Proposal:H.013239.6-R2
Parish:St. John the Baptist
Routes:US 61
Description:HIGHWAY 61 STREETSCAPE IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, CONCRETE AND ASPHALT DRIVES, CABLED ARTICULATED CONCRETE BLOCK MATTRESS, SEWER AND WATER LINE RELOCATION, AND RELATED WORK.
Estimated Construction Cost:$4,223,735.22
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $3,899,642.00 |
| 2 | 46747 | Triumph Construction, LLC | $4,037,000.00 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $4,171,900.60 |
| 4 | 48896 | Command Construction Industries LLC | $4,197,583.50 |
| 5 | 34263 | La Contracting Enterprise LLC | $4,199,650.00 |
| 6 | 44187 | RNGD Infrastructure LLC | $4,498,242.60 |
| 7 | 14914 | Kass Bros. Inc. | $5,145,627.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - Triumph Construction, LLC | - 3 - Byron E. Talbot Contractor, Inc. | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.18 | LUMP | 11,000.00 | 11,000.00 | 69,040.00 | 69,040.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 70,000.00 | 70,000.00 | 57,090.00 | 57,090.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 499 | SQYD | 25.00 | 12,475.00 | 79.00 | 39,421.00 | 25.00 | 12,475.00 | 25.00 | 12,475.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,706 | SQYD | 20.00 | 34,120.00 | 14.00 | 23,884.00 | 25.00 | 42,650.00 | 25.00 | 42,650.00 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 55 | SQYD | 15.00 | 825.00 | 23.00 | 1,265.00 | 25.00 | 1,375.00 | 25.00 | 1,375.00 | | 0006 | 203-02-00100 | Drainage Excavation | 883 | CUYD | 40.00 | 35,320.00 | 18.00 | 15,894.00 | 25.00 | 22,075.00 | 25.00 | 22,075.00 | | 0007 | 203-04-00200 | Nonplastic Embankment (Sand) | 542 | CUYD | 30.00 | 16,260.00 | 61.00 | 33,062.00 | 75.00 | 40,650.00 | 50.00 | 27,100.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 46,520.00 | 46,520.00 | 41,000.00 | 41,000.00 | 50,000.00 | 50,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 198 | EACH | 30.00 | 5,940.00 | 11.00 | 2,178.00 | 30.00 | 5,940.00 | 10.00 | 1,980.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 297.7 | CUYD | 105.00 | 31,258.50 | 176.00 | 52,395.20 | 105.00 | 31,258.50 | 150.00 | 44,655.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 165 | TON | 275.00 | 45,375.00 | 276.00 | 45,540.00 | 400.00 | 66,000.00 | 350.00 | 57,750.00 | | 0012 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 48.2 | SQYD | 185.00 | 8,917.00 | 143.00 | 6,892.60 | 500.00 | 24,100.00 | 350.00 | 16,870.00 | | 0013 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 183 | LNFT | 110.00 | 20,130.00 | 120.00 | 21,960.00 | 141.00 | 25,803.00 | 200.00 | 36,600.00 | | 0014 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 688 | LNFT | 130.00 | 89,440.00 | 145.00 | 99,760.00 | 160.00 | 110,080.00 | 220.00 | 151,360.00 | | 0015 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 401 | LNFT | 165.00 | 66,165.00 | 205.00 | 82,205.00 | 205.00 | 82,205.00 | 275.00 | 110,275.00 | | 0016 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 2,664 | LNFT | 190.00 | 506,160.00 | 184.00 | 490,176.00 | 249.00 | 663,336.00 | 300.00 | 799,200.00 | | 0017 | 701-12-01060 | Corrugated Metal Pipe (Extension) (24") | 5 | LNFT | 211.00 | 1,055.00 | 620.00 | 3,100.00 | 500.00 | 2,500.00 | 300.00 | 1,500.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,200.00 | 2,200.00 | 3,110.00 | 3,110.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | | 0019 | 702-02-00100 | Manholes (MH-06) | 5 | EACH | 6,600.00 | 33,000.00 | 7,870.00 | 39,350.00 | 6,250.00 | 31,250.00 | 12,000.00 | 60,000.00 | | 0020 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 4,200.00 | 63,000.00 | 5,875.00 | 88,125.00 | 5,200.00 | 78,000.00 | 8,000.00 | 120,000.00 | | 0021 | 702-03-01100 | Catch Basins (CB-SD02) | 18 | EACH | 7,500.00 | 135,000.00 | 9,807.00 | 176,526.00 | 8,600.00 | 154,800.00 | 10,000.00 | 180,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 943.5 | SQYD | 65.00 | 61,327.50 | 53.00 | 50,005.50 | 100.00 | 94,350.00 | 100.00 | 94,350.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 1,744 | SQYD | 80.00 | 139,520.00 | 74.00 | 129,056.00 | 125.00 | 218,000.00 | 120.00 | 209,280.00 | | 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,625.7 | SQYD | 80.00 | 130,056.00 | 76.00 | 123,553.20 | 96.00 | 156,067.20 | 120.00 | 195,084.00 | | 0025 | 706-04-00110 | Curb Ramps Type 3 | 56.7 | SQYD | 1,400.00 | 79,380.00 | 319.00 | 18,087.30 | 385.00 | 21,829.50 | 200.00 | 11,340.00 | | 0026 | 707-01-00100 | Concrete Curb | 658.5 | LNFT | 20.00 | 13,170.00 | 29.00 | 19,096.50 | 25.00 | 16,462.50 | 25.00 | 16,462.50 | | 0027 | 712-05-00100 | Cabled Articulated Concrete Block Mattress | 595 | SQYD | 135.00 | 80,325.00 | 68.00 | 40,460.00 | 95.00 | 56,525.00 | 100.00 | 59,500.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 174,070.00 | 174,070.00 | 55,000.00 | 55,000.00 | 150,000.00 | 150,000.00 | | 0029 | 726-01-00100 | Bedding Material | 463.7 | CUYD | 130.00 | 60,281.00 | 196.00 | 90,885.20 | 147.00 | 68,163.90 | 100.00 | 46,370.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 175,000.00 | 175,000.00 | 521,034.50 | 521,034.50 | 225,000.00 | 225,000.00 | 400,000.00 | 400,000.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 60.00 | 1,320.00 | 64.00 | 1,408.00 | 55.00 | 1,210.00 | 120.00 | 2,640.00 | | 0032 | 732-05-00100 | Removal of Existing Markings | 0.013 | MILE | 60,000.00 | 780.00 | 64,615.00 | 840.00 | 110,000.00 | 1,430.00 | 100,000.00 | 1,300.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 129,950.00 | 129,950.00 | 31,000.00 | 31,000.00 | 150,000.00 | 150,000.00 | | 0034 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 10,000.00 | 10,000.00 | 28,000.00 | 28,000.00 | 1,250.00 | 1,250.00 | 1,000.00 | 1,000.00 | | 0035 | 741-20-01120 | Water Main (10" PVC) | 1,010 | LNFT | 165.00 | 166,650.00 | 119.00 | 120,190.00 | 158.00 | 159,580.00 | 125.00 | 126,250.00 | | 0036 | 741-22-00500 | Tapping Sleeve and Valve (10") | 8 | EACH | 15,000.00 | 120,000.00 | 5,153.00 | 41,224.00 | 10,500.00 | 84,000.00 | 15,000.00 | 120,000.00 | | 0037 | 741-23-01120 | Insertion Valve (10") | 8 | EACH | 20,000.00 | 160,000.00 | 24,616.00 | 196,928.00 | 23,750.00 | 190,000.00 | 15,000.00 | 120,000.00 | | 0038 | 741-33-00100 | Adjust Service Connection (20’ or less) | 15 | EACH | 1,600.00 | 24,000.00 | 2,173.00 | 32,595.00 | 1,500.00 | 22,500.00 | 500.00 | 7,500.00 | | 0039 | 742-02-00200 | Sanitary Sewer Force Main Pipe 20" PVC | 375 | LNFT | 500.00 | 187,500.00 | 138.00 | 51,750.00 | 575.00 | 215,625.00 | 550.00 | 206,250.00 | | 0040 | TS-714-00100 | Slab Sodding (Empire Zoysia) | 8,991 | SQYD | 12.00 | 107,892.00 | 11.00 | 98,901.00 | 10.00 | 89,910.00 | 12.00 | 107,892.00 | | 0041 | TS-741-10042 | Plug and Abandon Water Main | 16 | EACH | 2,800.00 | 44,800.00 | 3,724.00 | 59,584.00 | 2,000.00 | 32,000.00 | 2,000.00 | 32,000.00 | | 0042 | TS-741-23020 | Insertion Valve (20”) | 8 | EACH | 73,000.00 | 584,000.00 | 69,940.00 | 559,520.00 | 70,000.00 | 560,000.00 | 15,000.00 | 120,000.00 | | 0043 | TS-741-60029 | Tapping Sleeve, Valve and Box 20" | 8 | EACH | 54,500.00 | 436,000.00 | 10,722.00 | 85,776.00 | 41,000.00 | 328,000.00 | 25,000.00 | 200,000.00 | | 0044 | TS-742-00005 | Plug and Abandon Sewer Force Main | 16 | EACH | 3,000.00 | 48,000.00 | 4,162.00 | 66,592.00 | 3,500.00 | 56,000.00 | 500.00 | 8,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,899,642.00 | | 4,037,000.00 | | 4,171,900.60 | | 4,197,583.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - La Contracting Enterprise LLC | - 6 - RNGD Infrastructure LLC | - 7 - Kass Bros. Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.18 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 5,400.00 | 5,400.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 75,000.00 | 75,000.00 | 10,000.00 | 10,000.00 | 41,000.00 | 41,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 499 | SQYD | 33.00 | 16,467.00 | 15.00 | 7,485.00 | 26.50 | 13,223.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,706 | SQYD | 33.00 | 56,298.00 | 28.00 | 47,768.00 | 29.00 | 49,474.00 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 55 | SQYD | 40.00 | 2,200.00 | 12.00 | 660.00 | 56.00 | 3,080.00 | | 0006 | 203-02-00100 | Drainage Excavation | 883 | CUYD | 1.00 | 883.00 | 25.00 | 22,075.00 | 25.00 | 22,075.00 | | 0007 | 203-04-00200 | Nonplastic Embankment (Sand) | 542 | CUYD | 75.00 | 40,650.00 | 45.00 | 24,390.00 | 91.00 | 49,322.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 198 | EACH | 10.00 | 1,980.00 | 17.00 | 3,366.00 | 25.00 | 4,950.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 297.7 | CUYD | 165.00 | 49,120.50 | 85.00 | 25,304.50 | 90.00 | 26,793.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 165 | TON | 235.00 | 38,775.00 | 475.00 | 78,375.00 | 485.00 | 80,025.00 | | 0012 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 48.2 | SQYD | 425.00 | 20,485.00 | 125.00 | 6,025.00 | 500.00 | 24,100.00 | | 0013 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 183 | LNFT | 105.00 | 19,215.00 | 70.00 | 12,810.00 | 175.00 | 32,025.00 | | 0014 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 688 | LNFT | 108.00 | 74,304.00 | 90.00 | 61,920.00 | 180.00 | 123,840.00 | | 0015 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 401 | LNFT | 140.00 | 56,140.00 | 170.00 | 68,170.00 | 245.00 | 98,245.00 | | 0016 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 2,664 | LNFT | 190.00 | 506,160.00 | 225.00 | 599,400.00 | 270.00 | 719,280.00 | | 0017 | 701-12-01060 | Corrugated Metal Pipe (Extension) (24") | 5 | LNFT | 400.00 | 2,000.00 | 180.00 | 900.00 | 690.00 | 3,450.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | 2,900.00 | 2,900.00 | | 0019 | 702-02-00100 | Manholes (MH-06) | 5 | EACH | 7,900.00 | 39,500.00 | 5,300.00 | 26,500.00 | 7,800.00 | 39,000.00 | | 0020 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 5,500.00 | 82,500.00 | 5,100.00 | 76,500.00 | 6,300.00 | 94,500.00 | | 0021 | 702-03-01100 | Catch Basins (CB-SD02) | 18 | EACH | 12,500.00 | 225,000.00 | 10,000.00 | 180,000.00 | 9,500.00 | 171,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 943.5 | SQYD | 83.00 | 78,310.50 | 55.00 | 51,892.50 | 190.00 | 179,265.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 1,744 | SQYD | 92.00 | 160,448.00 | 80.00 | 139,520.00 | 195.00 | 340,080.00 | | 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,625.7 | SQYD | 84.00 | 136,558.80 | 78.00 | 126,804.60 | 165.00 | 268,240.50 | | 0025 | 706-04-00110 | Curb Ramps Type 3 | 56.7 | SQYD | 350.00 | 19,845.00 | 325.00 | 18,427.50 | 721.00 | 40,880.70 | | 0026 | 707-01-00100 | Concrete Curb | 658.5 | LNFT | 23.00 | 15,145.50 | 36.00 | 23,706.00 | 103.00 | 67,825.50 | | 0027 | 712-05-00100 | Cabled Articulated Concrete Block Mattress | 595 | SQYD | 1.00 | 595.00 | 96.00 | 57,120.00 | 80.00 | 47,600.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 15,000.00 | 15,000.00 | 180,000.00 | 180,000.00 | | 0029 | 726-01-00100 | Bedding Material | 463.7 | CUYD | 150.00 | 69,555.00 | 110.00 | 51,007.00 | 65.00 | 30,140.50 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 344,000.00 | 344,000.00 | 375,000.00 | 375,000.00 | 460,000.00 | 460,000.00 | | 0031 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 72.00 | 1,584.00 | 55.00 | 1,210.00 | 130.00 | 2,860.00 | | 0032 | 732-05-00100 | Removal of Existing Markings | 0.013 | MILE | 60,000.00 | 780.00 | 5,500.00 | 71.50 | 65,500.00 | 851.50 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 24,000.00 | 24,000.00 | 35,000.00 | 35,000.00 | 34,500.00 | 34,500.00 | | 0034 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 499.70 | 499.70 | 55,000.00 | 55,000.00 | 1,300.00 | 1,300.00 | | 0035 | 741-20-01120 | Water Main (10" PVC) | 1,010 | LNFT | 200.00 | 202,000.00 | 275.00 | 277,750.00 | 180.00 | 181,800.00 | | 0036 | 741-22-00500 | Tapping Sleeve and Valve (10") | 8 | EACH | 14,500.00 | 116,000.00 | 17,800.00 | 142,400.00 | 13,500.00 | 108,000.00 | | 0037 | 741-23-01120 | Insertion Valve (10") | 8 | EACH | 25,500.00 | 204,000.00 | 24,000.00 | 192,000.00 | 21,500.00 | 172,000.00 | | 0038 | 741-33-00100 | Adjust Service Connection (20’ or less) | 15 | EACH | 1,885.00 | 28,275.00 | 1,400.00 | 21,000.00 | 1,400.00 | 21,000.00 | | 0039 | 742-02-00200 | Sanitary Sewer Force Main Pipe 20" PVC | 375 | LNFT | 765.00 | 286,875.00 | 645.00 | 241,875.00 | 622.00 | 233,250.00 | | 0040 | TS-714-00100 | Slab Sodding (Empire Zoysia) | 8,991 | SQYD | 11.00 | 98,901.00 | 10.00 | 89,910.00 | 16.50 | 148,351.50 | | 0041 | TS-741-10042 | Plug and Abandon Water Main | 16 | EACH | 2,975.00 | 47,600.00 | 525.00 | 8,400.00 | 1,950.00 | 31,200.00 | | 0042 | TS-741-23020 | Insertion Valve (20”) | 8 | EACH | 50,000.00 | 400,000.00 | 74,000.00 | 592,000.00 | 56,000.00 | 448,000.00 | | 0043 | TS-741-60029 | Tapping Sleeve, Valve and Box 20" | 8 | EACH | 50,000.00 | 400,000.00 | 72,000.00 | 576,000.00 | 50,000.00 | 400,000.00 | | 0044 | TS-742-00005 | Plug and Abandon Sewer Force Main | 16 | EACH | 5,000.00 | 80,000.00 | 5,500.00 | 88,000.00 | 2,800.00 | 44,800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,199,650.00 | | 4,498,242.60 | | 5,145,627.70 |
|