Proposal:H.011014.6
Parish:Livingston
Routes:LA 3002
Description:LA 3002: U-TURN
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$770,756.00
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $531,973.63 |
| 2 | 72429 | Arbour Construction, LLC | $544,577.59 |
| 3 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $572,389.98 |
| 4 | 34263 | La Contracting Enterprise LLC | $615,500.00 |
| 5 | 68424 | Procivil, LLC | $620,562.25 |
| 6 | 48896 | Command Construction Industries LLC | $632,301.18 |
| 7 | 68237 | GULF STATES SERVICES, LLC | $708,524.14 |
| 8 | 70957 | Manchac Contractors, LLC | $749,434.10 |
| 9 | 46747 | Triumph Construction, LLC | $757,000.00 |
| 10 | 74839 | 21 Construction, L.L.C. | $771,198.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - Arbour Construction, LLC | - 3 - KORT's CONSTRUCTION SERVICES, INC. | - 4 - La Contracting Enterprise LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.603 | LUMP | 35,000.00 | 35,000.00 | 15,080.00 | 15,080.00 | 20,000.00 | 20,000.00 | 53,999.38 | 53,999.38 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,500.00 | 10,500.00 | 23,200.00 | 23,200.00 | 10,000.00 | 10,000.00 | 17,200.00 | 17,200.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 68.9 | SQYD | 17.75 | 1,222.98 | 35.00 | 2,411.50 | 45.00 | 3,100.50 | 50.00 | 3,445.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 231 | SQYD | 28.00 | 6,468.00 | 20.00 | 4,620.00 | 20.00 | 4,620.00 | 19.00 | 4,389.00 | | 0005 | 203-01-00100 | General Excavation | 969 | CUYD | 40.00 | 38,760.00 | 28.00 | 27,132.00 | 30.00 | 29,070.00 | 17.00 | 16,473.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 38.00 | 266.00 | 30.00 | 210.00 | 30.00 | 210.00 | 30.00 | 210.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 758 | LNFT | 2.25 | 1,705.50 | 2.32 | 1,758.56 | 2.50 | 1,895.00 | 2.00 | 1,516.00 | | 0008 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,012 | SQYD | 43.50 | 44,022.00 | 40.00 | 40,480.00 | 38.00 | 38,456.00 | 45.00 | 45,540.00 | | 0009 | 304-01-00100 | Lime | 7.18 | TON | 325.00 | 2,333.50 | 275.00 | 1,974.50 | 250.00 | 1,795.00 | 400.00 | 2,872.00 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 506 | SQYD | 7.00 | 3,542.00 | 15.00 | 7,590.00 | 2.00 | 1,012.00 | 7.00 | 3,542.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 9.44 | CUYD | 140.00 | 1,321.60 | 100.00 | 944.00 | 135.00 | 1,274.40 | 151.00 | 1,425.44 | | 0012 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 912.6 | SQYD | 110.00 | 100,386.00 | 115.00 | 104,949.00 | 112.00 | 102,211.20 | 120.00 | 109,512.00 | | 0013 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 395 | LNFT | 90.00 | 35,550.00 | 105.00 | 41,475.00 | 105.00 | 41,475.00 | 79.00 | 31,205.00 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 111 | LNFT | 100.00 | 11,100.00 | 110.00 | 12,210.00 | 120.00 | 13,320.00 | 109.00 | 12,099.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | 1,160.00 | 1,160.00 | 2,000.00 | 2,000.00 | 2,400.00 | 2,400.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 333 | LNFT | 5.00 | 1,665.00 | 1.00 | 333.00 | 15.00 | 4,995.00 | 5.00 | 1,665.00 | | 0017 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | 4,300.00 | 4,300.00 | 4,000.00 | 4,000.00 | | 0018 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 5,600.00 | 56,000.00 | 5,800.00 | 58,000.00 | 8,000.00 | 80,000.00 | 7,300.00 | 73,000.00 | | 0019 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 17,700.00 | 17,700.00 | | 0020 | 703-01-00100 | Shoulder Underdrain Systems | 531.5 | LNFT | 26.00 | 13,819.00 | 29.00 | 15,413.50 | 30.00 | 15,945.00 | 31.00 | 16,476.50 | | 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 52.3 | SQYD | 70.00 | 3,661.00 | 110.00 | 5,753.00 | 85.00 | 4,445.50 | 133.00 | 6,955.90 | | 0022 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 596.1 | SQYD | 60.00 | 35,766.00 | 60.00 | 35,766.00 | 70.00 | 41,727.00 | 56.00 | 33,381.60 | | 0023 | 707-01-00100 | Concrete Curb | 1,217.4 | LNFT | 14.00 | 17,043.60 | 28.00 | 34,087.20 | 19.00 | 23,130.60 | 16.00 | 19,478.40 | | 0024 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 700.00 | 6,300.00 | 638.00 | 5,742.00 | 750.00 | 6,750.00 | 600.00 | 5,400.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 300.00 | 2,700.00 | 87.00 | 783.00 | 250.00 | 2,250.00 | 200.00 | 1,800.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,000.00 | 11,000.00 | 14,500.00 | 14,500.00 | 32,000.00 | 32,000.00 | 23,000.00 | 23,000.00 | | 0027 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.499 | MILE | 11,000.00 | 5,489.00 | 11,020.00 | 5,498.98 | 11,000.00 | 5,489.00 | 10,000.00 | 4,990.00 | | 0028 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 147 | EACH | 7.25 | 1,065.75 | 7.54 | 1,108.38 | 8.00 | 1,176.00 | 7.00 | 1,029.00 | | 0029 | 726-01-00100 | Bedding Material | 56.3 | CUYD | 148.00 | 8,332.40 | 130.00 | 7,319.00 | 150.00 | 8,445.00 | 149.00 | 8,388.70 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 59,000.00 | 59,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 73.24 | SQFT | 33.00 | 2,416.92 | 35.00 | 2,563.40 | 25.00 | 1,831.00 | 21.00 | 1,538.04 | | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 16 | EACH | 165.00 | 2,640.00 | 175.00 | 2,800.00 | 195.00 | 3,120.00 | 163.00 | 2,608.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 147 | EACH | 7.25 | 1,065.75 | 7.54 | 1,108.38 | 8.00 | 1,176.00 | 7.00 | 1,029.00 | | 0034 | 731-03-00100 | Removal of Raised Pavement Markers | 0.499 | MILE | 275.00 | 137.23 | 290.00 | 144.71 | 300.00 | 149.70 | 262.00 | 130.74 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 866 | LNFT | 2.75 | 2,381.50 | 2.90 | 2,511.40 | 3.00 | 2,598.00 | 2.75 | 2,381.50 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 202 | LNFT | 13.25 | 2,676.50 | 13.92 | 2,811.84 | 15.00 | 3,030.00 | 13.00 | 2,626.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.27 | MILE | 5,500.00 | 1,485.00 | 5,800.00 | 1,566.00 | 6,000.00 | 1,620.00 | 5,300.00 | 1,431.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.116 | MILE | 1,650.00 | 191.40 | 1,740.00 | 201.84 | 1,780.00 | 206.48 | 1,600.00 | 185.60 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.097 | MILE | 5,500.00 | 533.50 | 5,800.00 | 562.60 | 5,800.00 | 562.60 | 5,300.00 | 514.10 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 385.00 | 385.00 | 406.00 | 406.00 | 400.00 | 400.00 | 375.00 | 375.00 | | 0041 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 385.00 | 770.00 | 406.00 | 812.00 | 400.00 | 800.00 | 375.00 | 750.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 385.00 | 385.00 | 406.00 | 406.00 | 400.00 | 400.00 | 375.00 | 375.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.499 | MILE | 5,500.00 | 2,744.50 | 5,800.00 | 2,894.20 | 6,000.00 | 2,994.00 | 5,400.00 | 2,694.60 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.081 | ACRE | 12,000.00 | 972.00 | 40,600.00 | 3,288.60 | 40,000.00 | 3,240.00 | 11,000.00 | 891.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 14,500.00 | 14,500.00 | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | | 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,585 | INLF | 2.00 | 9,170.00 | 1.20 | 5,502.00 | 2.00 | 9,170.00 | 1.50 | 6,877.50 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 531,973.63 | | 544,577.59 | | 572,389.98 | | 615,500.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Procivil, LLC | - 6 - Command Construction Industries LLC | - 7 - GULF STATES SERVICES, LLC | - 8 - Manchac Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.603 | LUMP | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | 22,000.00 | 22,000.00 | 16,000.00 | 16,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 68.9 | SQYD | 25.00 | 1,722.50 | 50.00 | 3,445.00 | 50.00 | 3,445.00 | 60.00 | 4,134.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 231 | SQYD | 25.00 | 5,775.00 | 50.00 | 11,550.00 | 50.00 | 11,550.00 | 20.00 | 4,620.00 | | 0005 | 203-01-00100 | General Excavation | 969 | CUYD | 40.00 | 38,760.00 | 50.00 | 48,450.00 | 40.00 | 38,760.00 | 26.30 | 25,484.70 | | 0006 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 150.00 | 1,050.00 | 25.00 | 175.00 | 5.00 | 35.00 | 21.00 | 147.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 758 | LNFT | 3.00 | 2,274.00 | 1.00 | 758.00 | 0.10 | 75.80 | 4.70 | 3,562.60 | | 0008 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,012 | SQYD | 50.00 | 50,600.00 | 50.00 | 50,600.00 | 55.00 | 55,660.00 | 86.84 | 87,882.08 | | 0009 | 304-01-00100 | Lime | 7.18 | TON | 200.00 | 1,436.00 | 1.00 | 7.18 | 250.00 | 1,795.00 | 406.00 | 2,915.08 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 506 | SQYD | 10.00 | 5,060.00 | 1.00 | 506.00 | 10.00 | 5,060.00 | 42.00 | 21,252.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 9.44 | CUYD | 50.00 | 472.00 | 100.00 | 944.00 | 125.00 | 1,180.00 | 43.00 | 405.92 | | 0012 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 912.6 | SQYD | 145.00 | 132,327.00 | 150.00 | 136,890.00 | 125.00 | 114,075.00 | 193.00 | 176,131.80 | | 0013 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 395 | LNFT | 125.00 | 49,375.00 | 150.00 | 59,250.00 | 130.00 | 51,350.00 | 72.00 | 28,440.00 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 111 | LNFT | 145.00 | 16,095.00 | 150.00 | 16,650.00 | 175.00 | 19,425.00 | 163.00 | 18,093.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | 960.00 | 960.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 333 | LNFT | 2.00 | 666.00 | 1.00 | 333.00 | 1.00 | 333.00 | 18.60 | 6,193.80 | | 0017 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 7,320.00 | 7,320.00 | | 0018 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 7,500.00 | 75,000.00 | 10,000.00 | 100,000.00 | 10,000.00 | 100,000.00 | 4,860.00 | 48,600.00 | | 0019 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 15,000.00 | 15,000.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 9,305.00 | 9,305.00 | | 0020 | 703-01-00100 | Shoulder Underdrain Systems | 531.5 | LNFT | 30.00 | 15,945.00 | 25.00 | 13,287.50 | 30.00 | 15,945.00 | 17.30 | 9,194.95 | | 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 52.3 | SQYD | 100.00 | 5,230.00 | 100.00 | 5,230.00 | 135.00 | 7,060.50 | 93.60 | 4,895.28 | | 0022 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 596.1 | SQYD | 20.00 | 11,922.00 | 1.00 | 596.10 | 75.00 | 44,707.50 | 88.00 | 52,456.80 | | 0023 | 707-01-00100 | Concrete Curb | 1,217.4 | LNFT | 20.00 | 24,348.00 | 1.00 | 1,217.40 | 32.00 | 38,956.80 | 31.00 | 37,739.40 | | 0024 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 750.00 | 6,750.00 | 1.00 | 9.00 | 600.00 | 5,400.00 | 630.00 | 5,670.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 300.00 | 2,700.00 | 1.00 | 9.00 | 200.00 | 1,800.00 | 205.00 | 1,845.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 11,800.00 | 11,800.00 | | 0027 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.499 | MILE | 10,000.00 | 4,990.00 | 9,000.00 | 4,491.00 | 9,500.00 | 4,740.50 | 18.00 | 8.98 | | 0028 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 147 | EACH | 8.00 | 1,176.00 | 6.00 | 882.00 | 6.50 | 955.50 | 26.00 | 3,822.00 | | 0029 | 726-01-00100 | Bedding Material | 56.3 | CUYD | 100.00 | 5,630.00 | 125.00 | 7,037.50 | 1.00 | 56.30 | 119.00 | 6,699.70 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | 55,000.00 | 55,000.00 | 35,000.00 | 35,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 73.24 | SQFT | 25.00 | 1,831.00 | 50.00 | 3,662.00 | 26.00 | 1,904.24 | 22.00 | 1,611.28 | | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 16 | EACH | 175.00 | 2,800.00 | 200.00 | 3,200.00 | 155.00 | 2,480.00 | 16.00 | 256.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 147 | EACH | 8.00 | 1,176.00 | 6.00 | 882.00 | 6.50 | 955.50 | 8.00 | 1,176.00 | | 0034 | 731-03-00100 | Removal of Raised Pavement Markers | 0.499 | MILE | 250.00 | 124.75 | 500.00 | 249.50 | 250.00 | 124.75 | 2,052.00 | 1,023.95 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 866 | LNFT | 5.00 | 4,330.00 | 2.00 | 1,732.00 | 2.50 | 2,165.00 | 18.00 | 15,588.00 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 202 | LNFT | 15.00 | 3,030.00 | 15.00 | 3,030.00 | 12.00 | 2,424.00 | 24.00 | 4,848.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.27 | MILE | 6,000.00 | 1,620.00 | 6,000.00 | 1,620.00 | 5,000.00 | 1,350.00 | 4,500.00 | 1,215.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.116 | MILE | 2,000.00 | 232.00 | 2,000.00 | 232.00 | 1,500.00 | 174.00 | 4,800.00 | 556.80 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.097 | MILE | 5,000.00 | 485.00 | 6,000.00 | 582.00 | 5,000.00 | 485.00 | 2,600.00 | 252.20 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 350.00 | 350.00 | 450.00 | 450.00 | | 0041 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 350.00 | 700.00 | 450.00 | 900.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 350.00 | 350.00 | 450.00 | 450.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.499 | MILE | 5,000.00 | 2,495.00 | 6,000.00 | 2,994.00 | 5,000.00 | 2,495.00 | 1,025.00 | 511.48 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.081 | ACRE | 50,000.00 | 4,050.00 | 15,000.00 | 1,215.00 | 31,000.00 | 2,511.00 | 6,300.00 | 510.30 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | | 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,585 | INLF | 1.00 | 4,585.00 | 1.00 | 4,585.00 | 1.35 | 6,189.75 | 3.60 | 16,506.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 620,562.25 | | 632,301.18 | | 708,524.14 | | 749,434.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Triumph Construction, LLC | - 10 - 21 Construction, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.603 | LUMP | 17,100.00 | 17,100.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 29,570.00 | 29,570.00 | 60,000.00 | 60,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 68.9 | SQYD | 67.92 | 4,679.69 | 60.00 | 4,134.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 231 | SQYD | 21.52 | 4,971.12 | 17.50 | 4,042.50 | | 0005 | 203-01-00100 | General Excavation | 969 | CUYD | 20.88 | 20,232.72 | 20.00 | 19,380.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 180.00 | 1,260.00 | 35.00 | 245.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 758 | LNFT | 3.75 | 2,842.50 | 4.50 | 3,411.00 | | 0008 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,012 | SQYD | 35.09 | 35,511.08 | 45.00 | 45,540.00 | | 0009 | 304-01-00100 | Lime | 7.18 | TON | 330.08 | 2,369.97 | 450.00 | 3,231.00 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 506 | SQYD | 23.18 | 11,729.08 | 10.00 | 5,060.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 9.44 | CUYD | 282.84 | 2,670.01 | 150.00 | 1,416.00 | | 0012 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 912.6 | SQYD | 121.93 | 111,273.32 | 145.00 | 132,327.00 | | 0013 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 395 | LNFT | 98.61 | 38,950.95 | 135.00 | 53,325.00 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 111 | LNFT | 114.68 | 12,729.48 | 150.00 | 16,650.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,480.00 | 2,480.00 | 2,500.00 | 2,500.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 333 | LNFT | 26.67 | 8,881.11 | 10.00 | 3,330.00 | | 0017 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,090.00 | 4,090.00 | 7,000.00 | 7,000.00 | | 0018 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 8,687.00 | 86,870.00 | 8,450.00 | 84,500.00 | | 0019 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 12,970.00 | 12,970.00 | 13,000.00 | 13,000.00 | | 0020 | 703-01-00100 | Shoulder Underdrain Systems | 531.5 | LNFT | 40.56 | 21,557.64 | 21.00 | 11,161.50 | | 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 52.3 | SQYD | 126.77 | 6,630.07 | 110.00 | 5,753.00 | | 0022 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 596.1 | SQYD | 47.63 | 28,392.24 | 65.00 | 38,746.50 | | 0023 | 707-01-00100 | Concrete Curb | 1,217.4 | LNFT | 22.48 | 27,367.15 | 24.00 | 29,217.60 | | 0024 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 124.44 | 1,119.96 | 600.00 | 5,400.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 153.33 | 1,379.97 | 200.00 | 1,800.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 39,310.00 | 39,310.00 | 55,000.00 | 55,000.00 | | 0027 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.499 | MILE | 961.92 | 480.00 | 897.00 | 447.60 | | 0028 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 147 | EACH | 3.61 | 530.67 | 3.35 | 492.45 | | 0029 | 726-01-00100 | Bedding Material | 56.3 | CUYD | 117.23 | 6,600.05 | 135.00 | 7,600.50 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 162,714.03 | 162,714.03 | 70,000.00 | 70,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 73.24 | SQFT | 73.24 | 5,364.10 | 28.00 | 2,050.72 | | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 16 | EACH | 180.00 | 2,880.00 | 335.00 | 5,360.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 147 | EACH | 3.95 | 580.65 | 3.65 | 536.55 | | 0034 | 731-03-00100 | Removal of Raised Pavement Markers | 0.499 | MILE | 300.60 | 150.00 | 280.00 | 139.72 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 866 | LNFT | 4.20 | 3,637.20 | 3.95 | 3,420.70 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 202 | LNFT | 12.62 | 2,549.24 | 12.00 | 2,424.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.27 | MILE | 10,814.81 | 2,920.00 | 11,000.00 | 2,970.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.116 | MILE | 3,620.69 | 420.00 | 3,360.00 | 389.76 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.097 | MILE | 8,453.61 | 820.00 | 7,845.00 | 760.97 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 360.00 | 360.00 | 336.00 | 336.00 | | 0041 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 600.00 | 1,200.00 | 560.00 | 1,120.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 600.00 | 600.00 | 336.00 | 336.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.499 | MILE | 6,000.00 | 2,994.00 | 5,600.00 | 2,794.40 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.081 | ACRE | 24,074.07 | 1,950.00 | 12,000.00 | 972.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,810.00 | 17,810.00 | 21,000.00 | 21,000.00 | | 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,585 | INLF | 1.20 | 5,502.00 | 1.50 | 6,877.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 757,000.00 | | 771,198.97 |
|