Proposal:H.014238.6
Parish:Lincoln
Routes:LA 818
Description:LA 818: BARNET SPRINGS & CREEK BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$4,962,746.02
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,094,022.41 |
| 2 | 55950 | Brown Industrial Construction, LLC | $4,261,515.35 |
| 3 | 49239 | WL Bass Construction Inc. | $4,485,788.18 |
| 4 | 56994 | Matt L. Guinn Construction, LLC | $4,545,053.15 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $4,715,064.20 |
| 6 | 14788 | Louisiana Bridge, Inc. | $5,029,826.80 |
| 7 | 00044 | Guinn Construction, LLC | $5,892,582.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Brown Industrial Construction, LLC | - 3 - WL Bass Construction Inc. | - 4 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 75,000.00 | 75,000.00 | 585,000.00 | 585,000.00 | 250,000.00 | 250,000.00 | 125,000.00 | 125,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,000.00 | 11,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 18,000.00 | 18,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 72 | SQYD | 80.00 | 5,760.00 | 9.00 | 648.00 | 6.00 | 432.00 | 20.00 | 1,440.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 4,363.6 | SQYD | 1.55 | 6,763.58 | 9.00 | 39,272.40 | 3.00 | 13,090.80 | 9.00 | 39,272.40 | | 0005 | 202-02-04501 | Removal of Bridge STA. 106+74.56; 32' X 76' COPCSS | 2,432 | LUMP | 60,000.00 | 60,000.00 | 72,000.00 | 72,000.00 | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | | 0006 | 202-02-04501 | Removal of Bridge STA. 218+01.87; 25' X 59' COPCSS | 1,475 | LUMP | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 614 | LNFT | 7.00 | 4,298.00 | 6.00 | 3,684.00 | 1.00 | 614.00 | 12.00 | 7,368.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 839.2 | LNFT | 16.00 | 13,427.20 | 6.00 | 5,035.20 | 8.00 | 6,713.60 | 8.00 | 6,713.60 | | 0009 | 203-02-00100 | Drainage Excavation | 1,276 | CUYD | 25.00 | 31,900.00 | 25.00 | 31,900.00 | 14.00 | 17,864.00 | 18.00 | 22,968.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 71,000.00 | 71,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 155.00 | 1,240.00 | 155.00 | 1,240.00 | 155.00 | 1,240.00 | 200.00 | 1,600.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 2,850 | LNFT | 2.15 | 6,127.50 | 2.20 | 6,270.00 | 3.00 | 8,550.00 | 3.50 | 9,975.00 | | 0013 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 5,458.9 | SQYD | 40.00 | 218,356.00 | 55.00 | 300,239.50 | 75.00 | 409,417.50 | 82.50 | 450,359.25 | | 0014 | 302-03-00100 | Base Drain Outlet | 10 | EACH | 800.00 | 8,000.00 | 550.00 | 5,500.00 | 2,500.00 | 25,000.00 | 1,000.00 | 10,000.00 | | 0015 | 304-01-00100 | Lime | 38.72 | TON | 490.00 | 18,972.80 | 300.00 | 11,616.00 | 500.00 | 19,360.00 | 600.00 | 23,232.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 2,732 | SQYD | 2.25 | 6,147.00 | 5.00 | 13,660.00 | 7.04 | 19,233.28 | 12.00 | 32,784.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7.6 | CUYD | 225.00 | 1,710.00 | 500.00 | 3,800.00 | 120.00 | 912.00 | 200.00 | 1,520.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 15.2 | CUYD | 126.00 | 1,915.20 | 300.00 | 4,560.00 | 150.00 | 2,280.00 | 200.00 | 3,040.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 968.2 | TON | 195.00 | 188,799.00 | 270.00 | 261,414.00 | 270.00 | 261,414.00 | 285.00 | 275,937.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 243.7 | TON | 255.00 | 62,143.50 | 330.00 | 80,421.00 | 330.00 | 80,421.00 | 340.00 | 82,858.00 | | 0021 | 510-01-00001 | Pavement Patching (14.5 inch Minimum Thickness) | 164 | SQYD | 215.00 | 35,260.00 | 235.00 | 38,540.00 | 300.00 | 49,200.00 | 300.00 | 49,200.00 | | 0022 | 701-05-02065 | Side Drain Pipe (Erosion) (24" RPVCP) | 46 | LNFT | 215.00 | 9,890.00 | 135.00 | 6,210.00 | 150.00 | 6,900.00 | 150.00 | 6,900.00 | | 0023 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 260 | LNFT | 165.00 | 42,900.00 | 190.00 | 49,400.00 | 160.00 | 41,600.00 | 150.00 | 39,000.00 | | 0024 | 702-08-00100 | Side Drain Safety End (Type 1) | 7 | EACH | 4,100.00 | 28,700.00 | 2,500.00 | 17,500.00 | 2,500.00 | 17,500.00 | 4,100.00 | 28,700.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 331.5 | LNFT | 34.00 | 11,271.00 | 34.00 | 11,271.00 | 34.00 | 11,271.00 | 35.00 | 11,602.50 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 135.00 | 27,000.00 | 135.00 | 27,000.00 | 135.00 | 27,000.00 | | 0027 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 4,150.00 | 33,200.00 | 4,150.00 | 33,200.00 | 4,150.00 | 33,200.00 | 4,850.00 | 38,800.00 | | 0028 | 705-01-00100 | Barbed Wire Fence | 612 | LNFT | 13.00 | 7,956.00 | 12.50 | 7,650.00 | 12.50 | 7,650.00 | 20.00 | 12,240.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 17 | EACH | 600.00 | 10,200.00 | 600.00 | 10,200.00 | 500.00 | 8,500.00 | 750.00 | 12,750.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 17 | EACH | 200.00 | 3,400.00 | 200.00 | 3,400.00 | 100.00 | 1,700.00 | 250.00 | 4,250.00 | | 0031 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 53 | SQYD | 250.00 | 13,250.00 | 95.00 | 5,035.00 | 110.00 | 5,830.00 | 100.00 | 5,300.00 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,648 | SQYD | 100.00 | 164,800.00 | 95.00 | 156,560.00 | 122.00 | 201,056.00 | 100.00 | 164,800.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 1,701 | SQYD | 1.00 | 1,701.00 | 3.00 | 5,103.00 | 3.00 | 5,103.00 | 5.00 | 8,505.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 246,000.00 | 246,000.00 | 65,000.00 | 65,000.00 | 198,000.00 | 198,000.00 | 120,000.00 | 120,000.00 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 3.8 | TON | 14.00 | 53.20 | 850.00 | 3,230.00 | 850.00 | 3,230.00 | 800.00 | 3,040.00 | | 0036 | 717-01-00100 | Seeding | 75 | LB | 55.00 | 4,125.00 | 55.00 | 4,125.00 | 55.00 | 4,125.00 | 20.00 | 1,500.00 | | 0037 | 718-01-00100 | Fertilizer | 2,494 | LB | 1.00 | 2,494.00 | 0.75 | 1,870.50 | 0.75 | 1,870.50 | 1.00 | 2,494.00 | | 0038 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 930 | SQYD | 3.00 | 2,790.00 | 3.00 | 2,790.00 | 4.00 | 3,720.00 | 3.25 | 3,022.50 | | 0039 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 213 | SQYD | 4.00 | 852.00 | 4.00 | 852.00 | 4.00 | 852.00 | 3.25 | 692.25 | | 0040 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 253 | SQYD | 5.00 | 1,265.00 | 5.00 | 1,265.00 | 6.00 | 1,518.00 | 3.25 | 822.25 | | 0041 | 720-01-02060 | Erosion Control System, Flexible (Channel Liner) (Type F) | 113 | SQYD | 6.00 | 678.00 | 6.00 | 678.00 | 6.00 | 678.00 | 25.00 | 2,825.00 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 2 | EACH | 4,500.00 | 9,000.00 | 1.00 | 2.00 | 9,000.00 | 18,000.00 | 10,000.00 | 20,000.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.49 | MILE | 1,000.00 | 490.00 | 600.00 | 294.00 | 1,500.00 | 735.00 | 10,000.00 | 4,900.00 | | 0044 | 726-01-00100 | Bedding Material | 30 | CUYD | 190.00 | 5,700.00 | 50.00 | 1,500.00 | 220.00 | 6,600.00 | 200.00 | 6,000.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 415,000.00 | 415,000.00 | 420,000.00 | 420,000.00 | 448,500.00 | 448,500.00 | 420,000.00 | 420,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24.3 | SQFT | 60.00 | 1,458.00 | 55.00 | 1,336.50 | 55.00 | 1,336.50 | 50.00 | 1,215.00 | | 0047 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 125.00 | 1,000.00 | 125.00 | 1,000.00 | 150.00 | 1,200.00 | | 0048 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 | 150.00 | 600.00 | 300.00 | 1,200.00 | | 0049 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 910 | EACH | 12.00 | 10,920.00 | 9.00 | 8,190.00 | 9.00 | 8,190.00 | 10.00 | 9,100.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 80 | EACH | 6.00 | 480.00 | 6.00 | 480.00 | 6.00 | 480.00 | 15.00 | 1,200.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.206 | MILE | 6,100.00 | 7,356.60 | 4,975.00 | 5,999.85 | 5,000.00 | 6,030.00 | 12,000.00 | 14,472.00 | | 0052 | 735-01-00100 | Mailboxes | 4 | EACH | 35.00 | 140.00 | 35.00 | 140.00 | 35.00 | 140.00 | 150.00 | 600.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 100.00 | 400.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 76,500.00 | 76,500.00 | 44,000.00 | 44,000.00 | 89,940.00 | 89,940.00 | 65,000.00 | 65,000.00 | | 0055 | 804-01-00400 | Precast Concrete Piles (18") | 3,180 | LNFT | 180.00 | 572,400.00 | 150.00 | 477,000.00 | 220.00 | 699,600.00 | 170.00 | 540,600.00 | | 0056 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 18,000.00 | 18,000.00 | 17,500.00 | 17,500.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | | 0057 | 804-18-00100 | Vibration Monitoring | 22 | DAY | 900.00 | 19,800.00 | 800.00 | 17,600.00 | 250.00 | 5,500.00 | 1,100.00 | 24,200.00 | | 0058 | 805-01-00100 | Class A1 Concrete (Slab Span) | 288.16 | CUYD | 1,900.00 | 547,504.00 | 1,250.00 | 360,200.00 | 350.00 | 100,856.00 | 2,000.00 | 576,320.00 | | 0059 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 93.19 | CUYD | 3,600.00 | 335,484.00 | 2,400.00 | 223,656.00 | 350.00 | 32,616.50 | 3,100.00 | 288,889.00 | | 0060 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,497 | SQFT | 4.00 | 9,988.00 | 2.00 | 4,994.00 | 1.00 | 2,497.00 | 1.50 | 3,745.50 | | 0061 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,497 | SQFT | 4.00 | 9,988.00 | 3.00 | 7,491.00 | 2.00 | 4,994.00 | 1.50 | 3,745.50 | | 0062 | 806-01-00100 | Deformed Reinforcing Steel | 72,469 | LB | 1.55 | 112,326.95 | 1.60 | 115,950.40 | 4.50 | 326,110.50 | 1.60 | 115,950.40 | | 0063 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 215.00 | 77,400.00 | 350.00 | 126,000.00 | 225.00 | 81,000.00 | 240.00 | 86,400.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 115.00 | 294,400.00 | 120.00 | 307,200.00 | 230.00 | 588,800.00 | 145.00 | 371,200.00 | | 0065 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 230 | SFIN | 230.00 | 52,900.00 | 300.00 | 69,000.00 | 175.00 | 40,250.00 | 120.00 | 27,600.00 | | 0066 | 815-03-00300 | Joint Seal (Poured) | 364 | LNFT | 14.00 | 5,096.00 | 24.00 | 8,736.00 | 24.00 | 8,736.00 | 25.00 | 9,100.00 | | 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 384 | LNFT | 8.78 | 3,371.52 | 11.00 | 4,224.00 | 10.00 | 3,840.00 | 15.00 | 5,760.00 | | 0068 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 512 | LNFT | 8.78 | 4,495.36 | 2.00 | 1,024.00 | 1.00 | 512.00 | 5.00 | 2,560.00 | | 0069 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 879 | INLF | 1.00 | 879.00 | 2.00 | 1,758.00 | 1.00 | 879.00 | 15.00 | 13,185.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,094,022.41 | | 4,261,515.35 | | 4,485,788.18 | | 4,545,053.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Louisiana Bridge, Inc. | - 7 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 610,000.00 | 610,000.00 | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 72 | SQYD | 10.00 | 720.00 | 50.00 | 3,600.00 | 50.00 | 3,600.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 4,363.6 | SQYD | 15.00 | 65,454.00 | 12.00 | 52,363.20 | 20.00 | 87,272.00 | | 0005 | 202-02-04501 | Removal of Bridge STA. 106+74.56; 32' X 76' COPCSS | 2,432 | LUMP | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | | 0006 | 202-02-04501 | Removal of Bridge STA. 218+01.87; 25' X 59' COPCSS | 1,475 | LUMP | 35,000.00 | 35,000.00 | 65,000.00 | 65,000.00 | 38,000.00 | 38,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 614 | LNFT | 5.00 | 3,070.00 | 8.00 | 4,912.00 | 10.00 | 6,140.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 839.2 | LNFT | 12.00 | 10,070.40 | 24.00 | 20,140.80 | 20.00 | 16,784.00 | | 0009 | 203-02-00100 | Drainage Excavation | 1,276 | CUYD | 33.00 | 42,108.00 | 27.00 | 34,452.00 | 25.00 | 31,900.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 140,000.00 | 140,000.00 | 98,000.00 | 98,000.00 | 152,000.00 | 152,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 155.00 | 1,240.00 | 200.00 | 1,600.00 | 500.00 | 4,000.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 2,850 | LNFT | 6.90 | 19,665.00 | 4.25 | 12,112.50 | 5.00 | 14,250.00 | | 0013 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 5,458.9 | SQYD | 55.00 | 300,239.50 | 65.00 | 354,828.50 | 80.00 | 436,712.00 | | 0014 | 302-03-00100 | Base Drain Outlet | 10 | EACH | 2,350.00 | 23,500.00 | 1,100.00 | 11,000.00 | 1,500.00 | 15,000.00 | | 0015 | 304-01-00100 | Lime | 38.72 | TON | 390.00 | 15,100.80 | 480.00 | 18,585.60 | 750.00 | 29,040.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 2,732 | SQYD | 8.00 | 21,856.00 | 8.00 | 21,856.00 | 25.00 | 68,300.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7.6 | CUYD | 200.00 | 1,520.00 | 800.00 | 6,080.00 | 100.00 | 760.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 15.2 | CUYD | 100.00 | 1,520.00 | 300.00 | 4,560.00 | 150.00 | 2,280.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 968.2 | TON | 270.00 | 261,414.00 | 180.00 | 174,276.00 | 325.00 | 314,665.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 243.7 | TON | 330.00 | 80,421.00 | 250.00 | 60,925.00 | 415.00 | 101,135.50 | | 0021 | 510-01-00001 | Pavement Patching (14.5 inch Minimum Thickness) | 164 | SQYD | 235.00 | 38,540.00 | 350.00 | 57,400.00 | 325.00 | 53,300.00 | | 0022 | 701-05-02065 | Side Drain Pipe (Erosion) (24" RPVCP) | 46 | LNFT | 140.00 | 6,440.00 | 270.00 | 12,420.00 | 225.00 | 10,350.00 | | 0023 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 260 | LNFT | 190.00 | 49,400.00 | 155.00 | 40,300.00 | 195.00 | 50,700.00 | | 0024 | 702-08-00100 | Side Drain Safety End (Type 1) | 7 | EACH | 2,500.00 | 17,500.00 | 3,100.00 | 21,700.00 | 3,500.00 | 24,500.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 331.5 | LNFT | 34.00 | 11,271.00 | 34.00 | 11,271.00 | 40.00 | 13,260.00 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 135.00 | 27,000.00 | 155.00 | 31,000.00 | | 0027 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 4,150.00 | 33,200.00 | 4,150.00 | 33,200.00 | 5,250.00 | 42,000.00 | | 0028 | 705-01-00100 | Barbed Wire Fence | 612 | LNFT | 12.50 | 7,650.00 | 12.00 | 7,344.00 | 25.00 | 15,300.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 17 | EACH | 600.00 | 10,200.00 | 600.00 | 10,200.00 | 800.00 | 13,600.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 17 | EACH | 200.00 | 3,400.00 | 600.00 | 10,200.00 | 400.00 | 6,800.00 | | 0031 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 53 | SQYD | 100.00 | 5,300.00 | 200.00 | 10,600.00 | 100.00 | 5,300.00 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,648 | SQYD | 110.00 | 181,280.00 | 105.00 | 173,040.00 | 150.00 | 247,200.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 1,701 | SQYD | 3.00 | 5,103.00 | 6.00 | 10,206.00 | 5.00 | 8,505.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 86,000.00 | 86,000.00 | 65,000.00 | 65,000.00 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 3.8 | TON | 850.00 | 3,230.00 | 1,100.00 | 4,180.00 | 2,500.00 | 9,500.00 | | 0036 | 717-01-00100 | Seeding | 75 | LB | 55.00 | 4,125.00 | 25.00 | 1,875.00 | 50.00 | 3,750.00 | | 0037 | 718-01-00100 | Fertilizer | 2,494 | LB | 0.75 | 1,870.50 | 1.50 | 3,741.00 | 1.00 | 2,494.00 | | 0038 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 930 | SQYD | 3.00 | 2,790.00 | 3.25 | 3,022.50 | 10.00 | 9,300.00 | | 0039 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 213 | SQYD | 4.00 | 852.00 | 5.00 | 1,065.00 | 15.00 | 3,195.00 | | 0040 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 253 | SQYD | 5.00 | 1,265.00 | 5.00 | 1,265.00 | 15.00 | 3,795.00 | | 0041 | 720-01-02060 | Erosion Control System, Flexible (Channel Liner) (Type F) | 113 | SQYD | 6.00 | 678.00 | 5.00 | 565.00 | 20.00 | 2,260.00 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 2 | EACH | 10,000.00 | 20,000.00 | 21,000.00 | 42,000.00 | 40,000.00 | 80,000.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.49 | MILE | 500.00 | 245.00 | 1,000.00 | 490.00 | 10,000.00 | 4,900.00 | | 0044 | 726-01-00100 | Bedding Material | 30 | CUYD | 80.00 | 2,400.00 | 225.00 | 6,750.00 | 250.00 | 7,500.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 470,000.00 | 470,000.00 | 655,500.00 | 655,500.00 | 585,000.00 | 585,000.00 | | 0046 | 729-01-00100 | Sign (Type A) | 24.3 | SQFT | 30.00 | 729.00 | 55.00 | 1,336.50 | 100.00 | 2,430.00 | | 0047 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 125.00 | 1,000.00 | 175.00 | 1,400.00 | | 0048 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 250.00 | 1,000.00 | 150.00 | 600.00 | 250.00 | 1,000.00 | | 0049 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 910 | EACH | 12.00 | 10,920.00 | 12.00 | 10,920.00 | 20.00 | 18,200.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 80 | EACH | 6.00 | 480.00 | 6.00 | 480.00 | 10.00 | 800.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.206 | MILE | 6,000.00 | 7,236.00 | 6,000.00 | 7,236.00 | 25,000.00 | 30,150.00 | | 0052 | 735-01-00100 | Mailboxes | 4 | EACH | 35.00 | 140.00 | 450.00 | 1,800.00 | 250.00 | 1,000.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 250.00 | 1,000.00 | 450.00 | 1,800.00 | 250.00 | 1,000.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | 80,000.00 | 80,000.00 | | 0055 | 804-01-00400 | Precast Concrete Piles (18") | 3,180 | LNFT | 190.00 | 604,200.00 | 230.00 | 731,400.00 | 225.00 | 715,500.00 | | 0056 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 17,500.00 | 17,500.00 | 15,000.00 | 15,000.00 | 22,500.00 | 22,500.00 | | 0057 | 804-18-00100 | Vibration Monitoring | 22 | DAY | 800.00 | 17,600.00 | 750.00 | 16,500.00 | 1,500.00 | 33,000.00 | | 0058 | 805-01-00100 | Class A1 Concrete (Slab Span) | 288.16 | CUYD | 1,500.00 | 432,240.00 | 2,800.00 | 806,848.00 | 3,250.00 | 936,520.00 | | 0059 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 93.19 | CUYD | 2,500.00 | 232,975.00 | 3,800.00 | 354,122.00 | 4,500.00 | 419,355.00 | | 0060 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,497 | SQFT | 1.50 | 3,745.50 | 5.00 | 12,485.00 | 4.00 | 9,988.00 | | 0061 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,497 | SQFT | 2.00 | 4,994.00 | 4.00 | 9,988.00 | 4.00 | 9,988.00 | | 0062 | 806-01-00100 | Deformed Reinforcing Steel | 72,469 | LB | 1.50 | 108,703.50 | 1.80 | 130,444.20 | 1.75 | 126,820.75 | | 0063 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 290.00 | 104,400.00 | 170.00 | 61,200.00 | 450.00 | 162,000.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 133.00 | 340,480.00 | 130.00 | 332,800.00 | 150.00 | 384,000.00 | | 0065 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 230 | SFIN | 150.00 | 34,500.00 | 270.00 | 62,100.00 | 350.00 | 80,500.00 | | 0066 | 815-03-00300 | Joint Seal (Poured) | 364 | LNFT | 24.00 | 8,736.00 | 28.00 | 10,192.00 | 42.00 | 15,288.00 | | 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 384 | LNFT | 9.00 | 3,456.00 | 20.00 | 7,680.00 | 10.00 | 3,840.00 | | 0068 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 512 | LNFT | 1.00 | 512.00 | 11.00 | 5,632.00 | 5.00 | 2,560.00 | | 0069 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 879 | INLF | 1.00 | 879.00 | 3.00 | 2,637.00 | 5.00 | 4,395.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,715,064.20 | | 5,029,826.80 | | 5,892,582.25 |
|