Proposal:H.011627.6
Parish:Lincoln
Routes:I-20
Description:I-20: BIENVILLE P/L - 0.71 MILE W LA 149
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, REMOVAL OF EXISTING SHOULDER UNDERDRAIN SYSTEMS, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, THIN ASPHALT CONCRETE (OGFC), TEMPORARY QUEUE DETECTION SYSTEM, UNDERDRAIN SYSTEM REPLACEMENT ALTERNATES AND RELATED WORK.
Estimated Construction Cost:$19,327,861.70
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $17,968,396.44 |
| 2 | 08584 | Madden Contracting Co., LLC | $18,033,178.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 1,193.4 | SQYD | 39.00 | 46,542.60 | 10.00 | 11,934.00 | | 0002 | 202-02-06102 | Removal of Incidental Concrete Paving | 12 | SQYD | 1,000.00 | 12,000.00 | 100.00 | 1,200.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 1,781.8 | LNFT | 17.00 | 30,290.60 | 14.00 | 24,945.20 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (54" RCP) | 24 | LNFT | 250.00 | 6,000.00 | 45.00 | 1,080.00 | | 0005 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 2,900.00 | 2,900.00 | 12,500.00 | 12,500.00 | | 0006 | 203-01-00100 | General Excavation | 2,201 | CUYD | 65.00 | 143,065.00 | 70.00 | 154,070.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 357 | CUYD | 30.00 | 10,710.00 | 32.00 | 11,424.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 25,140 | LNFT | 2.00 | 50,280.00 | 2.95 | 74,163.00 | | 0009 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 17,605.8 | TON | 190.00 | 3,345,102.00 | 195.00 | 3,433,131.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 39,474.4 | TON | 132.00 | 5,210,620.80 | 141.50 | 5,585,627.60 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 5,876.2 | TON | 153.00 | 899,058.60 | 161.50 | 949,006.30 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 274,753 | SQYD | 4.55 | 1,250,126.15 | 4.25 | 1,167,700.25 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -18,233 | CUYD | 1.00 | -18,233.00 | 0.01 | -182.33 | | 0014 | 510-01-00001 | Pavement Patching (27" Minimum Thickness) | 389 | SQYD | 345.00 | 134,205.00 | 300.00 | 116,700.00 | | 0015 | 701-01-01102 | Cross Drain Pipe (54" RCP/RPVCP/CPEPDW) | 32 | LNFT | 600.00 | 19,200.00 | 1,565.00 | 50,080.00 | | 0016 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,750.00 | 5,500.00 | 2,800.00 | 5,600.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,462.8 | LNFT | 33.00 | 48,272.40 | 32.50 | 47,541.00 | | 0018 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 59.4 | LNFT | 141.00 | 8,375.40 | 140.00 | 8,316.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 135.00 | 20,250.00 | 135.00 | 20,250.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 3,900.00 | 46,800.00 | 3,850.00 | 46,200.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 920,000.00 | 920,000.00 | 785,000.00 | 785,000.00 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 7,413 | LNFT | 0.25 | 1,853.25 | 0.25 | 1,853.25 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,225 | LNFT | 1.00 | 1,225.00 | 1.00 | 1,225.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 73.76 | MILE | 154.00 | 11,359.04 | 300.00 | 22,128.00 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 73.76 | MILE | 900.00 | 66,384.00 | 850.00 | 62,696.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 149.092 | MILE | 1,100.00 | 164,001.20 | 1,050.00 | 156,546.60 | | 0027 | 713-11-00100 | Portable Changeable Message Signs | 5 | EACH | 17,000.00 | 85,000.00 | 20,000.00 | 100,000.00 | | 0028 | 716-01-00100 | Mulch (Vegetative) | 30.3 | TON | 900.00 | 27,270.00 | 850.00 | 25,755.00 | | 0029 | 717-01-00100 | Seeding | 908 | LB | 12.00 | 10,896.00 | 20.00 | 18,160.00 | | 0030 | 718-01-00100 | Fertilizer | 15,143 | LB | 0.75 | 11,357.25 | 0.85 | 12,871.55 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 36.88 | MILE | 1,200.00 | 44,256.00 | 1,100.00 | 40,568.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 950,000.00 | 950,000.00 | 785,000.00 | 785,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 13 | EACH | 125.00 | 1,625.00 | 125.00 | 1,625.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,235 | EACH | 7.00 | 36,645.00 | 6.50 | 34,027.50 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,707 | LNFT | 3.25 | 12,047.75 | 3.25 | 12,047.75 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 612 | LNFT | 19.00 | 11,628.00 | 18.50 | 11,322.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 37.273 | MILE | 6,000.00 | 223,638.00 | 5,800.00 | 216,183.40 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 18.44 | MILE | 2,800.00 | 51,632.00 | 2,750.00 | 50,710.00 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.522 | MILE | 13,000.00 | 6,786.00 | 13,000.00 | 6,786.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 32,000.00 | 32,000.00 | 250,000.00 | 250,000.00 | | 0041 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 97,424 | LNFT | 1.75 | 170,492.00 | 1.65 | 160,749.60 | | 0042 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 46,764 | LNFT | 1.10 | 51,440.40 | 1.05 | 49,102.20 | | 0043 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 167,062 | LNFT | 1.00 | 167,062.00 | 0.95 | 158,708.90 | | 0044 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 50 | TON | 335.00 | 16,750.00 | 150.00 | 7,500.00 | | 0045 | NS-700-00260 | Temporary Queue Detection System Deployment | 1 | LUMP | 72,000.00 | 72,000.00 | 70,000.00 | 70,000.00 | | 0046 | NS-700-00270 | Temporary Queue Detection - PCMS | 4 | EACH | 12,000.00 | 48,000.00 | 11,250.00 | 45,000.00 | | 0047 | NS-700-00280 | Temporary Queue Detection - PQS | 8 | EACH | 6,500.00 | 52,000.00 | 6,350.00 | 50,800.00 | | 0048 | NS-704-00003 | Concrete Strip | 12 | SQYD | 3,500.00 | 42,000.00 | 100.00 | 1,200.00 | | | | SUBTOTAL GENERAL | | | | 14,560,413 | | 14,858,852 | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Underdrain System Replacement w/ Underdrain Pipe) | | | | | | | | | | | | | | | | | | 0053 | 602-11-00100 | Removal of Existing Shoulder Underdrain Systems | 97,364 | LNFT | 2.00 | 194,728.00 | 2.00 | 194,728.00 | | 0054 | 703-01-00100 | Shoulder Underdrain Systems | 97,364 | LNFT | 26.50 | 2,580,146.00 | 24.75 | 2,409,759.00 | | 0055 | 703-02-00100 | Shoulder Outlet Underdrains | 419 | EACH | 1,500.00 | 628,500.00 | 1,350.00 | 565,650.00 | | 0056 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 419 | LNFT | 11.00 | 4,609.00 | 10.00 | 4,190.00 | | | | SUBTOTAL ALT AA2 | | | | 3,407,983.00 | | 3,174,327.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,968,396.44 | | 18,033,178.77 |
|