Proposal:H.015276.6
Parish:Bossier
Routes:US 80
Description:US 80: FLAT RIVER - MERRYWOODS BLVD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, EXPANSION JOINT REHABILITATION, AND RELATED WORK.
Estimated Construction Cost:$8,131,844.85
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $8,412,775.31 |
| 2 | 67822 | Earnest Contracting LLC | $8,930,458.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement ASPHALT AT CROSSOVER | 93.1 | SQYD | 16.50 | 1,536.15 | 20.00 | 1,862.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 2,457 | LNFT | 13.00 | 31,941.00 | 12.00 | 29,484.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 18" X 80' CMP, 18" X 96' CMP and 18" X 56' CMP | 222 | LNFT | 44.00 | 9,768.00 | 25.00 | 5,550.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 438.7 | SQYD | 27.50 | 12,064.25 | 15.00 | 6,580.50 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 161.5 | CUYD | 55.00 | 8,882.50 | 40.00 | 6,460.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 400 | LNFT | 22.00 | 8,800.00 | 50.00 | 20,000.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 28,152.9 | TON | 150.00 | 4,222,935.00 | 165.00 | 4,645,228.50 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,059.7 | TON | 275.00 | 566,417.50 | 175.00 | 360,447.50 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 180,613 | SQYD | 5.00 | 903,065.00 | 8.00 | 1,444,904.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10,747 | CUYD | 0.01 | -107.47 | 0.10 | -1,074.70 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,035 | SQYD | 215.00 | 222,525.00 | 175.00 | 181,125.00 | | 0012 | 510-03-00100 | Pavement Joint Repair | 155.8 | TON | 675.00 | 105,165.00 | 350.00 | 54,530.00 | | 0013 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 530.9 | SQYD | 132.00 | 70,078.80 | 200.00 | 106,180.00 | | 0014 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 870 | LNFT | 8.25 | 7,177.50 | 5.00 | 4,350.00 | | 0015 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 6,040 | LNFT | 8.25 | 49,830.00 | 5.00 | 30,200.00 | | 0016 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 232 | LNFT | 137.50 | 31,900.00 | 150.00 | 34,800.00 | | 0017 | 701-08-00100 | Relaying Pipe 18" X 16' RCP, 24" X 8' RCP | 24 | LNFT | 192.50 | 4,620.00 | 100.00 | 2,400.00 | | 0018 | 701-14-00100 | Cleaning Existing Pipes | 91 | LNFT | 44.00 | 4,004.00 | 150.00 | 13,650.00 | | 0019 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,750.00 | 8,250.00 | 750.00 | 2,250.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,700.6 | LNFT | 42.00 | 71,425.20 | 38.00 | 64,622.80 | | 0021 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 45.2 | LNFT | 185.00 | 8,362.00 | 168.00 | 7,593.60 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 137.50 | 20,625.00 | 125.00 | 18,750.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 14 | EACH | 4,300.00 | 60,200.00 | 3,900.00 | 54,600.00 | | 0024 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 4 | SQYD | 275.00 | 1,100.00 | 200.00 | 800.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 324,800.00 | 324,800.00 | 150,000.00 | 150,000.00 | | 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 657 | LNFT | 1.10 | 722.70 | 1.00 | 657.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.165 | MILE | 900.00 | 12,748.50 | 500.00 | 7,082.50 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 28.328 | MILE | 275.00 | 7,790.20 | 250.00 | 7,082.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 60.813 | MILE | 275.00 | 16,723.58 | 2,500.00 | 152,032.50 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.248 | MILE | 1,650.00 | 11,959.20 | 1,500.00 | 10,872.00 | | 0031 | 726-01-00100 | Bedding Material | 21.5 | CUYD | 220.00 | 4,730.00 | 200.00 | 4,300.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 324,800.00 | 324,800.00 | 100,000.00 | 100,000.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 9 | EACH | 88.00 | 792.00 | 80.00 | 720.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 137.50 | 2,200.00 | 125.00 | 2,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,189 | EACH | 7.70 | 9,155.30 | 7.00 | 8,323.00 | | 0036 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 5,011 | LNFT | 4.40 | 22,048.40 | 4.00 | 20,044.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 219 | LNFT | 33.00 | 7,227.00 | 30.00 | 6,570.00 | | 0038 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 3,324 | LNFT | 3.30 | 10,969.20 | 3.00 | 9,972.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.271 | MILE | 7,700.00 | 156,086.70 | 7,000.00 | 141,897.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.006 | MILE | 3,300.00 | 29,719.80 | 3,000.00 | 27,018.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 52,000.00 | 5,928.00 | 45,000.00 | 5,130.00 | | 0042 | 735-01-00100 | Mailboxes | 47 | EACH | 1.10 | 51.70 | 1.00 | 47.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 346.50 | 7,276.50 | 315.00 | 6,615.00 | | 0044 | 735-03-00100 | Mailbox Supports (Double) | 13 | EACH | 495.00 | 6,435.00 | 450.00 | 5,850.00 | | 0045 | 736-01-00100 | Trenching and Backfilling | 80 | LNFT | 104.50 | 8,360.00 | 75.00 | 6,000.00 | | 0046 | 736-09-00100 | Loop Detector | 1,966 | LNFT | 98.00 | 192,668.00 | 95.00 | 186,770.00 | | 0047 | 736-10-00200 | Underground Junction Box (Type E) | 8 | EACH | 1,650.00 | 13,200.00 | 1,500.00 | 12,000.00 | | 0048 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 80 | LNFT | 55.00 | 4,400.00 | 50.00 | 4,000.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0050 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 94,220 | LNFT | 1.54 | 145,098.80 | 2.50 | 235,550.00 | | 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 60,960 | LNFT | 1.54 | 93,878.40 | 2.50 | 152,400.00 | | 0052 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 155,180 | LNFT | 0.83 | 128,799.40 | 1.35 | 209,493.00 | | 0053 | NS-602-00011 | Expansion Joint Rehabilitation | 750 | LNFT | 260.00 | 195,000.00 | 100.00 | 75,000.00 | | 0054 | 204-06-00100 | Temporary Silt Fencing | 3,570 | LNFT | 3.85 | 13,744.50 | 2.00 | 7,140.00 | | 0055 | 716-01-00100 | Mulch (Vegetative) | 86 | TON | 715.00 | 61,490.00 | 1,000.00 | 86,000.00 | | 0056 | 717-01-00100 | Seeding | 2,580 | LB | 17.60 | 45,408.00 | 20.00 | 51,600.00 | | 0057 | 718-01-00100 | Fertilizer | 43,000 | LB | 1.00 | 43,000.00 | 1.00 | 43,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,412,775.31 | | 8,930,458.20 |
|