Proposal:H.012867.6
Parish:Lafayette
Description:S. LARRIVIERE RD: LA 92 - CHEMIN METAIRIE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUBGRADE LAYER (TREATED), ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$9,127,450.90
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $8,677,787.37 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $9,396,114.83 |
| 3 | 44187 | RNGD Infrastructure LLC | $9,744,796.00 |
| 4 | 55505 | MERRICK, LLC | $9,801,991.50 |
| 5 | 54206 | Southern Constructors, LLC | $10,239,585.60 |
| 6 | 55950 | Brown Industrial Construction, LLC | $10,940,542.50 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $16,262,734.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - RNGD Infrastructure LLC | - 4 - MERRICK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.6 | LUMP | 82,939.80 | 82,939.80 | 125,000.00 | 125,000.00 | 140,000.00 | 140,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 73,263.49 | 73,263.49 | 125,000.00 | 125,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 13,942.1 | SQYD | 9.82 | 136,911.42 | 14.25 | 198,674.93 | 10.00 | 139,421.00 | 9.00 | 125,478.90 | | 0004 | 202-02-04501 | Removal of Bridge 912 SQFT | 912 | LUMP | 31,793.59 | 31,793.59 | 33,750.00 | 33,750.00 | 100,000.00 | 100,000.00 | 35,000.00 | 35,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 522 | SQYD | 25.18 | 13,143.96 | 28.50 | 14,877.00 | 10.00 | 5,220.00 | 20.00 | 10,440.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,529.32 | 5,529.32 | 3,300.00 | 3,300.00 | 10,000.00 | 10,000.00 | 500.00 | 500.00 | | 0007 | 203-01-00100 | General Excavation | 4,373 | CUYD | 15.95 | 69,749.35 | 19.50 | 85,273.50 | 30.00 | 131,190.00 | 10.00 | 43,730.00 | | 0008 | 203-03-00100 | Embankment | 7,495 | CUYD | 42.66 | 319,736.70 | 42.50 | 318,537.50 | 35.00 | 262,325.00 | 26.00 | 194,870.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 5 | EACH | 34.81 | 174.05 | 31.00 | 155.00 | 30.00 | 150.00 | 20.00 | 100.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 174.05 | 870.25 | 155.00 | 775.00 | 150.00 | 750.00 | 180.00 | 900.00 | | 0011 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 232.07 | 1,160.35 | 2,565.00 | 12,825.00 | 600.00 | 3,000.00 | 550.00 | 2,750.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 12,490 | LNFT | 2.26 | 28,227.40 | 2.00 | 24,980.00 | 3.00 | 37,470.00 | 2.00 | 24,980.00 | | 0013 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 17,558.4 | SQYD | 25.26 | 443,525.18 | 20.00 | 351,168.00 | 20.00 | 351,168.00 | 24.00 | 421,401.60 | | 0014 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 21,805 | SQYD | 17.41 | 379,625.05 | 18.00 | 392,490.00 | 10.00 | 218,050.00 | 19.50 | 425,197.50 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,000 | CUYD | 61.65 | 61,650.00 | 95.00 | 95,000.00 | 5.00 | 5,000.00 | 110.00 | 110,000.00 | | 0016 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 123 | SQYD | 142.52 | 17,529.96 | 103.00 | 12,669.00 | 100.00 | 12,300.00 | 185.00 | 22,755.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 3,862.6 | TON | 146.78 | 566,952.43 | 144.00 | 556,214.40 | 225.00 | 869,085.00 | 170.00 | 656,642.00 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,312 | LNFT | 167.85 | 220,219.20 | 108.00 | 141,696.00 | 95.00 | 124,640.00 | 115.00 | 150,880.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,044 | LNFT | 179.44 | 187,335.36 | 116.00 | 121,104.00 | 115.00 | 120,060.00 | 130.00 | 135,720.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,687 | LNFT | 190.54 | 511,980.98 | 160.00 | 429,920.00 | 140.00 | 376,180.00 | 175.00 | 470,225.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 3,865 | LNFT | 212.85 | 822,665.25 | 170.00 | 657,050.00 | 200.00 | 773,000.00 | 220.00 | 850,300.00 | | 0022 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,708 | LNFT | 236.85 | 404,539.80 | 221.50 | 378,322.00 | 270.00 | 461,160.00 | 250.00 | 427,000.00 | | 0023 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 1,092 | LNFT | 262.16 | 286,278.72 | 279.00 | 304,668.00 | 350.00 | 382,200.00 | 320.00 | 349,440.00 | | 0024 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 769 | LNFT | 321.11 | 246,933.59 | 318.00 | 244,542.00 | 450.00 | 346,050.00 | 360.00 | 276,840.00 | | 0025 | 702-02-00100 | Manholes (MH-06) | 8 | EACH | 4,285.22 | 34,281.76 | 6,000.00 | 48,000.00 | 6,500.00 | 52,000.00 | 4,500.00 | 36,000.00 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 5,321.97 | 26,609.85 | 5,650.00 | 28,250.00 | 4,500.00 | 22,500.00 | 3,600.00 | 18,000.00 | | 0027 | 702-03-00500 | Catch Basins (CB-06) | 146 | EACH | 6,220.49 | 908,191.54 | 9,050.00 | 1,321,300.00 | 6,500.00 | 949,000.00 | 7,300.00 | 1,065,800.00 | | 0028 | 702-03-00700 | Catch Basins (CB-08) | 17 | EACH | 21,211.85 | 360,601.45 | 18,050.00 | 306,850.00 | 13,000.00 | 221,000.00 | 14,000.00 | 238,000.00 | | 0029 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 6,566.07 | 6,566.07 | 9,900.00 | 9,900.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0030 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 230 | LNFT | 150.85 | 34,695.50 | 135.00 | 31,050.00 | 75.00 | 17,250.00 | 58.00 | 13,340.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 892.1 | SQYD | 67.73 | 60,421.93 | 70.50 | 62,893.05 | 70.00 | 62,447.00 | 110.00 | 98,131.00 | | 0032 | 706-02-00100 | Concrete Drive (4" Thick) | 777.5 | SQYD | 67.73 | 52,660.08 | 75.50 | 58,701.25 | 70.00 | 54,425.00 | 125.00 | 97,187.50 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 12,285 | LNFT | 36.46 | 447,911.10 | 34.00 | 417,690.00 | 35.00 | 429,975.00 | 45.00 | 552,825.00 | | 0034 | 710-01-00100 | Flowable Fill | 50 | CUYD | 207.35 | 10,367.50 | 225.00 | 11,250.00 | 100.00 | 5,000.00 | 220.00 | 11,000.00 | | 0035 | 712-04-00100 | Flexible Revetment | 830 | SQYD | 62.20 | 51,626.00 | 115.00 | 95,450.00 | 150.00 | 124,500.00 | 225.00 | 186,750.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 252,363.69 | 252,363.69 | 161,500.00 | 161,500.00 | 800,000.00 | 800,000.00 | 400,000.00 | 400,000.00 | | 0037 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 13,000 | LNFT | 0.41 | 5,330.00 | 21.00 | 273,000.00 | 0.10 | 1,300.00 | 0.25 | 3,250.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,573.11 | 25,573.11 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0039 | 726-01-00100 | Bedding Material | 1,438 | CUYD | 167.47 | 240,821.86 | 138.00 | 198,444.00 | 100.00 | 143,800.00 | 136.00 | 195,568.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 291,395.16 | 291,395.16 | 600,000.00 | 600,000.00 | 950,000.00 | 950,000.00 | 950,000.00 | 950,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 50 | SQFT | 34.81 | 1,740.50 | 25.50 | 1,275.00 | 30.00 | 1,500.00 | 50.00 | 2,500.00 | | 0042 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 50 | EACH | 203.06 | 10,153.00 | 155.00 | 7,750.00 | 200.00 | 10,000.00 | 165.00 | 8,250.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 160 | EACH | 6.96 | 1,113.60 | 10.25 | 1,640.00 | 25.00 | 4,000.00 | 12.00 | 1,920.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2 | MILE | 6,381.93 | 12,763.86 | 5,130.00 | 10,260.00 | 7,500.00 | 15,000.00 | 6,200.00 | 12,400.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 2,262.68 | 2,262.68 | 1,540.00 | 1,540.00 | 2,500.00 | 2,500.00 | 1,800.00 | 1,800.00 | | 0046 | 735-01-00100 | Mailboxes | 28 | EACH | 29.01 | 812.28 | 25.65 | 718.20 | 25.00 | 700.00 | 10.00 | 280.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 290.09 | 8,122.52 | 255.00 | 7,140.00 | 300.00 | 8,400.00 | 315.00 | 8,820.00 | | 0048 | 739-01-00100 | Hydro-Seeding | 4 | ACRE | 3,248.98 | 12,995.92 | 2,875.00 | 11,500.00 | 3,500.00 | 14,000.00 | 3,500.00 | 14,000.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 114,042.23 | 114,042.23 | 56,300.00 | 56,300.00 | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | | 0050 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 15 | EACH | 2,073.50 | 31,102.50 | 2,700.00 | 40,500.00 | 3,000.00 | 45,000.00 | 500.00 | 7,500.00 | | 0051 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 100 | LNFT | 1,607.92 | 160,792.00 | 2,110.00 | 211,000.00 | 2,000.00 | 200,000.00 | 1,950.00 | 195,000.00 | | 0052 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 150 | LNFT | 1,899.18 | 284,877.00 | 2,465.00 | 369,750.00 | 3,000.00 | 450,000.00 | 2,300.00 | 345,000.00 | | 0053 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 10X9: Steel= 2146 LBS, Concrete = 27.5 CUYD | 2 | EACH | 50,196.55 | 100,393.10 | 38,900.00 | 77,800.00 | 40,000.00 | 80,000.00 | 61,000.00 | 122,000.00 | | 0054 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 8X8: Steel= 1595 LBS, Concrete = 21.4 CUYD | 2 | EACH | 47,877.00 | 95,754.00 | 36,000.00 | 72,000.00 | 35,000.00 | 70,000.00 | 60,000.00 | 120,000.00 | | 0055 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 494.4 | SQYD | 240.11 | 118,710.38 | 505.00 | 249,672.00 | 75.00 | 37,080.00 | 175.00 | 86,520.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,677,787.37 | | 9,396,114.83 | | 9,744,796.00 | | 9,801,991.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Southern Constructors, LLC | - 6 - Brown Industrial Construction, LLC | - 7 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.6 | LUMP | 110,000.00 | 110,000.00 | 750,000.00 | 750,000.00 | 700,000.00 | 700,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 120,000.00 | 120,000.00 | 350,000.00 | 350,000.00 | 203,000.00 | 203,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 13,942.1 | SQYD | 11.00 | 153,363.10 | 15.00 | 209,131.50 | 14.00 | 195,189.40 | | 0004 | 202-02-04501 | Removal of Bridge 912 SQFT | 912 | LUMP | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 28,000.00 | 28,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 522 | SQYD | 17.00 | 8,874.00 | 38.00 | 19,836.00 | 30.00 | 15,660.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 10,000.00 | 10,000.00 | 2,840.00 | 2,840.00 | 15,000.00 | 15,000.00 | | 0007 | 203-01-00100 | General Excavation | 4,373 | CUYD | 16.00 | 69,968.00 | 23.50 | 102,765.50 | 40.00 | 174,920.00 | | 0008 | 203-03-00100 | Embankment | 7,495 | CUYD | 32.00 | 239,840.00 | 48.00 | 359,760.00 | 90.00 | 674,550.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 5 | EACH | 100.00 | 500.00 | 36.00 | 180.00 | 30.00 | 150.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 750.00 | 3,750.00 | 247.00 | 1,235.00 | 150.00 | 750.00 | | 0011 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 1,000.00 | 5,000.00 | 860.00 | 4,300.00 | 1,800.00 | 9,000.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 12,490 | LNFT | 2.50 | 31,225.00 | 2.25 | 28,102.50 | 10.00 | 124,900.00 | | 0013 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 17,558.4 | SQYD | 20.00 | 351,168.00 | 31.00 | 544,310.40 | 30.00 | 526,752.00 | | 0014 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 21,805 | SQYD | 24.50 | 534,222.50 | 26.00 | 566,930.00 | 30.00 | 654,150.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,000 | CUYD | 145.00 | 145,000.00 | 185.00 | 185,000.00 | 180.00 | 180,000.00 | | 0016 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 123 | SQYD | 85.00 | 10,455.00 | 204.00 | 25,092.00 | 85.00 | 10,455.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 3,862.6 | TON | 170.00 | 656,642.00 | 204.00 | 787,970.40 | 192.00 | 741,619.20 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,312 | LNFT | 140.00 | 183,680.00 | 92.00 | 120,704.00 | 230.00 | 301,760.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,044 | LNFT | 150.00 | 156,600.00 | 96.00 | 100,224.00 | 240.00 | 250,560.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,687 | LNFT | 170.00 | 456,790.00 | 114.00 | 306,318.00 | 270.00 | 725,490.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 3,865 | LNFT | 220.00 | 850,300.00 | 148.00 | 572,020.00 | 300.00 | 1,159,500.00 | | 0022 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,708 | LNFT | 260.00 | 444,080.00 | 177.00 | 302,316.00 | 370.00 | 631,960.00 | | 0023 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 1,092 | LNFT | 300.00 | 327,600.00 | 222.00 | 242,424.00 | 470.00 | 513,240.00 | | 0024 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 769 | LNFT | 345.00 | 265,305.00 | 260.00 | 199,940.00 | 590.00 | 453,710.00 | | 0025 | 702-02-00100 | Manholes (MH-06) | 8 | EACH | 8,800.00 | 70,400.00 | 11,565.00 | 92,520.00 | 9,000.00 | 72,000.00 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 8,300.00 | 41,500.00 | 3,963.00 | 19,815.00 | 7,500.00 | 37,500.00 | | 0027 | 702-03-00500 | Catch Basins (CB-06) | 146 | EACH | 9,400.00 | 1,372,400.00 | 8,673.00 | 1,266,258.00 | 14,000.00 | 2,044,000.00 | | 0028 | 702-03-00700 | Catch Basins (CB-08) | 17 | EACH | 15,500.00 | 263,500.00 | 12,550.00 | 213,350.00 | 25,000.00 | 425,000.00 | | 0029 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 15,000.00 | 15,000.00 | 12,220.00 | 12,220.00 | 20,000.00 | 20,000.00 | | 0030 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 230 | LNFT | 80.00 | 18,400.00 | 147.00 | 33,810.00 | 130.00 | 29,900.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 892.1 | SQYD | 100.00 | 89,210.00 | 115.00 | 102,591.50 | 90.00 | 80,289.00 | | 0032 | 706-02-00100 | Concrete Drive (4" Thick) | 777.5 | SQYD | 130.00 | 101,075.00 | 115.00 | 89,412.50 | 90.00 | 69,975.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 12,285 | LNFT | 50.00 | 614,250.00 | 43.00 | 528,255.00 | 45.00 | 552,825.00 | | 0034 | 710-01-00100 | Flowable Fill | 50 | CUYD | 250.00 | 12,500.00 | 272.00 | 13,600.00 | 400.00 | 20,000.00 | | 0035 | 712-04-00100 | Flexible Revetment | 830 | SQYD | 260.00 | 215,800.00 | 187.00 | 155,210.00 | 180.00 | 149,400.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 267,500.00 | 267,500.00 | 700,000.00 | 700,000.00 | | 0037 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 13,000 | LNFT | 1.00 | 13,000.00 | 0.51 | 6,630.00 | 0.20 | 2,600.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 35,000.00 | 35,000.00 | 70,485.00 | 70,485.00 | 80,000.00 | 80,000.00 | | 0039 | 726-01-00100 | Bedding Material | 1,438 | CUYD | 145.00 | 208,510.00 | 154.00 | 221,452.00 | 190.00 | 273,220.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 700,000.00 | 700,000.00 | 1,050,000.00 | 1,050,000.00 | 1,600,000.00 | 1,600,000.00 | | 0041 | 729-01-00100 | Sign (Type A) | 50 | SQFT | 50.00 | 2,500.00 | 40.00 | 2,000.00 | 30.00 | 1,500.00 | | 0042 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 50 | EACH | 150.00 | 7,500.00 | 113.00 | 5,650.00 | 175.00 | 8,750.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 160 | EACH | 20.00 | 3,200.00 | 17.00 | 2,720.00 | 10.00 | 1,600.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2 | MILE | 13,000.00 | 26,000.00 | 10,800.00 | 21,600.00 | 5,000.00 | 10,000.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 7,000.00 | 7,000.00 | 5,695.00 | 5,695.00 | 1,500.00 | 1,500.00 | | 0046 | 735-01-00100 | Mailboxes | 28 | EACH | 250.00 | 7,000.00 | 28.50 | 798.00 | 250.00 | 7,000.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 300.00 | 8,400.00 | 285.00 | 7,980.00 | 20.00 | 560.00 | | 0048 | 739-01-00100 | Hydro-Seeding | 4 | ACRE | 3,750.00 | 15,000.00 | 3,200.00 | 12,800.00 | 2,800.00 | 11,200.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 90,000.00 | 90,000.00 | 330,000.00 | 330,000.00 | | 0050 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 15 | EACH | 2,000.00 | 30,000.00 | 1,060.00 | 15,900.00 | 2,000.00 | 30,000.00 | | 0051 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 100 | LNFT | 2,900.00 | 290,000.00 | 2,105.00 | 210,500.00 | 3,200.00 | 320,000.00 | | 0052 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 150 | LNFT | 3,025.00 | 453,750.00 | 2,450.00 | 367,500.00 | 3,400.00 | 510,000.00 | | 0053 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 10X9: Steel= 2146 LBS, Concrete = 27.5 CUYD | 2 | EACH | 50,000.00 | 100,000.00 | 40,000.00 | 80,000.00 | 115,000.00 | 230,000.00 | | 0054 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 8X8: Steel= 1595 LBS, Concrete = 21.4 CUYD | 2 | EACH | 40,000.00 | 80,000.00 | 35,000.00 | 70,000.00 | 115,000.00 | 230,000.00 | | 0055 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 494.4 | SQYD | 120.00 | 59,328.00 | 198.00 | 97,891.20 | 250.00 | 123,600.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,239,585.60 | | 10,940,542.50 | | 16,262,734.60 |
|