Proposal:H.012614.6
Parish:De Soto
Routes:LA 175
Description:LA 175: LA 509 TO LA 5
Type Construction:BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$12,360,374.42
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $11,200,271.21 |
| 2 | 17464 | Benton & Brown, LLC. | $12,869,067.84 |
| 3 | 08584 | Madden Contracting Co., LLC | $15,821,424.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | - 3 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 1,023.1 | SQYD | 15.00 | 15,346.50 | 46.87 | 47,952.70 | 90.32 | 92,406.39 | | 0002 | 202-02-06040 | Removal of Concrete Box Headwall Double Barrel 8x8 RCB | 1 | EACH | 1,000.00 | 1,000.00 | 14,000.00 | 14,000.00 | 11,000.00 | 11,000.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall Triple Barrel 8x8 RCB | 2 | EACH | 1,000.00 | 2,000.00 | 16,500.00 | 33,000.00 | 12,000.00 | 24,000.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 2,332.9 | LNFT | 12.00 | 27,994.80 | 13.00 | 30,327.70 | 15.00 | 34,993.50 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVAL OF 2-36" RCP | 24 | LNFT | 100.00 | 2,400.00 | 44.00 | 1,056.00 | 22.00 | 528.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVAL OF 24" RCP | 156 | LNFT | 50.00 | 7,800.00 | 44.00 | 6,864.00 | 22.00 | 3,432.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVAL OF 30" RCP | 60 | LNFT | 75.00 | 4,500.00 | 44.00 | 2,640.00 | 22.00 | 1,320.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 15,991 | CUYD | 30.00 | 479,730.00 | 27.50 | 439,752.50 | 68.80 | 1,100,180.80 | | 0009 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 10.00 | 1,000.00 | 55.00 | 5,500.00 | 50.00 | 5,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 5,060 | LNFT | 2.00 | 10,120.00 | 3.30 | 16,698.00 | 3.00 | 15,180.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 500.00 | 5,000.00 | 1,300.00 | 13,000.00 | 100.00 | 1,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 50,587.1 | TON | 147.50 | 7,461,597.25 | 155.00 | 7,841,000.50 | 178.05 | 9,007,033.16 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,046.1 | TON | 156.55 | 163,766.96 | 300.00 | 313,830.00 | 472.25 | 494,020.73 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 176,875 | SQYD | 5.00 | 884,375.00 | 4.00 | 707,500.00 | 6.29 | 1,112,543.75 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,115 | CUYD | 0.10 | -711.50 | 0.01 | -71.15 | 0.10 | -711.50 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 4,476 | SQYD | 180.00 | 805,680.00 | 250.00 | 1,119,000.00 | 293.40 | 1,313,258.40 | | 0017 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 108 | LNFT | 185.00 | 19,980.00 | 137.50 | 14,850.00 | 325.00 | 35,100.00 | | 0018 | 701-01-01026 | Cross Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 56 | LNFT | 235.00 | 13,160.00 | 165.00 | 9,240.00 | 354.00 | 19,824.00 | | 0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 12 | LNFT | 200.00 | 2,400.00 | 330.00 | 3,960.00 | 315.00 | 3,780.00 | | 0020 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 24 | LNFT | 200.00 | 4,800.00 | 330.00 | 7,920.00 | 360.00 | 8,640.00 | | 0021 | 701-15-00100 | Concrete Collar | 4 | EACH | 750.00 | 3,000.00 | 2,750.00 | 11,000.00 | 1,650.00 | 6,600.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 164 | LNFT | 100.00 | 16,400.00 | 1.10 | 180.40 | 5.00 | 820.00 | | 0023 | 702-07-00100 | Cross Drain Safety End (Type 1) | 6 | EACH | 4,000.00 | 24,000.00 | 8,250.00 | 49,500.00 | 9,600.00 | 57,600.00 | | 0024 | 702-07-00200 | Cross Drain Safety End (Type 2) | 2 | EACH | 6,000.00 | 12,000.00 | 8,250.00 | 16,500.00 | 12,500.00 | 25,000.00 | | 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 960 | LNFT | 90.00 | 86,400.00 | 99.00 | 95,040.00 | 90.00 | 86,400.00 | | 0026 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,472.8 | LNFT | 38.00 | 55,966.40 | 42.00 | 61,857.60 | 36.00 | 53,020.80 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 500 | LNFT | 125.00 | 62,500.00 | 137.50 | 68,750.00 | 135.00 | 67,500.00 | | 0028 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,900.00 | 15,600.00 | 4,300.00 | 17,200.00 | 4,250.00 | 17,000.00 | | 0029 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 20 | EACH | 3,900.00 | 78,000.00 | 4,300.00 | 86,000.00 | 3,900.00 | 78,000.00 | | 0030 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 50.00 | 5,400.00 | 55.00 | 5,940.00 | 100.00 | 10,800.00 | | 0031 | 711-02-00400 | Riprap (55 lb) | 126 | CUYD | 250.00 | 31,500.00 | 220.00 | 27,720.00 | 151.00 | 19,026.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 536,777.00 | 536,777.00 | 677,500.00 | 677,500.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 400 | LNFT | 4.00 | 1,600.00 | 1.20 | 480.00 | 2.00 | 800.00 | | 0034 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 30.577 | MILE | 500.00 | 15,288.50 | 900.00 | 27,519.30 | 300.00 | 9,173.10 | | 0035 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.612 | MILE | 750.00 | 4,959.00 | 900.00 | 5,950.80 | 750.00 | 4,959.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.474 | MILE | 2,500.00 | 13,685.00 | 3,000.00 | 16,422.00 | 2,500.00 | 13,685.00 | | 0037 | 716-01-00100 | Mulch (Vegetative) | 26 | TON | 1,000.00 | 26,000.00 | 935.00 | 24,310.00 | 850.00 | 22,100.00 | | 0038 | 717-01-00100 | Seeding | 780 | LB | 20.00 | 15,600.00 | 22.00 | 17,160.00 | 20.00 | 15,600.00 | | 0039 | 718-01-00100 | Fertilizer | 13,000 | LB | 1.00 | 13,000.00 | 1.00 | 13,000.00 | 0.90 | 11,700.00 | | 0040 | 724-01-00100 | Rumble Strips (Centerline) | 10.258 | MILE | 1,200.00 | 12,309.60 | 1,440.00 | 14,771.52 | 1,200.00 | 12,309.60 | | 0041 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 20.516 | MILE | 1,200.00 | 24,619.20 | 1,440.00 | 29,543.04 | 1,200.00 | 24,619.20 | | 0042 | 726-01-00100 | Bedding Material | 44.9 | CUYD | 100.00 | 4,490.00 | 220.00 | 9,878.00 | 135.00 | 6,061.50 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 536,777.00 | 536,777.00 | 677,500.00 | 677,500.00 | | 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 13 | EACH | 80.00 | 1,040.00 | 88.00 | 1,144.00 | 110.00 | 1,430.00 | | 0045 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 125.00 | 3,000.00 | 137.50 | 3,300.00 | 135.00 | 3,240.00 | | 0046 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,135 | EACH | 15.00 | 17,025.00 | 18.00 | 20,430.00 | 15.00 | 17,025.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,961 | EACH | 7.00 | 13,727.00 | 8.50 | 16,668.50 | 7.00 | 13,727.00 | | 0048 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 592 | LNFT | 20.00 | 11,840.00 | 24.00 | 14,208.00 | 20.00 | 11,840.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 35.602 | MILE | 5,750.00 | 204,711.50 | 6,900.00 | 245,653.80 | 5,750.00 | 204,711.50 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.306 | MILE | 3,000.00 | 9,918.00 | 3,605.00 | 11,918.13 | 3,000.00 | 9,918.00 | | 0051 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.096 | MILE | 20,000.00 | 1,920.00 | 25,000.00 | 2,400.00 | 20,000.00 | 1,920.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 750.00 | 1,500.00 | 900.00 | 1,800.00 | 750.00 | 1,500.00 | | 0053 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,500.00 | 3,000.00 | 1,800.00 | 3,600.00 | 1,500.00 | 3,000.00 | | 0054 | 732-05-00100 | Removal of Existing Markings | 0.09 | MILE | 30,000.00 | 2,700.00 | 36,000.00 | 3,240.00 | 30,000.00 | 2,700.00 | | 0055 | 735-01-00100 | Mailboxes | 42 | EACH | 1.00 | 42.00 | 1.10 | 46.20 | 20.00 | 840.00 | | 0056 | 735-02-00100 | Mailbox Supports (Single) | 36 | EACH | 315.00 | 11,340.00 | 346.50 | 12,474.00 | 290.00 | 10,440.00 | | 0057 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 315.00 | 945.00 | 346.50 | 1,039.50 | 390.00 | 1,170.00 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 180,000.00 | 180,000.00 | | 0059 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Double Barrel 8X8 RCB Steel 1424.50 lbs Concrete 20.87 CuYds | 1 | EACH | 50,000.00 | 50,000.00 | 55,000.00 | 55,000.00 | 55,000.00 | 55,000.00 | | 0060 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Triple Barrel 8x8 RCB Steel 1581.76 lbs Concrete 22.18 CuYds | 2 | EACH | 65,000.00 | 130,000.00 | 60,500.00 | 121,000.00 | 59,000.00 | 118,000.00 | | 0061 | 711-04-00100 | Geotextile Fabric | 252 | SQYD | 3.00 | 756.00 | 4.40 | 1,108.80 | 5.00 | 1,260.00 | | 0062 | 203-03-00100 | Embankment | 34 | CUYD | 75.00 | 2,550.00 | 110.00 | 3,740.00 | 100.00 | 3,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,200,271.21 | | 12,869,067.84 | | 15,821,424.93 |
|