Proposal:H.015774.6
Parish:St. Landry
Routes:LA 359
Description:LA 359: LOCAL ROAD (BOLDEN)-LA 10
Type Construction:BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,367,398.26
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,622,532.11 |
| 2 | 34356 | Prairie Contractors LLC | $4,623,775.65 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $5,028,203.23 |
| 4 | 51821 | Elliott Construction, LLC | $5,301,487.81 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Prairie Contractors LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 4 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 | 2,500.00 | 2,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 70 | SQYD | 140.00 | 9,800.00 | 100.00 | 7,000.00 | 65.00 | 4,550.00 | 30.00 | 2,100.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 108 | SQYD | 90.00 | 9,720.00 | 50.00 | 5,400.00 | 75.00 | 8,100.00 | 50.00 | 5,400.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP, 30" RCP) | 16 | LNFT | 18.00 | 288.00 | 35.00 | 560.00 | 135.00 | 2,160.00 | 95.00 | 1,520.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,600 | CUYD | 21.00 | 33,600.00 | 35.00 | 56,000.00 | 20.00 | 32,000.00 | 45.00 | 72,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 46 | EACH | 175.00 | 8,050.00 | 200.00 | 9,200.00 | 150.00 | 6,900.00 | 175.00 | 8,050.00 | | 0007 | 303-02-00100 | Removal of Existing Patches | 50 | SQYD | 51.00 | 2,550.00 | 15.00 | 750.00 | 100.00 | 5,000.00 | 45.00 | 2,250.00 | | 0008 | 303-03-00300 | In-Place Cement Treated Base Course (10" Thick) | 64,032 | SQYD | 11.00 | 704,352.00 | 11.50 | 736,368.00 | 10.00 | 640,320.00 | 13.00 | 832,416.00 | | 0009 | 304-01-00100 | Lime | 125.85 | TON | 410.00 | 51,598.50 | 550.00 | 69,217.50 | 350.00 | 44,047.50 | 375.00 | 47,193.75 | | 0010 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 15,987 | SQYD | 2.25 | 35,970.75 | 4.25 | 67,944.75 | 8.00 | 127,896.00 | 6.00 | 95,922.00 | | 0011 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 64,032 | SQYD | 11.00 | 704,352.00 | 10.25 | 656,328.00 | 12.00 | 768,384.00 | 17.00 | 1,088,544.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,279 | CUYD | 95.00 | 121,505.00 | 55.00 | 70,345.00 | 60.00 | 76,740.00 | 65.00 | 83,135.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 60.00 | 9,000.00 | 75.00 | 11,250.00 | 60.00 | 9,000.00 | 75.00 | 11,250.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 13,772.9 | TON | 135.00 | 1,859,341.50 | 120.00 | 1,652,748.00 | 145.00 | 1,997,070.50 | 135.00 | 1,859,341.50 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,235.5 | TON | 250.00 | 308,875.00 | 195.00 | 240,922.50 | 145.00 | 179,147.50 | 195.00 | 240,922.50 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 51,805 | SQYD | 2.25 | 116,561.25 | 2.85 | 147,644.25 | 3.00 | 155,415.00 | 2.50 | 129,512.50 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,879 | CUYD | 1.00 | -2,879.00 | 0.01 | -28.79 | 1.00 | -2,879.00 | 0.01 | -28.79 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 492 | SQYD | 128.00 | 62,976.00 | 193.00 | 94,956.00 | 200.00 | 98,400.00 | 160.00 | 78,720.00 | | 0019 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 12 | LNFT | 375.00 | 4,500.00 | 375.00 | 4,500.00 | 900.00 | 10,800.00 | 500.00 | 6,000.00 | | 0020 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 4 | LNFT | 385.00 | 1,540.00 | 450.00 | 1,800.00 | 1,300.00 | 5,200.00 | 1,500.00 | 6,000.00 | | 0021 | 701-14-00100 | Cleaning Existing Pipes | 49 | LNFT | 45.00 | 2,205.00 | 75.00 | 3,675.00 | 70.00 | 3,430.00 | 50.00 | 2,450.00 | | 0022 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,200.00 | 6,600.00 | 2,750.00 | 8,250.00 | 4,500.00 | 13,500.00 | 3,000.00 | 9,000.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 77.8 | SQYD | 255.00 | 19,839.00 | 275.00 | 21,395.00 | 375.00 | 29,175.00 | 125.00 | 9,725.00 | | 0024 | 712-02-00100 | Sacked Concrete Revetment | 7 | SQYD | 395.00 | 2,765.00 | 750.00 | 5,250.00 | 5,000.00 | 35,000.00 | 750.00 | 5,250.00 | | 0025 | 712-04-00100 | Flexible Revetment | 10 | SQYD | 315.00 | 3,150.00 | 225.00 | 2,250.00 | 1,000.00 | 10,000.00 | 500.00 | 5,000.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 65,000.00 | 65,000.00 | 95,000.00 | 95,000.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.55 | 13.20 | 0.01 | 0.24 | 1.00 | 24.00 | 1.00 | 24.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.002 | MILE | 154.00 | 2,002.31 | 650.00 | 8,451.30 | 400.00 | 5,200.80 | 850.00 | 11,051.70 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.002 | MILE | 650.00 | 8,451.30 | 750.00 | 9,751.50 | 100.00 | 1,300.20 | 800.00 | 10,401.60 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36 | MILE | 800.00 | 28,800.00 | 900.00 | 32,400.00 | 100.00 | 3,600.00 | 950.00 | 34,200.00 | | 0031 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,500.00 | 5,500.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.72 | MILE | 1,200.00 | 10,464.00 | 1,200.00 | 10,464.00 | 1,200.00 | 10,464.00 | 1,200.00 | 10,464.00 | | 0033 | 726-01-00100 | Bedding Material (6" Thick) | 1.7 | CUYD | 900.00 | 1,530.00 | 200.00 | 340.00 | 135.00 | 229.50 | 250.00 | 425.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 275,000.00 | 275,000.00 | 440,000.00 | 440,000.00 | 490,000.00 | 490,000.00 | 400,000.00 | 400,000.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 65.00 | 1,430.00 | 75.00 | 1,650.00 | 80.00 | 1,760.00 | 80.00 | 1,760.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 135.00 | 1,080.00 | 110.00 | 880.00 | 95.00 | 760.00 | 115.00 | 920.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 671 | EACH | 5.00 | 3,355.00 | 6.00 | 4,026.00 | 3.25 | 2,180.75 | 6.00 | 4,026.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 15.00 | 180.00 | 17.00 | 204.00 | 12.00 | 144.00 | 18.00 | 216.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12 | MILE | 5,500.00 | 66,000.00 | 6,000.00 | 72,000.00 | 3,000.00 | 36,000.00 | 5,975.00 | 71,700.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.647 | MILE | 1,900.00 | 6,929.30 | 2,200.00 | 8,023.40 | 925.00 | 3,373.48 | 2,150.00 | 7,841.05 | | 0041 | 735-01-00100 | Mailboxes | 52 | EACH | 1.00 | 52.00 | 10.00 | 520.00 | 30.00 | 1,560.00 | 25.00 | 1,300.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 52 | EACH | 300.00 | 15,600.00 | 325.00 | 16,900.00 | 210.00 | 10,920.00 | 300.00 | 15,600.00 | | 0043 | 739-01-00100 | Hydro-Seeding | 2.11 | ACRE | 3,500.00 | 7,385.00 | 4,000.00 | 8,440.00 | 3,000.00 | 6,330.00 | 3,500.00 | 7,385.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 1,000.00 | 1,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,622,532.11 | | 4,623,775.65 | | 5,028,203.23 | | 5,301,487.81 |
|