Proposal:H.015799.6
Parish:Lafourche
Routes:LA 308
Description:LA 308: 0.2 MI S US 90 - LA 182
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,756,545.90
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $2,738,171.00 |
| 2 | 73475 | Madden Gulf Coast, LLC | $3,075,138.73 |
| 3 | 62139 | Huey P. Stockstill, LLC | $3,755,107.23 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement EXISTING GUARDRAIL PADS | 234.7 | SQYD | 105.00 | 24,643.50 | 35.00 | 8,214.50 | 19.00 | 4,459.30 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 17 | SQYD | 40.50 | 688.50 | 50.00 | 850.00 | 38.00 | 646.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 272 | LNFT | 28.50 | 7,752.00 | 20.00 | 5,440.00 | 22.00 | 5,984.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 993.8 | LNFT | 14.25 | 14,161.65 | 7.50 | 7,453.50 | 15.00 | 14,907.00 | | 0005 | 202-02-38200 | Removal of Signs | 4 | EACH | 126.00 | 504.00 | 25.00 | 100.00 | 16.00 | 64.00 | | 0006 | 202-03-38000 | Relocation of Sign | 2 | EACH | 202.00 | 404.00 | 125.00 | 250.00 | 115.00 | 230.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 624 | CUYD | 29.00 | 18,096.00 | 100.00 | 62,400.00 | 50.00 | 31,200.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 4,018 | TON | 139.00 | 558,502.00 | 116.00 | 466,088.00 | 220.00 | 883,960.00 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 445.8 | TON | 295.00 | 131,511.00 | 250.00 | 111,450.00 | 305.00 | 135,969.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 57,126 | SQYD | 3.50 | 199,941.00 | 2.50 | 142,815.00 | 3.00 | 171,378.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,382 | CUYD | 1.00 | -2,382.00 | 0.01 | -23.82 | 0.00 | 0.00 | | 0012 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 10,671 | SQYD | 120.00 | 1,280,520.00 | 160.50 | 1,712,695.50 | 182.00 | 1,942,122.00 | | 0013 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 300 | LNFT | 61.00 | 18,300.00 | 174.00 | 52,200.00 | 68.00 | 20,400.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 387.5 | LNFT | 35.50 | 13,756.25 | 30.00 | 11,625.00 | 38.00 | 14,725.00 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 126.00 | 6,300.00 | 118.50 | 5,925.00 | 140.00 | 7,000.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,550.00 | 14,200.00 | 3,750.00 | 15,000.00 | 3,850.00 | 15,400.00 | | 0017 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,050.00 | 6,100.00 | 3,285.00 | 6,570.00 | 3,350.00 | 6,700.00 | | 0018 | 706-04-00110 | Curb Ramps TYPE 7 | 26.6 | SQYD | 320.00 | 8,512.00 | 250.00 | 6,650.00 | 315.00 | 8,379.00 | | 0019 | 707-01-00100 | Concrete Curb | 272 | LNFT | 76.00 | 20,672.00 | 50.00 | 13,600.00 | 50.00 | 13,600.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 215,000.00 | 215,000.00 | 118,000.00 | 118,000.00 | 125,000.00 | 125,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,312 | LNFT | 0.15 | 196.80 | 0.15 | 196.80 | 0.15 | 196.80 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,316 | LNFT | 0.25 | 329.00 | 0.25 | 329.00 | 0.50 | 658.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.412 | MILE | 336.00 | 1,818.43 | 350.00 | 1,894.20 | 300.00 | 1,623.60 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.412 | MILE | 600.00 | 3,247.20 | 600.00 | 3,247.20 | 525.00 | 2,841.30 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.432 | MILE | 800.00 | 12,345.60 | 800.00 | 12,345.60 | 600.00 | 9,259.20 | | 0026 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 15.00 | 120.00 | 15.00 | 120.00 | 20.00 | 160.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 3.6 | TON | 590.00 | 2,124.00 | 600.00 | 2,160.00 | 500.00 | 1,800.00 | | 0028 | 717-01-00100 | Seeding | 107 | LB | 13.25 | 1,417.75 | 14.00 | 1,498.00 | 10.00 | 1,070.00 | | 0029 | 718-01-00100 | Fertilizer | 1,784 | LB | 1.40 | 2,497.60 | 1.50 | 2,676.00 | 1.00 | 1,784.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 87,750.00 | 87,750.00 | 215,000.00 | 215,000.00 | 250,000.00 | 250,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 97.00 | 582.00 | 90.00 | 540.00 | 108.00 | 648.00 | | 0032 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,375.00 | 1,375.00 | 1,500.00 | 1,500.00 | 1,750.00 | 1,750.00 | | 0033 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 228.00 | 228.00 | 350.00 | 350.00 | 165.00 | 165.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,057 | EACH | 4.10 | 4,333.70 | 4.00 | 4,228.00 | 3.50 | 3,699.50 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 452 | LNFT | 3.05 | 1,378.60 | 3.00 | 1,356.00 | 3.25 | 1,469.00 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 569 | LNFT | 12.25 | 6,970.25 | 12.00 | 6,828.00 | 11.00 | 6,259.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 89 | LNFT | 13.25 | 1,179.25 | 13.00 | 1,157.00 | 13.00 | 1,157.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.716 | MILE | 4,075.00 | 31,442.70 | 4,000.00 | 30,864.00 | 4,100.00 | 31,635.60 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.395 | MILE | 1,020.00 | 1,422.90 | 1,000.00 | 1,395.00 | 1,325.00 | 1,848.38 | | 0040 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.039 | MILE | 15,300.00 | 596.70 | 15,000.00 | 585.00 | 2,250.00 | 87.75 | | 0041 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 280.00 | 1,120.00 | 275.00 | 1,100.00 | 325.00 | 1,300.00 | | 0042 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 2 | EACH | 750.00 | 1,500.00 | 750.00 | 1,500.00 | 325.00 | 650.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.019 | MILE | 10,245.00 | 194.66 | 10,000.00 | 190.00 | 2,700.00 | 51.30 | | 0044 | 735-01-00100 | Mailboxes | 19 | EACH | 1.00 | 19.00 | 20.00 | 380.00 | 2.00 | 38.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 255.00 | 4,845.00 | 250.00 | 4,750.00 | 285.00 | 5,415.00 | | 0046 | 736-01-00100 | Trenching and Backfilling | 5 | LNFT | 12.50 | 62.50 | 12.50 | 62.50 | 13.50 | 67.50 | | 0047 | 736-09-00100 | Loop Detector | 72 | LNFT | 45.25 | 3,258.00 | 45.00 | 3,240.00 | 50.00 | 3,600.00 | | 0048 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,325.00 | 1,325.00 | 1,320.00 | 1,320.00 | 1,475.00 | 1,475.00 | | 0049 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 5 | LNFT | 4.80 | 24.00 | 4.75 | 23.75 | 5.00 | 25.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,035.46 | 10,035.46 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | | 0051 | NS-719-00002 | Tree Trimming | 1 | LUMP | 17,250.00 | 17,250.00 | 17,000.00 | 17,000.00 | 10,250.00 | 10,250.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,738,171.00 | | 3,075,138.73 | | 3,755,107.23 |
|