Proposal:H.012885.6-R1
Parish:Jefferson
Routes:LA 466
Description:LA 466: 5TH STREET IMPROVEMENTS (GRETNA)
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, CONCRETE WALKS AND DRIVES, TEMPORARY SHEETING, WATER SUPPLY SYSTEM, SANITARY SEWER REHAB, LANDSCAPING, AND RELATED WORK.
Estimated Construction Cost:$9,693,397.97
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | La Contracting Enterprise LLC | $7,828,000.00 |
| 2 | 48896 | Command Construction Industries LLC | $8,543,637.50 |
| 3 | 06276 | Barriere Construction Co., LLC | $8,847,860.00 |
| 4 | 44187 | RNGD Infrastructure LLC | $8,930,471.58 |
| 5 | 24901 | Hard Rock Construction LLC | $10,096,801.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - La Contracting Enterprise LLC | - 2 - Command Construction Industries LLC | - 3 - Barriere Construction Co., LLC | - 4 - RNGD Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Existing Waterline (12" Asbestos Concrete) | 260 | LNFT | 61.00 | 15,860.00 | 20.00 | 5,200.00 | 40.00 | 10,400.00 | 45.00 | 11,700.00 | | 0002 | 202-02-00030 | Removal of Existing Waterline (8" Asbestos Concrete) | 200 | LNFT | 61.00 | 12,200.00 | 20.00 | 4,000.00 | 40.00 | 8,000.00 | 48.00 | 9,600.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 10,752.1 | SQYD | 19.00 | 204,289.90 | 20.00 | 215,042.00 | 10.00 | 107,521.00 | 13.50 | 145,153.35 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 78 | EACH | 816.00 | 63,648.00 | 500.00 | 39,000.00 | 300.00 | 23,400.00 | 550.00 | 42,900.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 448.3 | LNFT | 14.00 | 6,276.20 | 10.00 | 4,483.00 | 12.00 | 5,379.60 | 2.25 | 1,008.68 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 5,238 | SQYD | 19.00 | 99,522.00 | 20.00 | 104,760.00 | 15.00 | 78,570.00 | 25.50 | 133,569.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" RCP | 186 | LNFT | 32.00 | 5,952.00 | 20.00 | 3,720.00 | 17.00 | 3,162.00 | 20.00 | 3,720.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 1,614 | LNFT | 17.00 | 27,438.00 | 20.00 | 32,280.00 | 17.00 | 27,438.00 | 21.00 | 33,894.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 21" RCP | 494 | LNFT | 18.00 | 8,892.00 | 20.00 | 9,880.00 | 17.00 | 8,398.00 | 18.50 | 9,139.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 512 | LNFT | 23.00 | 11,776.00 | 20.00 | 10,240.00 | 17.00 | 8,704.00 | 14.00 | 7,168.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" RCP | 271 | LNFT | 22.00 | 5,962.00 | 20.00 | 5,420.00 | 17.00 | 4,607.00 | 18.50 | 5,013.50 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 36" RCP | 493 | LNFT | 30.00 | 14,790.00 | 30.00 | 14,790.00 | 17.00 | 8,381.00 | 14.00 | 6,902.00 | | 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) 42" RCP | 275 | LNFT | 32.00 | 8,800.00 | 30.00 | 8,250.00 | 17.00 | 4,675.00 | 11.50 | 3,162.50 | | 0014 | 202-02-32140 | Removal of Pipe (Storm Drain) 48" RCP | 30 | LNFT | 42.00 | 1,260.00 | 30.00 | 900.00 | 17.00 | 510.00 | 11.50 | 345.00 | | 0015 | 203-04-00200 | Nonplastic Embankment (Sand) 18" Thick | 4,713 | CUYD | 41.00 | 193,233.00 | 30.00 | 141,390.00 | 35.00 | 164,955.00 | 33.00 | 155,529.00 | | 0016 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 254,454.55 | 254,454.55 | 350,000.00 | 350,000.00 | 250,000.00 | 250,000.00 | 350,000.00 | 350,000.00 | | 0017 | 203-08-00100 | Geotextile Fabric | 12,295 | SQYD | 2.00 | 24,590.00 | 3.00 | 36,885.00 | 2.00 | 24,590.00 | 1.00 | 12,295.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 495 | EACH | 29.00 | 14,355.00 | 1.00 | 495.00 | 20.00 | 9,900.00 | 10.00 | 4,950.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 2,475 | LNFT | 2.00 | 4,950.00 | 1.00 | 2,475.00 | 2.50 | 6,187.50 | 2.00 | 4,950.00 | | 0020 | 302-01-00700 | Class II Base Course (Crushed Stone or Recycled Portland Cement Concrete) | 3,599.4 | CUYD | 165.00 | 593,901.00 | 150.00 | 539,910.00 | 130.00 | 467,922.00 | 110.00 | 395,934.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 396.3 | CUYD | 158.00 | 62,615.40 | 80.00 | 31,704.00 | 125.00 | 49,537.50 | 80.00 | 31,704.00 | | 0022 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 28 | SQYD | 170.00 | 4,760.00 | 300.00 | 8,400.00 | 500.00 | 14,000.00 | 255.00 | 7,140.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 2,793.4 | TON | 165.00 | 460,911.00 | 175.00 | 488,845.00 | 175.00 | 488,845.00 | 220.00 | 614,548.00 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 1,483 | SQYD | 15.00 | 22,245.00 | 10.00 | 14,830.00 | 10.00 | 14,830.00 | 12.50 | 18,537.50 | | 0025 | 510-04-00100 | Pavement Patching | 149 | TON | 366.00 | 54,534.00 | 350.00 | 52,150.00 | 300.00 | 44,700.00 | 380.00 | 56,620.00 | | 0026 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 708.9 | SQYD | 155.00 | 109,879.50 | 135.00 | 95,701.50 | 150.00 | 106,335.00 | 125.00 | 88,612.50 | | 0027 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 475 | LNFT | 91.00 | 43,225.00 | 140.00 | 66,500.00 | 180.00 | 85,500.00 | 95.00 | 45,125.00 | | 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 509 | LNFT | 102.00 | 51,918.00 | 150.00 | 76,350.00 | 190.00 | 96,710.00 | 100.00 | 50,900.00 | | 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,257 | LNFT | 116.00 | 145,812.00 | 165.00 | 207,405.00 | 200.00 | 251,400.00 | 140.00 | 175,980.00 | | 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 715 | LNFT | 162.00 | 115,830.00 | 240.00 | 171,600.00 | 220.00 | 157,300.00 | 225.00 | 160,875.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 663 | LNFT | 192.00 | 127,296.00 | 300.00 | 198,900.00 | 275.00 | 182,325.00 | 240.00 | 159,120.00 | | 0032 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 557 | LNFT | 263.00 | 146,491.00 | 365.00 | 203,305.00 | 335.00 | 186,595.00 | 345.00 | 192,165.00 | | 0033 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 758 | LNFT | 328.00 | 248,624.00 | 465.00 | 352,470.00 | 380.00 | 288,040.00 | 380.00 | 288,040.00 | | 0034 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 55 | LNFT | 138.00 | 7,590.00 | 175.00 | 9,625.00 | 220.00 | 12,100.00 | 240.00 | 13,200.00 | | 0035 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 129 | LNFT | 164.00 | 21,156.00 | 310.00 | 39,990.00 | 240.00 | 30,960.00 | 280.00 | 36,120.00 | | 0036 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 21 | LNFT | 280.00 | 5,880.00 | 340.00 | 7,140.00 | 350.00 | 7,350.00 | 370.00 | 7,770.00 | | 0037 | 701-07-00300 | Yard Drain Pipe (8") | 750 | LNFT | 41.00 | 30,750.00 | 50.00 | 37,500.00 | 50.00 | 37,500.00 | 70.00 | 52,500.00 | | 0038 | 701-15-00100 | Concrete Collar | 22 | EACH | 1,100.00 | 24,200.00 | 1,000.00 | 22,000.00 | 500.00 | 11,000.00 | 1,250.00 | 27,500.00 | | 0039 | 702-02-00100 | Manholes (MH-06) | 24 | EACH | 6,400.00 | 153,600.00 | 11,000.00 | 264,000.00 | 9,000.00 | 216,000.00 | 8,000.00 | 192,000.00 | | 0040 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 5,800.00 | 46,400.00 | 6,000.00 | 48,000.00 | 5,000.00 | 40,000.00 | 7,500.00 | 60,000.00 | | 0041 | 702-03-00400 | Catch Basins (CB-05) | 42 | EACH | 1,500.00 | 63,000.00 | 1,000.00 | 42,000.00 | 1,500.00 | 63,000.00 | 2,250.00 | 94,500.00 | | 0042 | 702-03-00600 | Catch Basins (CB-07) | 26 | EACH | 8,600.00 | 223,600.00 | 15,000.00 | 390,000.00 | 11,000.00 | 286,000.00 | 8,100.00 | 210,600.00 | | 0043 | 702-03-00800 | Catch Basins (CB-09) | 11 | EACH | 8,000.00 | 88,000.00 | 13,000.00 | 143,000.00 | 11,000.00 | 121,000.00 | 7,500.00 | 82,500.00 | | 0044 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 | 3,000.00 | 12,000.00 | 700.00 | 2,800.00 | | 0045 | 703-01-00100 | Shoulder Underdrain Systems | 240 | LNFT | 73.00 | 17,520.00 | 40.00 | 9,600.00 | 45.00 | 10,800.00 | 41.00 | 9,840.00 | | 0046 | 703-03-00100 | Perforated Pipe Underdrains | 1,537 | LNFT | 75.00 | 115,275.00 | 30.00 | 46,110.00 | 23.00 | 35,351.00 | 44.00 | 67,628.00 | | 0047 | 703-04-00100 | Nonperforated Pipe Underdrains | 60 | LNFT | 73.00 | 4,380.00 | 25.00 | 1,500.00 | 23.00 | 1,380.00 | 32.00 | 1,920.00 | | 0048 | 706-01-00100 | Concrete Walk (4" Thick) | 3,306.2 | SQYD | 91.00 | 300,864.20 | 65.00 | 214,903.00 | 100.00 | 330,620.00 | 60.00 | 198,372.00 | | 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 1,924.3 | SQYD | 104.00 | 200,127.20 | 80.00 | 153,944.00 | 115.00 | 221,294.50 | 85.00 | 163,565.50 | | 0050 | 706-04-00110 | Curb Ramps Type 1 | 5.6 | SQYD | 250.00 | 1,400.00 | 225.00 | 1,260.00 | 245.00 | 1,372.00 | 325.00 | 1,820.00 | | 0051 | 706-04-00110 | Curb Ramps Type 2 | 196.6 | SQYD | 250.00 | 49,150.00 | 225.00 | 44,235.00 | 245.00 | 48,167.00 | 350.00 | 68,810.00 | | 0052 | 706-04-00110 | Curb Ramps Type 7 | 44.5 | SQYD | 250.00 | 11,125.00 | 225.00 | 10,012.50 | 245.00 | 10,902.50 | 315.00 | 14,017.50 | | 0053 | 707-01-00100 | Concrete Curb | 224.6 | LNFT | 30.00 | 6,738.00 | 20.00 | 4,492.00 | 25.00 | 5,615.00 | 44.00 | 9,882.40 | | 0054 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,638 | LNFT | 37.00 | 208,606.00 | 30.00 | 169,140.00 | 50.00 | 281,900.00 | 65.00 | 366,470.00 | | 0055 | 710-01-00100 | Flowable Fill | 84.8 | CUYD | 272.00 | 23,065.60 | 300.00 | 25,440.00 | 390.00 | 33,072.00 | 350.00 | 29,680.00 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 116,000.00 | 116,000.00 | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 70,000.00 | 70,000.00 | | 0057 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.249 | MILE | 8,500.00 | 19,116.50 | 10,000.00 | 22,490.00 | 1,400.00 | 3,148.60 | 1,500.00 | 3,373.50 | | 0058 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,256 | SQYD | 8.50 | 27,676.00 | 10.00 | 32,560.00 | 10.00 | 32,560.00 | 10.00 | 32,560.00 | | 0059 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) ILEX X ATTENUATA SAVANNAH - SAVANNAH HOLLY | 72 | EACH | 320.00 | 23,040.00 | 300.00 | 21,600.00 | 735.00 | 52,920.00 | 750.00 | 54,000.00 | | 0060 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) MAGNOLIA VIRGINIANA AUSTRALIS - SWEETBAY MAGNOLIA | 236 | EACH | 350.00 | 82,600.00 | 300.00 | 70,800.00 | 735.00 | 173,460.00 | 750.00 | 177,000.00 | | 0061 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) LIRIOPE MUSCARI 'BIG BLUE' BIG BLUE LILYTURF | 7,457 | EACH | 3.00 | 22,371.00 | 7.00 | 52,199.00 | 7.50 | 55,927.50 | 7.00 | 52,199.00 | | 0062 | 719-02-00100 | Top Dressing Mulch (3" Depth) | 980 | SQYD | 4.00 | 3,920.00 | 25.00 | 24,500.00 | 7.50 | 7,350.00 | 8.00 | 7,840.00 | | 0063 | 726-01-00100 | Bedding Material | 710.3 | CUYD | 152.00 | 107,965.60 | 100.00 | 71,030.00 | 85.00 | 60,375.50 | 47.00 | 33,384.10 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 425,000.00 | 425,000.00 | 800,000.00 | 800,000.00 | 760,000.00 | 760,000.00 | 910,000.00 | 910,000.00 | | 0065 | 731-02-00100 | Reflectorized Raised Pavement Markers | 61 | EACH | 7.00 | 427.00 | 10.00 | 610.00 | 4.00 | 244.00 | 4.00 | 244.00 | | 0066 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 760 | LNFT | 1.00 | 760.00 | 1.00 | 760.00 | 2.50 | 1,900.00 | 2.50 | 1,900.00 | | 0067 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 459 | LNFT | 3.00 | 1,377.00 | 3.00 | 1,377.00 | 7.00 | 3,213.00 | 7.50 | 3,442.50 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 703 | LNFT | 15.00 | 10,545.00 | 20.00 | 14,060.00 | 12.00 | 8,436.00 | 25.00 | 17,575.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.87 | MILE | 4,750.00 | 8,882.50 | 5,000.00 | 9,350.00 | 3,600.00 | 6,732.00 | 3,800.00 | 7,106.00 | | 0070 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.101 | MILE | 2,600.00 | 262.60 | 2,500.00 | 252.50 | 1,800.00 | 181.80 | 1,750.00 | 176.75 | | 0071 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 355.00 | 355.00 | 300.00 | 300.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 375.00 | 375.00 | 500.00 | 500.00 | 355.00 | 355.00 | 300.00 | 300.00 | | 0073 | 732-04-02010 | Plastic Pavement Legends and Symbols (Shared Lane) | 18 | EACH | 275.00 | 4,950.00 | 500.00 | 9,000.00 | 355.00 | 6,390.00 | 425.00 | 7,650.00 | | 0074 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 375.00 | 375.00 | 500.00 | 500.00 | 355.00 | 355.00 | 325.00 | 325.00 | | 0075 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 525.00 | 1,050.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | 1,100.00 | 2,200.00 | | 0076 | 739-01-00100 | Hydro-Seeding | 1.47 | ACRE | 3,000.00 | 4,410.00 | 4,000.00 | 5,880.00 | 14,000.00 | 20,580.00 | 13,500.00 | 19,845.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 48,000.00 | 48,000.00 | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0078 | 741-20-01100 | Water Main (8" PVC) | 354 | LNFT | 140.00 | 49,560.00 | 180.00 | 63,720.00 | 140.00 | 49,560.00 | 445.00 | 157,530.00 | | 0079 | 741-20-01130 | Water Main (12" PVC) | 2,759 | LNFT | 120.00 | 331,080.00 | 190.00 | 524,210.00 | 150.00 | 413,850.00 | 205.00 | 565,595.00 | | 0080 | 741-21-00400 | Gate Valve (8") | 7 | EACH | 3,800.00 | 26,600.00 | 3,000.00 | 21,000.00 | 4,000.00 | 28,000.00 | 4,500.00 | 31,500.00 | | 0081 | 741-21-00600 | Gate Valve (12") | 4 | EACH | 6,700.00 | 26,800.00 | 6,000.00 | 24,000.00 | 6,000.00 | 24,000.00 | 9,000.00 | 36,000.00 | | 0082 | 741-24-00100 | Fire Hydrant | 10 | EACH | 9,400.00 | 94,000.00 | 10,000.00 | 100,000.00 | 8,000.00 | 80,000.00 | 9,300.00 | 93,000.00 | | 0083 | 741-28-01080 | Service Connection (1 1/2" PVC) | 1,440 | LNFT | 56.00 | 80,640.00 | 50.00 | 72,000.00 | 55.00 | 79,200.00 | 110.00 | 158,400.00 | | 0084 | 741-35-00100 | Adjust Valve or Meter Box | 40 | EACH | 400.00 | 16,000.00 | 150.00 | 6,000.00 | 550.00 | 22,000.00 | 300.00 | 12,000.00 | | 0085 | 802-03-00500 | Temporary Sheeting Timber/Steel | 25,236 | SQFT | 11.00 | 277,596.00 | 2.00 | 50,472.00 | 11.00 | 277,596.00 | 4.00 | 100,944.00 | | 0086 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 7.2 | CUYD | 3,100.00 | 22,320.00 | 2,000.00 | 14,400.00 | 5,000.00 | 36,000.00 | 2,850.00 | 20,520.00 | | 0087 | 810-04-00100 | Hand Railing | 47 | LNFT | 235.00 | 11,045.00 | 300.00 | 14,100.00 | 450.00 | 21,150.00 | 325.00 | 15,275.00 | | 0088 | NS-300-00060 | Geogrid | 9,427 | SQYD | 2.00 | 18,854.00 | 3.00 | 28,281.00 | 2.00 | 18,854.00 | 1.25 | 11,783.75 | | 0089 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,700 | INLF | 1.00 | 2,700.00 | 2.00 | 5,400.00 | 1.00 | 2,700.00 | 1.00 | 2,700.00 | | 0090 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 21,000 | INLF | 1.25 | 26,250.00 | 2.00 | 42,000.00 | 1.00 | 21,000.00 | 1.00 | 21,000.00 | | 0091 | TS-702-37002 | Sanitary Sewer Conflict Box | 3 | EACH | 15,000.00 | 45,000.00 | 20,000.00 | 60,000.00 | 24,000.00 | 72,000.00 | 19,000.00 | 57,000.00 | | 0092 | TS-702-37004 | Adjusting Sewer Manhole | 10 | EACH | 900.00 | 9,000.00 | 350.00 | 3,500.00 | 1,800.00 | 18,000.00 | 625.00 | 6,250.00 | | 0093 | TS-715-00010 | Bioretention Soil | 265 | CUYD | 84.00 | 22,260.00 | 40.00 | 10,600.00 | 113.00 | 29,945.00 | 110.00 | 29,150.00 | | 0094 | TS-719-00020 | Pavers | 12,115 | SQFT | 16.00 | 193,840.00 | 35.00 | 424,025.00 | 34.00 | 411,910.00 | 30.00 | 363,450.00 | | 0095 | TS-719-00022 | Concrete Banding 6" X 1'-10.5" | 1,737 | LF | 40.00 | 69,480.00 | 40.00 | 69,480.00 | 60.00 | 104,220.00 | 25.00 | 43,425.00 | | 0096 | TS-719-00050 | Irrigation System | 1 | LUMP | 145,000.00 | 145,000.00 | 75,000.00 | 75,000.00 | 120,000.00 | 120,000.00 | 120,000.00 | 120,000.00 | | 0097 | TS-742-01023 | Cleaning 8 inch | 2,871 | LNFT | 5.50 | 15,790.50 | 4.00 | 11,484.00 | 5.00 | 14,355.00 | 4.50 | 12,919.50 | | 0098 | TS-742-01030 | Lateral Inspection/Cleaning | 37 | EACH | 694.00 | 25,678.00 | 1,000.00 | 37,000.00 | 1,000.00 | 37,000.00 | 1,000.00 | 37,000.00 | | 0099 | TS-742-01032 | Lateral Lining PVC 8 inch, cured in place | 37 | EACH | 4,800.00 | 177,600.00 | 2,500.00 | 92,500.00 | 5,000.00 | 185,000.00 | 4,900.00 | 181,300.00 | | 0100 | TS-742-01035 | CCTV 8 inch | 2,871 | LNFT | 4.25 | 12,201.75 | 5.00 | 14,355.00 | 5.00 | 14,355.00 | 4.50 | 12,919.50 | | 0101 | TS-742-10100 | Rehab Sewer Manhole | 18 | EACH | 3,500.00 | 63,000.00 | 3,000.00 | 54,000.00 | 3,000.00 | 54,000.00 | 3,500.00 | 63,000.00 | | 0102 | TS-742-20010 | Pipe Lining (Cured In-Place) 8 inch | 2,871 | LNFT | 104.00 | 298,584.00 | 70.00 | 200,970.00 | 80.00 | 229,680.00 | 82.00 | 235,422.00 | | 0103 | TS-742-37003 | Connection to Existing Manhole Tie-Ins | 12 | EACH | 3,000.00 | 36,000.00 | 500.00 | 6,000.00 | 900.00 | 10,800.00 | 750.00 | 9,000.00 | | 0104 | TS-742-37071 | Adjust Sewer House Connection | 15 | EACH | 1,200.00 | 18,000.00 | 500.00 | 7,500.00 | 2,000.00 | 30,000.00 | 3,400.00 | 51,000.00 | | 0105 | TS-742-80100 | Sewer Line Point Repair Up to twelve feet (8" 0' - 6.0' Deep) | 5 | EACH | 6,000.00 | 30,000.00 | 12,500.00 | 62,500.00 | 3,000.00 | 15,000.00 | 8,634.31 | 43,171.55 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,828,000.00 | | 8,543,637.50 | | 8,847,860.00 | | 8,930,471.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Hard Rock Construction LLC | | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Existing Waterline (12" Asbestos Concrete) | 260 | LNFT | 11.00 | 2,860.00 | | 0002 | 202-02-00030 | Removal of Existing Waterline (8" Asbestos Concrete) | 200 | LNFT | 15.00 | 3,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 10,752.1 | SQYD | 12.00 | 129,025.20 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 78 | EACH | 540.00 | 42,120.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 448.3 | LNFT | 10.00 | 4,483.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 5,238 | SQYD | 33.00 | 172,854.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" RCP | 186 | LNFT | 26.00 | 4,836.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 1,614 | LNFT | 27.00 | 43,578.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 21" RCP | 494 | LNFT | 30.00 | 14,820.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 512 | LNFT | 30.00 | 15,360.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" RCP | 271 | LNFT | 60.00 | 16,260.00 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 36" RCP | 493 | LNFT | 46.00 | 22,678.00 | | 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) 42" RCP | 275 | LNFT | 72.00 | 19,800.00 | | 0014 | 202-02-32140 | Removal of Pipe (Storm Drain) 48" RCP | 30 | LNFT | 97.00 | 2,910.00 | | 0015 | 203-04-00200 | Nonplastic Embankment (Sand) 18" Thick | 4,713 | CUYD | 50.00 | 235,650.00 | | 0016 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 365,800.00 | 365,800.00 | | 0017 | 203-08-00100 | Geotextile Fabric | 12,295 | SQYD | 2.00 | 24,590.00 | | 0018 | 204-02-00100 | Temporary Hay Bales | 495 | EACH | 21.00 | 10,395.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 2,475 | LNFT | 3.75 | 9,281.25 | | 0020 | 302-01-00700 | Class II Base Course (Crushed Stone or Recycled Portland Cement Concrete) | 3,599.4 | CUYD | 200.00 | 719,880.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 396.3 | CUYD | 147.00 | 58,256.10 | | 0022 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 28 | SQYD | 220.00 | 6,160.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 2,793.4 | TON | 156.00 | 435,770.40 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 1,483 | SQYD | 14.00 | 20,762.00 | | 0025 | 510-04-00100 | Pavement Patching | 149 | TON | 300.00 | 44,700.00 | | 0026 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 708.9 | SQYD | 120.00 | 85,068.00 | | 0027 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 475 | LNFT | 192.00 | 91,200.00 | | 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 509 | LNFT | 204.00 | 103,836.00 | | 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,257 | LNFT | 228.00 | 286,596.00 | | 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 715 | LNFT | 257.00 | 183,755.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 663 | LNFT | 285.00 | 188,955.00 | | 0032 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 557 | LNFT | 360.00 | 200,520.00 | | 0033 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 758 | LNFT | 428.00 | 324,424.00 | | 0034 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 55 | LNFT | 270.00 | 14,850.00 | | 0035 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 129 | LNFT | 272.00 | 35,088.00 | | 0036 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 21 | LNFT | 375.00 | 7,875.00 | | 0037 | 701-07-00300 | Yard Drain Pipe (8") | 750 | LNFT | 128.00 | 96,000.00 | | 0038 | 701-15-00100 | Concrete Collar | 22 | EACH | 800.00 | 17,600.00 | | 0039 | 702-02-00100 | Manholes (MH-06) | 24 | EACH | 10,900.00 | 261,600.00 | | 0040 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 7,100.00 | 56,800.00 | | 0041 | 702-03-00400 | Catch Basins (CB-05) | 42 | EACH | 2,100.00 | 88,200.00 | | 0042 | 702-03-00600 | Catch Basins (CB-07) | 26 | EACH | 11,500.00 | 299,000.00 | | 0043 | 702-03-00800 | Catch Basins (CB-09) | 11 | EACH | 10,500.00 | 115,500.00 | | 0044 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,800.00 | 7,200.00 | | 0045 | 703-01-00100 | Shoulder Underdrain Systems | 240 | LNFT | 78.00 | 18,720.00 | | 0046 | 703-03-00100 | Perforated Pipe Underdrains | 1,537 | LNFT | 15.00 | 23,055.00 | | 0047 | 703-04-00100 | Nonperforated Pipe Underdrains | 60 | LNFT | 15.00 | 900.00 | | 0048 | 706-01-00100 | Concrete Walk (4" Thick) | 3,306.2 | SQYD | 98.00 | 324,007.60 | | 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 1,924.3 | SQYD | 122.00 | 234,764.60 | | 0050 | 706-04-00110 | Curb Ramps Type 1 | 5.6 | SQYD | 389.00 | 2,178.40 | | 0051 | 706-04-00110 | Curb Ramps Type 2 | 196.6 | SQYD | 388.00 | 76,280.80 | | 0052 | 706-04-00110 | Curb Ramps Type 7 | 44.5 | SQYD | 342.00 | 15,219.00 | | 0053 | 707-01-00100 | Concrete Curb | 224.6 | LNFT | 43.00 | 9,657.80 | | 0054 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,638 | LNFT | 53.00 | 298,814.00 | | 0055 | 710-01-00100 | Flowable Fill | 84.8 | CUYD | 537.00 | 45,537.60 | | 0056 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 179,000.00 | 179,000.00 | | 0057 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.249 | MILE | 1,335.00 | 3,002.42 | | 0058 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,256 | SQYD | 5.50 | 17,908.00 | | 0059 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) ILEX X ATTENUATA SAVANNAH - SAVANNAH HOLLY | 72 | EACH | 334.00 | 24,048.00 | | 0060 | 719-01-02060 | Plants (Tree) (Container) (2-1/2 inch cal) MAGNOLIA VIRGINIANA AUSTRALIS - SWEETBAY MAGNOLIA | 236 | EACH | 334.00 | 78,824.00 | | 0061 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) LIRIOPE MUSCARI 'BIG BLUE' BIG BLUE LILYTURF | 7,457 | EACH | 2.25 | 16,778.25 | | 0062 | 719-02-00100 | Top Dressing Mulch (3" Depth) | 980 | SQYD | 5.56 | 5,448.80 | | 0063 | 726-01-00100 | Bedding Material | 710.3 | CUYD | 113.00 | 80,263.90 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 1,106,950.00 | 1,106,950.00 | | 0065 | 731-02-00100 | Reflectorized Raised Pavement Markers | 61 | EACH | 3.60 | 219.60 | | 0066 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 760 | LNFT | 2.25 | 1,710.00 | | 0067 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 459 | LNFT | 6.75 | 3,098.25 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 703 | LNFT | 11.15 | 7,838.45 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.87 | MILE | 3,300.00 | 6,171.00 | | 0070 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.101 | MILE | 1,700.00 | 171.70 | | 0071 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 328.00 | 328.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 328.00 | 328.00 | | 0073 | 732-04-02010 | Plastic Pavement Legends and Symbols (Shared Lane) | 18 | EACH | 328.00 | 5,904.00 | | 0074 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 328.00 | 328.00 | | 0075 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,000.00 | 2,000.00 | | 0076 | 739-01-00100 | Hydro-Seeding | 1.47 | ACRE | 4,700.00 | 6,909.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | | 0078 | 741-20-01100 | Water Main (8" PVC) | 354 | LNFT | 417.00 | 147,618.00 | | 0079 | 741-20-01130 | Water Main (12" PVC) | 2,759 | LNFT | 225.00 | 620,775.00 | | 0080 | 741-21-00400 | Gate Valve (8") | 7 | EACH | 4,525.00 | 31,675.00 | | 0081 | 741-21-00600 | Gate Valve (12") | 4 | EACH | 10,550.00 | 42,200.00 | | 0082 | 741-24-00100 | Fire Hydrant | 10 | EACH | 12,250.00 | 122,500.00 | | 0083 | 741-28-01080 | Service Connection (1 1/2" PVC) | 1,440 | LNFT | 61.00 | 87,840.00 | | 0084 | 741-35-00100 | Adjust Valve or Meter Box | 40 | EACH | 695.00 | 27,800.00 | | 0085 | 802-03-00500 | Temporary Sheeting Timber/Steel | 25,236 | SQFT | 1.00 | 25,236.00 | | 0086 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 7.2 | CUYD | 3,800.00 | 27,360.00 | | 0087 | 810-04-00100 | Hand Railing | 47 | LNFT | 325.00 | 15,275.00 | | 0088 | NS-300-00060 | Geogrid | 9,427 | SQYD | 3.00 | 28,281.00 | | 0089 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,700 | INLF | 5.00 | 13,500.00 | | 0090 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 21,000 | INLF | 1.00 | 21,000.00 | | 0091 | TS-702-37002 | Sanitary Sewer Conflict Box | 3 | EACH | 25,000.00 | 75,000.00 | | 0092 | TS-702-37004 | Adjusting Sewer Manhole | 10 | EACH | 505.00 | 5,050.00 | | 0093 | TS-715-00010 | Bioretention Soil | 265 | CUYD | 100.00 | 26,500.00 | | 0094 | TS-719-00020 | Pavers | 12,115 | SQFT | 32.00 | 387,680.00 | | 0095 | TS-719-00022 | Concrete Banding 6" X 1'-10.5" | 1,737 | LF | 60.00 | 104,220.00 | | 0096 | TS-719-00050 | Irrigation System | 1 | LUMP | 167,000.00 | 167,000.00 | | 0097 | TS-742-01023 | Cleaning 8 inch | 2,871 | LNFT | 4.00 | 11,484.00 | | 0098 | TS-742-01030 | Lateral Inspection/Cleaning | 37 | EACH | 1,050.00 | 38,850.00 | | 0099 | TS-742-01032 | Lateral Lining PVC 8 inch, cured in place | 37 | EACH | 4,900.00 | 181,300.00 | | 0100 | TS-742-01035 | CCTV 8 inch | 2,871 | LNFT | 4.00 | 11,484.00 | | 0101 | TS-742-10100 | Rehab Sewer Manhole | 18 | EACH | 4,000.00 | 72,000.00 | | 0102 | TS-742-20010 | Pipe Lining (Cured In-Place) 8 inch | 2,871 | LNFT | 55.00 | 157,905.00 | | 0103 | TS-742-37003 | Connection to Existing Manhole Tie-Ins | 12 | EACH | 834.00 | 10,008.00 | | 0104 | TS-742-37071 | Adjust Sewer House Connection | 15 | EACH | 4,300.00 | 64,500.00 | | 0105 | TS-742-80100 | Sewer Line Point Repair Up to twelve feet (8" 0' - 6.0' Deep) | 5 | EACH | 8,300.00 | 41,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,096,801.12 |
|