 3.00 | 4,839.00 | 2.50 | 4,032.50 | 2.50 | 4,032.50 | 4.00 | 6,452.00 | | 0047 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,613 | SQFT | 3.00 | 4,839.00 | 2.50 | 4,032.50 | 3.50 | 5,645.50 | 5.00 | 8,065.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 45,070 | LB | 2.00 | 90,140.00 | 1.50 | 67,605.00 | 1.70 | 76,619.00 | 2.00 | 90,140.00 | | 0049 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 240 | LNFT | 200.00 | 48,000.00 | 205.00 | 49,200.00 | 254.00 | 60,960.00 | 245.00 | 58,800.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 110.00 | 140,800.00 | 115.00 | 147,200.00 | 158.00 | 202,240.00 | 135.00 | 172,800.00 | | 0051 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 150 | SFIN | 170.00 | 25,500.00 | 175.00 | 26,250.00 | 142.00 | 21,300.00 | 40.00 | 6,000.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 18.00 | 4,032.00 | 25.00 | 5,600.00 | 19.00 | 4,256.00 | 15.00 | 3,360.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 10.00 | 1,920.00 | 15.00 | 2,880.00 | 30.00 | 5,760.00 | 10.00 | 1,920.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 4.00 | 1,280.00 | 3.50 | 1,120.00 | 3.00 | 960.00 | 7.50 | 2,400.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 242 | INLF | 2.00 | 484.00 | 3.00 | 726.00 | 3.00 | 726.00 | 1.00 | 242.00 | | 0056 | NS-719-00002 | Tree Trimming | 1 | LUMP | 5,000.00 | 5,000.00 | 500.00 | 500.00 | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,902,827.97 | | 1,951,364.69 | | 2,089,563.14 | | 2,139,689.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - JB JAMES CONSTRUCTION LLC | - 7 - Guinn Construction, LLC | - 8 - BAKER PILE DRIVING AND SITE WORK LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.73 | LUMP | 83,000.00 | 83,000.00 | 110,000.00 | 110,000.00 | 65,000.00 | 65,000.00 | 80,415.44 | 80,415.44 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 43,028.87 | 43,028.87 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 950.8 | SQYD | 2.50 | 2,377.00 | 10.00 | 9,508.00 | 25.00 | 23,770.00 | 17.25 | 16,401.30 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 581100410505571 (95' x 20.2' Timber Bridge) | 1,919 | LUMP | 100,000.00 | 100,000.00 | 260,000.00 | 260,000.00 | 50,000.00 | 50,000.00 | 96,935.32 | 96,935.32 | | 0005 | 202-02-12000 | Removal of Fence | 115 | LNFT | 3.00 | 345.00 | 17.00 | 1,955.00 | 100.00 | 11,500.00 | 24.04 | 2,764.60 | | 0006 | 202-02-14500 | Removal of Guard Rail | 443.9 | LNFT | 10.00 | 4,439.00 | 22.00 | 9,765.80 | 15.00 | 6,658.50 | 13.00 | 5,770.70 | | 0007 | 202-03-38000 | Relocation of Sign | 1 | EACH | 1,000.00 | 1,000.00 | 850.00 | 850.00 | 150.00 | 150.00 | 603.68 | 603.68 | | 0008 | 203-02-00100 | Drainage Excavation | 170 | CUYD | 25.00 | 4,250.00 | 50.00 | 8,500.00 | 50.00 | 8,500.00 | 26.32 | 4,474.40 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 150,000.00 | 150,000.00 | 80,000.00 | 80,000.00 | 80,000.00 | 80,000.00 | 37,041.20 | 37,041.20 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 145.00 | 1,160.00 | 175.00 | 1,400.00 | 500.00 | 4,000.00 | 313.90 | 2,511.20 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 730 | LNFT | 5.00 | 3,650.00 | 12.00 | 8,760.00 | 3.00 | 2,190.00 | 8.09 | 5,905.70 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 1,135.2 | SQYD | 75.00 | 85,140.00 | 50.00 | 56,760.00 | 75.00 | 85,140.00 | 92.90 | 105,460.08 | | 0013 | 304-01-00100 | Lime | 11.9 | TON | 450.00 | 5,355.00 | 100.00 | 1,190.00 | 750.00 | 8,925.00 | 436.00 | 5,188.40 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 850 | SQYD | 7.00 | 5,950.00 | 10.00 | 8,500.00 | 15.00 | 12,750.00 | 6.10 | 5,185.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 256.5 | TON | 340.00 | 87,210.00 | 335.00 | 85,927.50 | 300.00 | 76,950.00 | 488.24 | 125,233.56 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 56.4 | TON | 400.00 | 22,560.00 | 390.00 | 21,996.00 | 350.00 | 19,740.00 | 582.00 | 32,824.80 | | 0017 | 510-01-00001 | Pavement Patching 14.5 inch minimum thickness | 82 | SQYD | 300.00 | 24,600.00 | 270.00 | 22,140.00 | 300.00 | 24,600.00 | 435.93 | 35,746.26 | | 0018 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 86 | LNFT | 150.00 | 12,900.00 | 130.00 | 11,180.00 | 150.00 | 12,900.00 | 125.45 | 10,788.70 | | 0019 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 98 | LNFT | 180.00 | 17,640.00 | 130.00 | 12,740.00 | 225.00 | 22,050.00 | 148.41 | 14,544.18 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 112.5 | LNFT | 30.00 | 3,375.00 | 30.00 | 3,375.00 | 42.00 | 4,725.00 | 46.00 | 5,175.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 85.00 | 8,500.00 | 85.00 | 8,500.00 | 150.00 | 15,000.00 | 100.08 | 10,008.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,750.00 | 11,250.00 | 3,750.00 | 11,250.00 | 5,250.00 | 15,750.00 | 4,331.97 | 12,995.91 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,750.00 | 3,750.00 | 3,750.00 | 3,750.00 | 5,500.00 | 5,500.00 | 4,074.38 | 4,074.38 | | 0024 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 600.00 | 6,000.00 | 600.00 | 6,000.00 | 1,000.00 | 10,000.00 | 615.09 | 6,150.90 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 200.00 | 2,000.00 | 200.00 | 2,000.00 | 500.00 | 5,000.00 | 555.34 | 5,553.40 | | 0026 | 711-03-00400 | Riprap (55 lb) | 850 | TON | 120.00 | 102,000.00 | 120.00 | 102,000.00 | 150.00 | 127,500.00 | 111.77 | 95,004.50 | | 0027 | 711-04-00100 | Geotextile Fabric | 936 | SQYD | 4.00 | 3,744.00 | 2.00 | 1,872.00 | 5.00 | 4,680.00 | 7.07 | 6,617.52 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 42,500.00 | 42,500.00 | 25,063.00 | 25,063.00 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.367 | MILE | 8,950.00 | 3,284.65 | 9,000.00 | 3,303.00 | 12,500.00 | 4,587.50 | 13,040.00 | 4,785.68 | | 0030 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 25 | EACH | 10.00 | 250.00 | 10.00 | 250.00 | 20.00 | 500.00 | 21.73 | 543.25 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 326 | SQYD | 3.00 | 978.00 | 2.00 | 652.00 | 8.00 | 2,608.00 | 7.80 | 2,542.80 | | 0032 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 87 | SQYD | 3.00 | 261.00 | 5.00 | 435.00 | 10.00 | 870.00 | 14.31 | 1,244.97 | | 0033 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 89 | SQYD | 4.00 | 356.00 | 5.00 | 445.00 | 10.00 | 890.00 | 14.12 | 1,256.68 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 0.062 | MILE | 350.00 | 21.70 | 500.00 | 31.00 | 1,000.00 | 62.00 | 19,280.00 | 1,195.36 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.123 | MILE | 350.00 | 43.05 | 500.00 | 61.50 | 1,000.00 | 123.00 | 9,720.00 | 1,195.56 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 240,000.00 | 240,000.00 | 275,000.00 | 275,000.00 | 270,000.00 | 270,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 200.00 | 800.00 | 301.84 | 1,207.36 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 10.00 | 240.00 | 10.00 | 240.00 | 20.00 | 480.00 | 21.73 | 521.52 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.351 | MILE | 6,500.00 | 2,281.50 | 6,500.00 | 2,281.50 | 10,000.00 | 3,510.00 | 8,150.00 | 2,860.65 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.017 | MILE | 4,500.00 | 76.50 | 5,300.00 | 90.10 | 10,000.00 | 170.00 | 2,720.00 | 46.24 | | 0041 | 739-01-00100 | Hydro-Seeding | 0.73 | ACRE | 3,750.00 | 2,737.50 | 4,800.00 | 3,504.00 | 5,000.00 | 3,650.00 | 7,768.00 | 5,670.64 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 47,492.27 | 47,492.27 | | 0043 | 804-01-00400 | Precast Concrete Piles (18") | 1,860 | LNFT | 220.00 | 409,200.00 | 300.00 | 558,000.00 | 200.00 | 372,000.00 | 278.00 | 517,080.00 | | 0044 | 805-01-00100 | Class A1 Concrete (Slab Span) | 191.94 | CUYD | 350.00 | 67,179.00 | 1,700.00 | 326,298.00 | 2,800.00 | 537,432.00 | 1,540.00 | 295,587.60 | | 0045 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 56.05 | CUYD | 350.00 | 19,617.50 | 3,300.00 | 184,965.00 | 4,500.00 | 252,225.00 | 5,733.00 | 321,334.65 | | 0046 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,613 | SQFT | 2.00 | 3,226.00 | 1.00 | 1,613.00 | 3.00 | 4,839.00 | 12.03 | 19,404.39 | | 0047 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,613 | SQFT | 3.00 | 4,839.00 | 2.00 | 3,226.00 | 3.00 | 4,839.00 | 11.87 | 19,146.31 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 45,070 | LB | 5.00 | 225,350.00 | 2.00 | 90,140.00 | 1.85 | 83,379.50 | 1.60 | 72,112.00 | | 0049 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 240 | LNFT | 285.00 | 68,400.00 | 192.00 | 46,080.00 | 325.00 | 78,000.00 | 326.20 | 78,288.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 200.00 | 256,000.00 | 124.00 | 158,720.00 | 135.00 | 172,800.00 | 151.58 | 194,022.40 | | 0051 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 150 | SFIN | 150.00 | 22,500.00 | 120.00 | 18,000.00 | 255.00 | 38,250.00 | 126.11 | 18,916.50 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 15.00 | 3,360.00 | 24.00 | 5,376.00 | 30.00 | 6,720.00 | 21.57 | 4,831.68 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 18.00 | 3,456.00 | 4.55 | 873.60 | 20.00 | 3,840.00 | 16.49 | 3,166.08 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 1.00 | 320.00 | 4.04 | 1,292.80 | 10.00 | 3,200.00 | 8.03 | 2,569.60 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 242 | INLF | 2.00 | 484.00 | 8.06 | 1,950.52 | 10.00 | 2,420.00 | 14.08 | 3,407.36 | | 0056 | NS-719-00002 | Tree Trimming | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 7,314.86 | 7,314.86 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,256,556.40 | | 2,598,147.32 | | 2,668,673.50 | | 2,699,210.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.73 | LUMP | 225,000.00 | 225,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 950.8 | SQYD | 18.00 | 17,114.40 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 581100410505571 (95' x 20.2' Timber Bridge) | 1,919 | LUMP | 55,000.00 | 55,000.00 | | 0005 | 202-02-12000 | Removal of Fence | 115 | LNFT | 10.00 | 1,150.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 443.9 | LNFT | 17.00 | 7,546.30 | | 0007 | 202-03-38000 | Relocation of Sign | 1 | EACH | 200.00 | 200.00 | | 0008 | 203-02-00100 | Drainage Excavation | 170 | CUYD | 30.00 | 5,100.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 90,000.00 | 90,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 200.00 | 1,600.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 730 | LNFT | 5.00 | 3,650.00 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 1,135.2 | SQYD | 92.00 | 104,438.40 | | 0013 | 304-01-00100 | Lime | 11.9 | TON | 510.00 | 6,069.00 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 850 | SQYD | 42.00 | 35,700.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 256.5 | TON | 330.00 | 84,645.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 56.4 | TON | 405.00 | 22,842.00 | | 0017 | 510-01-00001 | Pavement Patching 14.5 inch minimum thickness | 82 | SQYD | 300.00 | 24,600.00 | | 0018 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 86 | LNFT | 270.00 | 23,220.00 | | 0019 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 98 | LNFT | 300.00 | 29,400.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 112.5 | LNFT | 35.50 | 3,993.75 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 130.00 | 13,000.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,150.00 | 12,450.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,800.00 | 3,800.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 900.00 | 9,000.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 600.00 | 6,000.00 | | 0026 | 711-03-00400 | Riprap (55 lb) | 850 | TON | 140.00 | 119,000.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 936 | SQYD | 5.00 | 4,680.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.367 | MILE | 8,950.00 | 3,284.65 | | 0030 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 25 | EACH | 10.00 | 250.00 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 326 | SQYD | 5.00 | 1,630.00 | | 0032 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 87 | SQYD | 5.00 | 435.00 | | 0033 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 89 | SQYD | 5.00 | 445.00 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 0.062 | MILE | 47,000.00 | 2,914.00 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.123 | MILE | 24,000.00 | 2,952.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 375,000.00 | 375,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 10.00 | 240.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.351 | MILE | 8,300.00 | 2,913.30 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.017 | MILE | 7,100.00 | 120.70 | | 0041 | 739-01-00100 | Hydro-Seeding | 0.73 | ACRE | 6,500.00 | 4,745.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | | 0043 | 804-01-00400 | Precast Concrete Piles (18") | 1,860 | LNFT | 235.00 | 437,100.00 | | 0044 | 805-01-00100 | Class A1 Concrete (Slab Span) | 191.94 | CUYD | 2,500.00 | 479,850.00 | | 0045 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 56.05 | CUYD | 3,400.00 | 190,570.00 | | 0046 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,613 | SQFT | 3.00 | 4,839.00 | | 0047 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,613 | SQFT | 3.00 | 4,839.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 45,070 | LB | 2.50 | 112,675.00 | | 0049 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 240 | LNFT | 305.00 | 73,200.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 250.00 | 320,000.00 | | 0051 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 150 | SFIN | 275.00 | 41,250.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 20.00 | 4,480.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 20.00 | 3,840.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 11.00 | 3,520.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 242 | INLF | 3.00 | 726.00 | | 0056 | NS-719-00002 | Tree Trimming | 1 | LUMP | 28,000.00 | 28,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,174,517.50 |
|