Proposal:H.015834.6
Parish:Terrebonne
Routes:LA 57
Description:LA 57: LA 24 - OAKLAWN DR
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$3,445,075.30
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,291,334.63 |
| 2 | 62139 | Huey P. Stockstill, LLC | $3,930,337.78 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 233 | SQYD | 38.50 | 8,970.50 | 30.00 | 6,990.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 1,312 | LNFT | 25.10 | 32,931.20 | 17.50 | 22,960.00 | | 0004 | 202-02-38200 | Removal of Signs | 2 | EACH | 15.00 | 30.00 | 10.00 | 20.00 | | 0005 | 203-01-00100 | General Excavation | 12.3 | CUYD | 110.00 | 1,353.00 | 410.00 | 5,043.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 38.2 | CUYD | 55.00 | 2,101.00 | 150.00 | 5,730.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 7,507.7 | TON | 138.00 | 1,036,062.60 | 158.00 | 1,186,216.60 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 501.1 | TON | 284.00 | 142,312.40 | 305.00 | 152,835.50 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 72,470 | SQYD | 4.10 | 297,127.00 | 3.25 | 235,527.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,022 | CUYD | 0.01 | -30.22 | 0.01 | -30.22 | | 0011 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,433 | SQYD | 162.00 | 394,146.00 | 200.00 | 486,600.00 | | 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 37,535 | LNFT | 2.55 | 95,714.25 | 3.00 | 112,605.00 | | 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 30,746 | LNFT | 2.55 | 78,402.30 | 3.25 | 99,924.50 | | 0014 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 225.00 | 450.00 | 350.00 | 700.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 16 | EACH | 4,275.00 | 68,400.00 | 4,250.00 | 68,000.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 231.5 | SQYD | 79.00 | 18,288.50 | 90.00 | 20,835.00 | | 0017 | 706-04-00110 | Curb Ramps TYPE 3 | 8.1 | SQYD | 345.00 | 2,794.50 | 400.00 | 3,240.00 | | 0018 | 706-04-00110 | Curb Ramps TYPE 4 | 17.9 | SQYD | 345.00 | 6,175.50 | 400.00 | 7,160.00 | | 0019 | 706-04-00110 | Curb Ramps TYPE 7 | 13.3 | SQYD | 295.00 | 3,923.50 | 400.00 | 5,320.00 | | 0020 | 706-04-00110 | Curb Ramps TYPE 8 | 46.5 | SQYD | 320.00 | 14,880.00 | 400.00 | 18,600.00 | | 0021 | 707-01-00100 | Concrete Curb | 788 | LNFT | 42.00 | 33,096.00 | 50.00 | 39,400.00 | | 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 508 | LNFT | 63.00 | 32,004.00 | 55.00 | 27,940.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 300,000.00 | 300,000.00 | 530,000.00 | 530,000.00 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,290 | LNFT | 0.15 | 343.50 | 0.25 | 572.50 | | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,468 | LNFT | 0.25 | 367.00 | 0.50 | 734.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.444 | MILE | 642.00 | 7,989.05 | 275.00 | 3,422.10 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.444 | MILE | 1.00 | 12.44 | 650.00 | 8,088.60 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.83 | MILE | 801.00 | 11,878.83 | 900.00 | 13,347.00 | | 0029 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 15.00 | 60.00 | 25.00 | 100.00 | | 0030 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 15.00 | 90.00 | 25.00 | 150.00 | | 0031 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 84 | EACH | 15.00 | 1,260.00 | 25.00 | 2,100.00 | | 0032 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 15.00 | 60.00 | 25.00 | 100.00 | | 0033 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 15.00 | 90.00 | 25.00 | 150.00 | | 0034 | 717-01-00100 | Seeding | 2 | LB | 49.10 | 98.20 | 25.00 | 50.00 | | 0035 | 718-01-00100 | Fertilizer | 109 | LB | 17.00 | 1,853.00 | 15.00 | 1,635.00 | | 0036 | 726-01-00100 | Bedding Material | 0.3 | CUYD | 115.00 | 34.50 | 3,000.00 | 900.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 393,000.00 | 393,000.00 | | 0038 | 729-01-00100 | Sign (Type A) | 6 | SQFT | 30.25 | 181.50 | 30.00 | 180.00 | | 0039 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 2 | EACH | 151.00 | 302.00 | 250.00 | 500.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,341 | EACH | 4.01 | 5,377.41 | 4.00 | 5,364.00 | | 0041 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,145 | LNFT | 3.01 | 3,446.45 | 3.25 | 3,721.25 | | 0042 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 180 | LNFT | 3.51 | 631.80 | 4.25 | 765.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 776 | LNFT | 13.10 | 10,165.60 | 15.00 | 11,640.00 | | 0044 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 115 | LNFT | 4.00 | 460.00 | 4.00 | 460.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.415 | MILE | 4,400.00 | 32,626.00 | 5,250.00 | 38,928.75 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.222 | MILE | 1,210.00 | 7,528.62 | 1,350.00 | 8,399.70 | | 0047 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 305.00 | 1,220.00 | 365.00 | 1,460.00 | | 0048 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 326.00 | 1,956.00 | 365.00 | 2,190.00 | | 0049 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 42 | EACH | 305.00 | 12,810.00 | 365.00 | 15,330.00 | | 0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 305.00 | 610.00 | 365.00 | 730.00 | | 0051 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 505.00 | 1,515.00 | 575.00 | 1,725.00 | | 0052 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 2 | EACH | 760.00 | 1,520.00 | 900.00 | 1,800.00 | | 0053 | 735-01-00100 | Mailboxes | 58 | EACH | 1.00 | 58.00 | 55.00 | 3,190.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 42 | EACH | 205.00 | 8,610.00 | 175.00 | 7,350.00 | | 0055 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 305.00 | 2,440.00 | 210.00 | 1,680.00 | | 0056 | 736-01-00100 | Trenching and Backfilling | 45 | LNFT | 10.70 | 481.50 | 11.00 | 495.00 | | 0057 | 736-09-00100 | Loop Detector | 1,769 | LNFT | 34.00 | 60,146.00 | 40.00 | 70,760.00 | | 0058 | 736-10-00200 | Underground Junction Box (Type E) | 9 | EACH | 1,390.00 | 12,510.00 | 1,650.00 | 14,850.00 | | 0059 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 45 | LNFT | 7.80 | 351.00 | 8.50 | 382.50 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 23,500.00 | 23,500.00 | 68,500.00 | 68,500.00 | | 0061 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 700.00 | 4,200.00 | 750.00 | 4,500.00 | | 0062 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 36,642 | LNFT | 2.01 | 73,650.42 | 1.50 | 54,963.00 | | 0063 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 30,548 | LNFT | 2.01 | 61,401.48 | 1.75 | 53,459.00 | | 0064 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 67,190 | LNFT | 0.87 | 58,455.30 | 1.15 | 77,268.50 | | 0065 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,912 | INLF | 1.00 | 1,912.00 | 2.50 | 4,780.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,291,334.63 | | 3,930,337.78 |
|