Proposal:H.015950.6
Parish:Vermilion
Routes:LA 335 & LA 694
Description:LA 335: LA 35 - E. JCT. LA 694
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$9,286,458.93
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $7,952,106.94 |
| 2 | 34356 | Prairie Contractors LLC | $9,240,789.40 |
| 3 | 51821 | Elliott Construction, LLC | $9,997,312.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions Remove homemade brick and concrete revetment, approximately 18 SQYD | 1 | LUMP | 6,230.58 | 6,230.58 | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,363 | SQYD | 16.40 | 22,353.20 | 22.00 | 29,986.00 | 30.00 | 40,890.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure 12" Thick | 2,654.9 | SQYD | 11.86 | 31,487.11 | 25.00 | 66,372.50 | 25.00 | 66,372.50 | | 0004 | 202-02-03030 | Removal of Pavement Structure 4" Thick | 3,548.9 | SQYD | 7.11 | 25,232.68 | 13.00 | 46,135.70 | 20.00 | 70,978.00 | | 0005 | 202-02-04560 | Removal of Bridge Joint (Poured Joint Seals) | 477 | LNFT | 11.60 | 5,533.20 | 12.00 | 5,724.00 | 11.00 | 5,247.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 39 | SQYD | 24.95 | 973.05 | 175.00 | 6,825.00 | 50.00 | 1,950.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 1,042.3 | LNFT | 8.12 | 8,463.48 | 15.00 | 15,634.50 | 15.00 | 15,634.50 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP, 30"RCP | 32 | LNFT | 178.30 | 5,705.60 | 40.00 | 1,280.00 | 50.00 | 1,600.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" CMP | 65 | LNFT | 183.67 | 11,938.55 | 75.00 | 4,875.00 | 90.00 | 5,850.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,874 | CUYD | 26.23 | 75,385.02 | 60.00 | 172,440.00 | 50.00 | 143,700.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 70 | EACH | 174.05 | 12,183.50 | 165.00 | 11,550.00 | 165.00 | 11,550.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 2,280 | LNFT | 2.32 | 5,289.60 | 2.65 | 6,042.00 | 2.25 | 5,130.00 | | 0013 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 2,654.9 | SQYD | 32.22 | 85,540.88 | 63.00 | 167,258.70 | 40.00 | 106,196.00 | | 0014 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 96,745 | SQYD | 9.88 | 955,840.60 | 17.25 | 1,668,851.25 | 14.00 | 1,354,430.00 | | 0015 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 137.73 | 13,773.00 | 10.00 | 1,000.00 | 40.00 | 4,000.00 | | 0016 | 304-01-00100 | Lime | 290.57 | TON | 325.83 | 94,676.42 | 550.00 | 159,813.50 | 375.00 | 108,963.75 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 24,600 | SQYD | 6.61 | 162,606.00 | 8.50 | 209,100.00 | 5.00 | 123,000.00 | | 0018 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 98,393 | SQYD | 10.41 | 1,024,271.13 | 13.50 | 1,328,305.50 | 18.00 | 1,771,074.00 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,154 | CUYD | 61.42 | 193,718.68 | 75.00 | 236,550.00 | 150.00 | 473,100.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 153.47 | 15,347.00 | 75.00 | 7,500.00 | 90.00 | 9,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 25,641.5 | TON | 129.30 | 3,315,445.95 | 124.00 | 3,179,546.00 | 140.00 | 3,589,810.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,157 | TON | 166.69 | 192,860.33 | 190.00 | 219,830.00 | 195.00 | 225,615.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 82,645 | SQYD | 3.03 | 250,414.35 | 2.80 | 231,406.00 | 3.00 | 247,935.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,592 | CUYD | 0.01 | -25.92 | 0.01 | -25.92 | 0.01 | -25.92 | | 0025 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 104 | SQYD | 336.00 | 34,944.00 | 250.00 | 26,000.00 | 280.00 | 29,120.00 | | 0026 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 8 | LNFT | 351.35 | 2,810.80 | 425.00 | 3,400.00 | 375.00 | 3,000.00 | | 0027 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 24 | LNFT | 281.91 | 6,765.84 | 450.00 | 10,800.00 | 400.00 | 9,600.00 | | 0028 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 80 | LNFT | 769.78 | 61,582.40 | 2,500.00 | 200,000.00 | 1,325.00 | 106,000.00 | | 0029 | 701-15-00100 | Concrete Collar | 4 | EACH | 1,377.29 | 5,509.16 | 3,250.00 | 13,000.00 | 2,500.00 | 10,000.00 | | 0030 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 80 | LNFT | 337.76 | 27,020.80 | 18.00 | 1,440.00 | 50.00 | 4,000.00 | | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 181.3 | LNFT | 35.40 | 6,418.02 | 40.00 | 7,252.00 | 35.00 | 6,345.50 | | 0032 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 140.40 | 28,080.00 | 150.00 | 30,000.00 | 135.00 | 27,000.00 | | 0033 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,235.28 | 4,235.28 | 5,000.00 | 5,000.00 | 4,015.00 | 4,015.00 | | 0034 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 7 | EACH | 3,771.14 | 26,397.98 | 4,500.00 | 31,500.00 | 3,575.00 | 25,025.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 39.1 | SQYD | 88.54 | 3,461.91 | 275.00 | 10,752.50 | 150.00 | 5,865.00 | | 0036 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 207 | SQYD | 102.84 | 21,287.88 | 225.00 | 46,575.00 | 159.88 | 33,095.16 | | 0037 | 711-04-00100 | Geotextile Fabric | 207 | SQYD | 24.83 | 5,139.81 | 10.00 | 2,070.00 | 7.00 | 1,449.00 | | 0038 | 712-02-00100 | Sacked Concrete Revetment | 11 | SQYD | 968.95 | 10,658.45 | 750.00 | 8,250.00 | 500.00 | 5,500.00 | | 0039 | 712-04-00100 | Flexible Revetment | 15 | SQYD | 710.63 | 10,659.45 | 350.00 | 5,250.00 | 500.00 | 7,500.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 137,153.37 | 137,153.37 | 200,000.00 | 200,000.00 | 165,000.00 | 165,000.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 19.545 | MILE | 590.27 | 11,536.83 | 650.00 | 12,704.25 | 860.00 | 16,808.70 | | 0042 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 18.87 | MILE | 590.27 | 11,138.39 | 1.00 | 18.87 | 330.00 | 6,227.10 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 41.148 | MILE | 983.78 | 40,480.58 | 1.00 | 41.15 | 605.00 | 24,894.54 | | 0044 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 26,339.95 | 26,339.95 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.902 | MILE | 351.00 | 4,528.60 | 1,200.00 | 15,482.40 | 1,100.00 | 14,192.20 | | 0046 | 726-01-00100 | Bedding Material 6" Thick | 18.6 | CUYD | 158.39 | 2,946.05 | 225.00 | 4,185.00 | 185.00 | 3,441.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 617,810.70 | 617,810.70 | 600,000.00 | 600,000.00 | 850,000.00 | 850,000.00 | | 0048 | 729-16-00200 | Object Marker Assembly (Type 2) | 26 | EACH | 87.03 | 2,262.78 | 80.00 | 2,080.00 | 75.00 | 1,950.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 110.23 | 2,204.60 | 145.00 | 2,900.00 | 105.00 | 2,100.00 | | 0050 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 572 | EACH | 8.12 | 4,644.64 | 8.00 | 4,576.00 | 11.00 | 6,292.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 883 | EACH | 4.64 | 4,097.12 | 5.00 | 4,415.00 | 7.00 | 6,181.00 | | 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.716 | MILE | 4,873.47 | 66,844.51 | 5,000.00 | 68,580.00 | 5,500.00 | 75,438.00 | | 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.29 | MILE | 1,276.39 | 8,028.49 | 1,250.00 | 7,862.50 | 1,870.00 | 11,762.30 | | 0054 | 732-05-00100 | Removal of Existing Markings | 0.033 | MILE | 23,207.00 | 765.83 | 25,000.00 | 825.00 | 5,000.00 | 165.00 | | 0055 | 735-01-00100 | Mailboxes | 71 | EACH | 29.01 | 2,059.71 | 10.00 | 710.00 | 28.00 | 1,988.00 | | 0056 | 735-02-00100 | Mailbox Supports (Single) | 71 | EACH | 232.07 | 16,476.97 | 350.00 | 24,850.00 | 220.00 | 15,620.00 | | 0057 | 739-01-00100 | Hydro-Seeding | 18.73 | ACRE | 3,190.96 | 59,766.68 | 3,000.00 | 56,190.00 | 3,025.00 | 56,658.25 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 143,434.40 | 143,434.40 | 1,000.00 | 1,000.00 | 20,000.00 | 20,000.00 | | 0059 | 815-03-00300 | Joint Seal (Poured) | 477 | LNFT | 40.61 | 19,370.97 | 40.00 | 19,080.00 | 40.00 | 19,080.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,952,106.94 | | 9,240,789.40 | | 9,997,312.58 |
|