Proposal:4400030522
Parish:Ascension, Assumption, East Baton Rouge, East Feliciana, Iberville
Routes:LA 1, LA 19, LA 22, LA 308, LA 409, LA 411, LA 63, LA 77, LA 955
Description:DIST 61: DRAINAGE STRUCTURE REPLACEMENTS
Type Construction:GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$1,183,224.50
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $630,656.00 |
| 2 | 65070 | Gascot Construction, LLC | $902,652.83 |
| 3 | 48896 | Command Construction Industries LLC | $925,922.00 |
| 4 | 72429 | Arbour Construction, LLC | $1,035,926.50 |
| 5 | 46716 | BRUDD CONSTRUCTION CO., LLC | $1,044,940.24 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $1,073,126.37 |
| 7 | 34263 | La Contracting Enterprise LLC | $1,418,427.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - Gascot Construction, LLC | - 3 - Command Construction Industries LLC | - 4 - Arbour Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,500.00 | 8,500.00 | 65,632.00 | 65,632.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 7,500.00 | 7,500.00 | 46,873.50 | 46,873.50 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | | 0003 | 204-06-00100 | Temporary Silt Fencing | 1,300 | LNFT | 0.10 | 130.00 | 4.50 | 5,850.00 | 5.00 | 6,500.00 | 1.00 | 1,300.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 37.9 | CUYD | 125.00 | 4,737.50 | 199.90 | 7,576.21 | 100.00 | 3,790.00 | 200.00 | 7,580.00 | | 0005 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 213 | SQYD | 120.00 | 25,560.00 | 101.10 | 21,534.30 | 150.00 | 31,950.00 | 200.00 | 42,600.00 | | 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 291 | SQYD | 200.00 | 58,200.00 | 133.05 | 38,717.55 | 250.00 | 72,750.00 | 225.00 | 65,475.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 150 | SQYD | 200.00 | 30,000.00 | 260.60 | 39,090.00 | 350.00 | 52,500.00 | 280.00 | 42,000.00 | | 0008 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 56 | LNFT | 250.00 | 14,000.00 | 263.45 | 14,753.20 | 300.00 | 16,800.00 | 390.00 | 21,840.00 | | 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 112 | LNFT | 250.00 | 28,000.00 | 299.40 | 33,532.80 | 375.00 | 42,000.00 | 480.00 | 53,760.00 | | 0010 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) CPPPDW | 175 | LNFT | 250.00 | 43,750.00 | 299.65 | 52,438.75 | 400.00 | 70,000.00 | 460.00 | 80,500.00 | | 0011 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 204 | LNFT | 350.00 | 71,400.00 | 387.95 | 79,141.80 | 475.00 | 96,900.00 | 400.00 | 81,600.00 | | 0012 | 701-01-01045 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) CPPPDW | 90 | LNFT | 350.00 | 31,500.00 | 430.55 | 38,749.50 | 475.00 | 42,750.00 | 968.00 | 87,120.00 | | 0013 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 60 | LNFT | 450.00 | 27,000.00 | 506.35 | 30,381.00 | 550.00 | 33,000.00 | 520.00 | 31,200.00 | | 0014 | 701-01-01085 | Cross Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) CPPPDW | 80 | LNFT | 600.00 | 48,000.00 | 530.40 | 42,432.00 | 700.00 | 56,000.00 | 733.00 | 58,640.00 | | 0015 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 30 | LNFT | 250.00 | 7,500.00 | 612.95 | 18,388.50 | 300.00 | 9,000.00 | 580.00 | 17,400.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 430 | LNFT | 1.00 | 430.00 | 6.90 | 2,967.00 | 1.00 | 430.00 | 53.00 | 22,790.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 6,000.00 | 24,000.00 | 5,250.45 | 21,001.80 | 7,500.00 | 30,000.00 | 6,000.00 | 24,000.00 | | 0018 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 8,000.00 | 8,000.00 | 6,389.60 | 6,389.60 | 10,000.00 | 10,000.00 | 17,400.00 | 17,400.00 | | 0019 | 711-01-02000 | Riprap (10 lb, 10" Thick) | 3 | SQYD | 250.00 | 750.00 | 507.10 | 1,521.30 | 500.00 | 1,500.00 | 580.00 | 1,740.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 3 | SQYD | 7.00 | 21.00 | 448.75 | 1,346.25 | 5.00 | 15.00 | 232.00 | 696.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 123,379.20 | 123,379.20 | 50,000.00 | 50,000.00 | 90,000.00 | 90,000.00 | | 0022 | 726-01-00100 | Bedding Material | 94.5 | CUYD | 1.00 | 94.50 | 110.55 | 10,446.98 | 150.00 | 14,175.00 | 105.00 | 9,922.50 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 94,432.65 | 94,432.65 | 90,000.00 | 90,000.00 | 78,000.00 | 78,000.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 100.00 | 2,200.00 | 94.80 | 2,085.60 | 250.00 | 5,500.00 | 100.00 | 2,200.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 11 | EACH | 25.00 | 275.00 | 20.00 | 220.00 | 30.00 | 330.00 | 29.00 | 319.00 | | 0026 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 680 | LNFT | 8.00 | 5,440.00 | 1.50 | 1,020.00 | 8.00 | 5,440.00 | 17.40 | 11,832.00 | | 0027 | 739-01-00100 | Hydro-Seeding | 1.3 | ACRE | 3,800.00 | 4,940.00 | 6,932.30 | 9,011.99 | 5,000.00 | 6,500.00 | 8,120.00 | 10,556.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 36,505.65 | 36,505.65 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0029 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,864 | INLF | 2.00 | 7,728.00 | 0.85 | 3,284.40 | 3.00 | 11,592.00 | 4.00 | 15,456.00 | | 0030 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 6 | EACH | 1,000.00 | 6,000.00 | 8,991.55 | 53,949.30 | 2,750.00 | 16,500.00 | 5,000.00 | 30,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 630,656.00 | | 902,652.83 | | 925,922.00 | | 1,035,926.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - BRUDD CONSTRUCTION CO., LLC | - 6 - KCR CONTRACTORS, LLC | - 7 - La Contracting Enterprise LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 34,000.00 | 34,000.00 | 34,575.95 | 34,575.95 | 120,000.00 | 120,000.00 | | 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 64,970.00 | 64,970.00 | 110,000.00 | 110,000.00 | | 0003 | 204-06-00100 | Temporary Silt Fencing | 1,300 | LNFT | 2.40 | 3,120.00 | 2.20 | 2,860.00 | 5.50 | 7,150.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 37.9 | CUYD | 286.00 | 10,839.40 | 190.65 | 7,225.64 | 470.00 | 17,813.00 | | 0005 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 213 | SQYD | 36.00 | 7,668.00 | 145.26 | 30,940.38 | 540.00 | 115,020.00 | | 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 291 | SQYD | 390.00 | 113,490.00 | 248.44 | 72,296.04 | 485.00 | 141,135.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 150 | SQYD | 412.00 | 61,800.00 | 220.45 | 33,067.50 | 530.00 | 79,500.00 | | 0008 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 56 | LNFT | 506.00 | 28,336.00 | 641.14 | 35,903.84 | 478.00 | 26,768.00 | | 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 112 | LNFT | 430.00 | 48,160.00 | 662.99 | 74,254.88 | 556.00 | 62,272.00 | | 0010 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) CPPPDW | 175 | LNFT | 336.00 | 58,800.00 | 504.53 | 88,292.75 | 352.00 | 61,600.00 | | 0011 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 204 | LNFT | 402.00 | 82,008.00 | 625.33 | 127,567.32 | 600.00 | 122,400.00 | | 0012 | 701-01-01045 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) CPPPDW | 90 | LNFT | 650.00 | 58,500.00 | 582.27 | 52,404.30 | 521.00 | 46,890.00 | | 0013 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 60 | LNFT | 605.00 | 36,300.00 | 813.64 | 48,818.40 | 740.00 | 44,400.00 | | 0014 | 701-01-01085 | Cross Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) CPPPDW | 80 | LNFT | 667.00 | 53,360.00 | 720.86 | 57,668.80 | 630.00 | 50,400.00 | | 0015 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 30 | LNFT | 270.00 | 8,100.00 | 826.08 | 24,782.40 | 585.00 | 17,550.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 430 | LNFT | 24.00 | 10,320.00 | 23.49 | 10,100.70 | 71.00 | 30,530.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 6,225.00 | 24,900.00 | 8,582.93 | 34,331.72 | 10,600.00 | 42,400.00 | | 0018 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 7,100.00 | 7,100.00 | 9,027.60 | 9,027.60 | 17,800.00 | 17,800.00 | | 0019 | 711-01-02000 | Riprap (10 lb, 10" Thick) | 3 | SQYD | 269.00 | 807.00 | 180.00 | 540.00 | 147.00 | 441.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 3 | SQYD | 10.00 | 30.00 | 10.00 | 30.00 | 37.00 | 111.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 134,000.00 | 134,000.00 | 66,962.50 | 66,962.50 | 75,000.00 | 75,000.00 | | 0022 | 726-01-00100 | Bedding Material | 94.5 | CUYD | 166.00 | 15,687.00 | 190.70 | 18,021.15 | 277.00 | 26,176.50 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 100,000.00 | 100,000.00 | 140,000.00 | 140,000.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 100.00 | 2,200.00 | 143.50 | 3,157.00 | 105.00 | 2,310.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 11 | EACH | 28.00 | 308.00 | 27.50 | 302.50 | 35.00 | 385.00 | | 0026 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 680 | LNFT | 9.00 | 6,120.00 | 8.80 | 5,984.00 | 11.00 | 7,480.00 | | 0027 | 739-01-00100 | Hydro-Seeding | 1.3 | ACRE | 3,150.00 | 4,095.00 | 2,369.23 | 3,080.00 | 7,000.00 | 9,100.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 46,800.00 | 46,800.00 | 14,000.00 | 14,000.00 | | 0029 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,864 | INLF | 2.56 | 9,891.84 | 1.50 | 5,796.00 | 1.50 | 5,796.00 | | 0030 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 6 | EACH | 10,000.00 | 60,000.00 | 2,227.50 | 13,365.00 | 4,000.00 | 24,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,044,940.24 | | 1,073,126.37 | | 1,418,427.50 |
|