Search


Bid Tabulations for the Letting of 1/8/2025 LA DOTD Headquarters

Proposal:H.011627.6
Parish:Lincoln
Routes:I-20
Description:I-20: BIENVILLE P/L - 0.71 MILE W LA 149
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, REMOVAL OF EXISTING SHOULDER UNDERDRAIN SYSTEMS, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, THIN ASPHALT CONCRETE (OGFC), TEMPORARY QUEUE DETECTION SYSTEM, UNDERDRAIN SYSTEM REPLACEMENT ALTERNATES AND RELATED WORK.
Estimated Construction Cost:$19,327,861.70
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$17,968,396.44
208584Madden Contracting Co., LLC$18,033,178.77


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Madden Contracting Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-02020Removal of Asphalt Pavement 1,193.4   SQYD39.0046,542.6010.0011,934.00
0002202-02-06102Removal of Incidental Concrete Paving 12     SQYD1,000.0012,000.00100.001,200.00
0003202-02-14500Removal of Guard Rail 1,781.8   LNFT17.0030,290.6014.0024,945.20
0004202-02-32100Removal of Pipe (Cross Drain) (54" RCP)24     LNFT250.006,000.0045.001,080.00
0005202-02-32180Removal of Pipe Headwalls 1     EACH2,900.002,900.0012,500.0012,500.00
0006203-01-00100General Excavation 2,201     CUYD65.00143,065.0070.00154,070.00
0007203-07-00100Borrow (Vehicular Measurement) 357     CUYD30.0010,710.0032.0011,424.00
0008204-06-00100Temporary Silt Fencing 25,140     LNFT2.0050,280.002.9574,163.00
0009501-03-00100Thin Asphalt Concrete (OGFC) 17,605.8   TON190.003,345,102.00195.003,433,131.00
0010502-01-00100Asphalt Concrete 39,474.4   TON132.005,210,620.80141.505,585,627.60
0011502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 5,876.2   TON153.00899,058.60161.50949,006.30
0012509-01-00100Milling Asphalt Pavement 274,753     SQYD4.551,250,126.154.251,167,700.25
0013509-02-00100Contractor Retained Reclaimed Asphalt Pavement -18,233     CUYD1.00-18,233.000.01-182.33
0014510-01-00001Pavement Patching (27" Minimum Thickness)389     SQYD345.00134,205.00300.00116,700.00
0015701-01-01102Cross Drain Pipe (54" RCP/RPVCP/CPEPDW) 32     LNFT600.0019,200.001,565.0050,080.00
0016701-15-00100Concrete Collar 2     EACH2,750.005,500.002,800.005,600.00
0017704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 1,462.8   LNFT33.0048,272.4032.5047,541.00
0018704-05-00300Guard Rail Anchor Sections - 31", (Trailing End) 59.4   LNFT141.008,375.40140.008,316.00
0019704-07-00200Guard Rail Transitions (Double Thrie Beam) 150     LNFT135.0020,250.00135.0020,250.00
0020704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 12     EACH3,900.0046,800.003,850.0046,200.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP920,000.00920,000.00785,000.00785,000.00
0022713-02-00300Temporary Pavement Markings (8" Width) 7,413     LNFT0.251,853.250.251,853.25
0023713-02-00500Temporary Pavement Markings (24" Width) 1,225     LNFT1.001,225.001.001,225.00
0024713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 73.76  MILE154.0011,359.04300.0022,128.00
0025713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 73.76  MILE900.0066,384.00850.0062,696.00
0026713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 149.092 MILE1,100.00164,001.201,050.00156,546.60
0027713-11-00100Portable Changeable Message Signs 5     EACH17,000.0085,000.0020,000.00100,000.00
0028716-01-00100Mulch (Vegetative) 30.3   TON900.0027,270.00850.0025,755.00
0029717-01-00100Seeding 908     LB12.0010,896.0020.0018,160.00
0030718-01-00100Fertilizer 15,143     LB0.7511,357.250.8512,871.55
0031724-02-00100Rumble Strips (Shoulder/Edge) 36.88  MILE1,200.0044,256.001,100.0040,568.00
0032727-01-00100Mobilization 1     LUMP950,000.00950,000.00785,000.00785,000.00
0033729-16-00300Object Marker Assembly (Type 3) 13     EACH125.001,625.00125.001,625.00
0034731-02-00100Reflectorized Raised Pavement Markers 5,235     EACH7.0036,645.006.5034,027.50
0035732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 3,707     LNFT3.2512,047.753.2512,047.75
0036732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 612     LNFT19.0011,628.0018.5011,322.00
0037732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 37.273 MILE6,000.00223,638.005,800.00216,183.40
0038732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 18.44  MILE2,800.0051,632.002,750.0050,710.00
0039732-03-02040Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.522 MILE13,000.006,786.0013,000.006,786.00
0040740-01-00100Construction Layout 1     LUMP32,000.0032,000.00250,000.00250,000.00
0041NS-500-00220Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay 97,424     LNFT1.75170,492.001.65160,749.60
0042NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 46,764     LNFT1.1051,440.401.0549,102.20
0043NS-500-00260Sawcuts in Asphalt Concrete Lifts 167,062     LNFT1.00167,062.000.95158,708.90
0044NS-500-00300Traffic Maintenance Asphalt Concrete 50     TON335.0016,750.00150.007,500.00
0045NS-700-00260Temporary Queue Detection System Deployment 1     LUMP72,000.0072,000.0070,000.0070,000.00
0046NS-700-00270Temporary Queue Detection - PCMS 4     EACH12,000.0048,000.0011,250.0045,000.00
0047NS-700-00280Temporary Queue Detection - PQS 8     EACH6,500.0052,000.006,350.0050,800.00
0048NS-704-00003Concrete Strip 12     SQYD3,500.0042,000.00100.001,200.00
  SUBTOTAL GENERAL   14,560,413 14,858,852
         
 Alternate AA2Alternate AA2 (Underdrain System Replacement w/ Underdrain Pipe)      
         
0053602-11-00100Removal of Existing Shoulder Underdrain Systems 97,364     LNFT2.00194,728.002.00194,728.00
0054703-01-00100Shoulder Underdrain Systems 97,364     LNFT26.502,580,146.0024.752,409,759.00
0055703-02-00100Shoulder Outlet Underdrains 419     EACH1,500.00628,500.001,350.00565,650.00
0056732-01-02060Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) 419     LNFT11.004,609.0010.004,190.00
  SUBTOTAL ALT AA2   3,407,983.00 3,174,327.00
         
  CONTRACTOR TOTAL   17,968,396.44 18,033,178.77